Planning application
2 HASTOE CLOSE HAYES
Works: Extension Loft or dormer Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a single storey rear extension, and conversion of roof space to habitable use comprising of a single dormer window on the rear roof slope with 1no. roof light to the rear and 2no. roof lights to the front roof slope with internal alterations
As published by the council, reference 59585/APP/2025/2567
Application record
- Reference
- 59585/APP/2025/2567
- Status
- Approval
- Received
- 3 Oct 2025
- Validated
- 6 Oct 2025
- Decided
- 26 Nov 2025
Timeline
Dates from the published record
-
3 Oct 2025
Received by Hillingdon
-
6 Oct 2025
Validated
Checked as complete and ready for consideration.
-
26 Nov 2025
Decision issued
-
7 Aug 2026
Added to PlanIndex
Documents
The council's own list, drawings first
13 documents on file for this application
Drawings (9)
- Proposed ground floor plans
- Proposed first and second floor plans
- Proposed elevations and roof plans
- Proposed elevations
- Location plan
- Existing ground floor plans
- Existing ground floor plan
- Existing elevations
- Existing roof plans
Everything on file (13)
- Application Form - Without Personal Data
- S01 Location Plan
- S02 Existing ground floor plans
- S03 Existing ground floor plan
- S05 Existing Elevations
- S04 Existing roof plans
- C01 Proposed ground floor plans
- C02 Proposed first and second floor plans
- C03 Proposed elevations and roof plans
- C04 Proposed elevations
- Design and access statement
- Decision notice
- Officers reports
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What happens while it is decided
This application is with Hillingdon for determination, against a statutory target of eight weeks. Over the last year Hillingdon's median decision took 58 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Hillingdon's portal will say. Our guide explains the common types.