Skip to content
PlanIndex Get alerts
Menu

Planning application

70 BEMPTON DRIVE RUISLIP HA4 9DE

Granted Hillingdon 79919/APP/2026/380 Full

Works: Loft or dormer

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of roof space to habitable use to include a rear dormer with juliette balcony and 3 front roof lights (Application for a Certificate of Lawful Development for a Proposed Development)

As published by the council, reference 79919/APP/2026/380

Application record

Reference
79919/APP/2026/380
Type
Full
Status
Approval
Decision
Permitted
Received
13 Feb 2026
Validated
13 Feb 2026
Decided
21 Apr 2026
Ward
RUISLIP MANOR 2022
Postcode
HA4 9DE

Timeline

Dates from the published record

  1. 13 Feb 2026

    Received by Hillingdon

  2. 21 Apr 2026

    Decision issued: Permitted

  3. 12 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 70 BEMPTON DRIVE RUISLIP HA4 9DE

    79919/APP/2026/379 Submitted 13 Feb 2026 0m away

    Erection of a single storey rear extension, following demolition of existing rear extension.

    Granted Full applications Extension Demolition 6 docs
    Small domestic
  • 24 WHITBY ROAD RUISLIP HA4 9DP

    79902/APP/2026/293 Submitted 3 Feb 2026 139m away

    Erection of single storey rear extension (Application for a Certificate of Lawful Development for a Proposed Development)

    Granted Full applications Extension 8 docs
    Small domestic
  • 59 LYNMOUTH DRIVE RUISLIP HA4 9BY

    61322/APP/2024/2444 Submitted 11 Sep 2024 149m away

    Erection of a first floor extension to the side

    Granted Full applications Extension 6 docs
  • 60 BEMPTON DRIVE RUISLIP HA4 9DD

    77291/APP/2025/2302 Submitted 29 Aug 2025 178m away

    Erection of rear outbuilding to dwelling house. Use for office / library space.

    Granted Full applications 7 docs
    Small domestic
  • 32 BEMPTON DRIVE RUISLIP HA4 9DD

    76965/APP/2024/2823 Submitted 24 Oct 2024 178m away

    Erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 4.00 metres, for which the maximum height would be 3.40 metres, and for which the height of the eaves would be 3.00 metres.

    Granted Full applications Extension 12 docs
    Small domestic
  • 132 DARTMOUTH ROAD RUISLIP HA4 0DG

    80217/APP/2026/1996 Submitted 12 Aug 2026 197m away

    87% historically approved · decision due ~7 Oct

    Conversion of roof space to habitable use to include a rear dormer roof extension with juliet balcony, 3 front roofights (Application for a Certificate of Lawful Development for a Proposed Development)

    Decided Full applications Extension Loft or dormer 3 docs

In Hillingdon

  • 14 LADYGATE LANE RUISLIP HA4 7QU

    Erection of single storey side and rear wraparound extension, a front porch, amendments to fenestration and roof lights to the front, side and rear sloped roof, following the removal of the rear chimney and garden shed. (Description Amended)

    24 Jun 2026 Full applications
  • 21 NORTH AVENUE HAYES UB3 2JE

    Erection of part single storey, part double storey rear extension

    13 Jul 2026 Full applications
  • 32 MANOR ROAD HAYES UB3 2DG

    Erection of a first-floor rear extension.

    1 Jun 2026 Full applications
  • 50 MINET DRIVE HAYES UB3 3JW

    Erection of a part single storey, part two storey extension to the rear

    1 Jul 2026 Full applications
  • 6 SQUIRRELS TRADING ESTATE VIVEASH CLOSE HAYES UB3 4RZ

    Change of use from Class B8 to Class E retail

    8 Jul 2026 Full applications