Planning application
Union Park UP4 NORTH HYDE GARDENS HAYES UB3 4QQ
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Redevelopment of site to deliver extension to existing Union Park data centre campus consisting of (a) free standing data centre building; (b) energy, power, and water infrastructure; (c) site access and internal roads; (d) site security arrangements; (e) hard and soft, green landscaping; and (f) other ancillary and auxiliary forms of development.
As published by the council, reference 75111/APP/2025/739
Application record
- Reference
- 75111/APP/2025/739
- Type
- Full
- Status
- Approval
- Decision
- Granted As published: Permitted
- Received
- 18 Mar 2025
- Validated
- 2 Apr 2025
- Decided
- 9 Sep 2025
- Ward
- PINKWELL 2022
- Postcode
- UB3 4QQ
Timeline
Dates from the published record
-
18 Mar 2025
Received by Hillingdon
-
2 Apr 2025
Validated
Checked as complete and ready for consideration.
-
9 Sep 2025
Decision issued: Permitted
-
26 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
191 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Hillingdon granted permission on 9 September 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land at Bulls Bridge Industrial Estate NORTH HYDE GARDENS HAYES UB3 4QQ
Details pursuant to the partial discharge of Condition 15 (Drainage Verification) in relation to Energy Centre 2 (EC2), EC3, and Visitor Reception Centre 2 (VRC2) as attached to planning permission ref. 5111/APP/2022/1007 dated 21-09-2022 (Full planning permission for site clearance and preparation, including the demolition of remaining buildings, and the redevelopment of the site to provide three energy centres, two visitor reception centres, a new footpath and cycleway link to the canal towpath, works to the highway, car parking, cycle parking, associated infrastructure, enclosures and necessary physical security systems, hard and soft landscaping, and ancillary uses, as well as associated external works).
Granted Full applications Demolition 91 docs -
Land at Bulls Bridge Industrial Estate NORTH HYDE GARDENS HAYES UB3 4QQ
Details pursuant to the partial discharge of Condition 17 (Drainage Verification) in relation to Union Park 2 (UP2) and UP3 only as attached to planning permission ref. 75111/APP/2020/1955 dated 15-04-2021 (Site clearance and preparation, including the demolition of remaining buildings, and the redevelopment of the site to provide: a new data centre (Use Class B8), a HV Sub-Station, works to the highway, car parking, cycle parking, associated infrastructure, enclosures and necessary physical security systems, hard and soft landscaping (including works to the River Crane) and ancillary uses, as well as associated external works.)
Granted Full applications Demolition 93 docs -
National Grid 66kV Compound NORTH HYDE GARDENS HAYES UB3 4QQ
Installation of two new transformer bays within the existing North Hyde Substation (National Grid 66kV compound).
Granted Full applications 10 docs -
Land at Bulls Bridge Industrial Estate NORTH HYDE GARDENS HAYES UB3 4QQ
Details pursuant to the partial discharge of Condition 28 parts (i), (a), (b) and (c) (Contaminated Land) and full discharge of Conditions 27 (Piling Method Statement), 29 (EA - Remediation), and 31 (EA - Long Term Monitoring) as attached to planning permission ref. 75111/APP/2022/1007 dated 21-09-2021 (Full planning permission for site clearance and preparation, including the demolition of remaining buildings, and the redevelopment of the site to provide three energy centres, two visitor reception centres, a new footpath and cycleway link to the canal towpath, works to the highway, car parking, cycle parking, associated infrastructure, enclosures and necessary physical security systems, hard and soft landscaping, and ancillary uses, as well as associated external works).
Granted Full applications Demolition 19 docs -
Land at Bulls Bridge Industrial Estate NORTH HYDE GARDENS HAYES UB3 4QQ
Details pursuant to the discharge of Conditions 13 (Ecological Enhancement), 14 (Sustainable Water Management) and 33 (EA - SuDs Infiltration) as attached to planning permission ref. 75111/APP/2022/1007 dated 21-09-2021 (Full planning permission for site clearance and preparation, including the demolition of remaining buildings, and the redevelopment of the site to provide three energy centres, two visitor reception centres, a new footpath and cycleway link to the canal towpath, works to the highway, car parking, cycle parking, associated infrastructure, enclosures and necessary physical security systems, hard and soft landscaping, and ancillary uses, as well as associated external works).
Granted Full applications Demolition 13 docs -
Land at Bulls Bridge Industrial Estate NORTH HYDE GARDENS HAYES UB3 4QQ
Details pursuant to the partial discharge (for the Former BA Plot and the Former Vodafone Plot) of Conditions 31 (Contaminated Land), 33 (EA - Remediation) and 35 (EA - Long Term Monitoring) as attached to planning permission ref. 75111/APP/2020/1955 dated 15.04.2021 (Site clearance and preparation, including the demolition of remaining buildings, and the redevelopment of the site to provide: a new data centre (Use Class B8), two MV Energy Centres (including stand-by generation plant and gas storage), a HV Sub-Station, a visitor reception centre, plant, the creation of a new footpath and cycleway link to the canal towpath, works to the highway, car parking, cycle parking, associated infrastructure, enclosures and necessary physical security systems, hard and soft landscaping (including works to the River Crane) and ancillary uses, as well as associated external works).
Granted Full applications Demolition 36 docs
Other full applications
In Hillingdon
-
16034/APP/2026/217 Awaiting decision
ROSEDALE COLLEGE WOOD END GREEN ROAD HAYES UB3 2SE
Details pursuant to the discharge of Condition 27 (Fire Strategy) of planning permission ref. 16034/APP/2023/2812, dated 10-01-2025 for 'Redevelopment of the Rosedale College site to provide improved teaching and sports facilities. Proposed works to include demolition and renovation of existing buildings, the erection of 2 new buildings, a plant room, social and dining canopies, multi-use games areas, sports fields and football pitches, new parking area and provision of associated infrastructure. Pupil number to remain unchanged).'
-
3638/APP/2026/1538 Refused
FORMER REGAL CINEMA 233 HIGH STREET UXBRIDGE UB8 1LD
Change of use of existing nightclub (Sui Generis) to a banqueting suite (Sui Generis) and development of a hotel (Use Class C1) including the change of use of existing gymnasium (Use Class E) and associated landscaping, car, and cycle spaces (Part retrospective).
-
80157/APP/2026/1606 Awaiting decision
9 & 11 PINKWELL LANE HAYES UB3 1PQ
Joint application for a single storey rear & front extension. Followed by demolition of existing rear conservatory & sheds.
-
76676/APP/2026/2023 Awaiting decision
87 NORTH VIEW EASTCOTE HA5 1PX
Erection of a single storey wrap around side and rear extension
-
22901/APP/2026/2013 Awaiting decision
THE RANCHER RICKMANSWORTH ROAD HAREFIELD UB9 6JX
Erection of single storey front infill and side extension