Proposal

Use as 2 self-contained flats ( 1 x 2 bedroom and 1 x 1 bedroom) (Application for a Certificate of Lawful Development for an Existing Development)

As published by the council, reference 69504/APP/2021/1599

Timeline

Dates from the published record

  1. 22 Apr 2021

    Received by Hillingdon

  2. 28 Apr 2021

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2021

    Decision issued: Permitted

  4. 30 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 96 BOURNE AVENUE HAYES UB3 1QP

    Details pursuant to the discharge of Conditions 3 (Materials), 4 (Landscape), 5(Step Free Access) of planning permission ref. 76034/APP/2026/710, dated 01-06-2026 (Erection of 1no. 2 storey dwellinghouse with associated parking, bin store, and landscaping, following demolition of existing outbuilding)

    19 Jun 2026 157m away Full applications
  • 100 DAWLEY ROAD HAYES UB3 1NE

    Erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 4 metres, for which the maximum height would be 3.7 metres, and for which the height of the eaves would be 3 metres

    26 Jun 2017 311m away Full applications
  • LAND BETWEEN BUILDINGS 2 and 5, HYDE PARK MILLINGTON ROAD HAYES UB3 4FJ

    Installation of 2 single storey containers for use as a cafe with associated external works

    28 May 2021 341m away Full applications
  • 28 GLAMIS CRESCENT HAYES UB3 1QB

    Erection of a part single storey, part two storey rear extension including demolition of the existing garage structure.

    22 Jul 2024 433m away Full applications
  • Land at HPH2, HPH5, and Multistorey Car Park Hyde Park Hayes MILLINGTON ROAD HAYES UB3 4AZ

    Outline planning permission (with all matters reserved excluding access) for demolition of existing buildings (above basement level) and phased delivery of residential development (Class C3), flexible commercial / community floorspace, new public realm, landscaping, play space, car parking, cycle parking and associated works.

    11 Aug 2025 446m away Full applications
  • HPH4 MILLINGTON ROAD HAYES UB3 4AZ

    Details pursuant to the full discharge of Conditions 8 (Ecological Enhancement Scheme), 9 (Tree Protection), 16 (Construction Management and Logistics Plan), 21 (Sustainable Water Management) and partial discharge of Condition 22 parts (i)(a) and (b) (Contaminated Land) as attached to planning permission ref. 76655/APP/2023/779 dated 26-06-2023 (Variation of Condition 2 (Accordance with Approved Plans) of planning permission ref. 76655/APP/2021/3039 dated 07-04-2022 (Re-development of the vacant Site to provide a residential development comprising 131 (C3) residential units, with associated amenity areas, landscaping, car parking and all ancillary and enabling works) to alter the internal layouts and replace 13 no. studio units with 13 no. one-bedroom units.)

    23 Jul 2024 446m away Full applications

In Hillingdon

  • National Grid 66kV Compound NORTH HYDE GARDENS HAYES UB3 4QQ

    Installation of two new transformer bays within the existing North Hyde Substation (National Grid 66kV compound).

    16 Jun 2026 Full applications
  • 90 WHITETHORN AVENUE YIEWSLEY UB7 8LA

    Erection of outbuilding to rear garden (Application for a Certificate of Lawful Development for a Proposed Development)

    18 Jun 2026 Full applications
  • UNION WHARF BENTINCK ROAD WEST DRAYTON MIDDLESEX UB7 7RP

    Replacement of external materials from spandrel panels to non-combustible alternative (aluminium spandrel panels, replacement of two timber soffits at rear to non-combustible material.

    2 Apr 2026 Full applications
  • 3 BELMONT CLOSE UXBRIDGE UB8 1RF

    Installation of 3no. roof lights, side door, porch and change of elevation finish from render to brickwork

    2 Apr 2026 Full applications
  • 53 ACACIA AVENUE YIEWSLEY UB7 8LW

    Erection of a single storey rear extension, which would extend beyond the rear wall of the original house by 4.00 metres, for which the maximum height would be 3.00 metres, and for which the height of the eaves would be 3.00 metres.

    29 Jun 2026 Full applications