Planning application
LAND AT RAINBOW INDUSTRIAL ESTATE TROUT ROAD YIEWSLEY UB7 7XT
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Demolition of existing structures and phased re-development of the site to provide nine plots ranging between three and 11 storeys in height (including ground level) to include residential uses (Use Class C3), flexible retail/cafe/restaurant floorspace (Class E (a,b,c)), light industrial floorspace (Class E (g)(iii)), associated hard and soft landscaping, car parking, cycling parking, servicing, refuse and plant areas, public realm improvements, highways works and other works associated with the development.
As published by the council, reference 38058/APP/2025/2613
Application record
- Reference
- 38058/APP/2025/2613
- Type
- Full
- Status
- Undecided
- Received
- 9 Oct 2025
- Validated
- 9 Oct 2025
- Ward
- YIEWSLEY 2022
- Postcode
- UB7 7XT
Site history
Applications at this address on the Hillingdon register
This site has had 2 applications since 2021: 0 approved, 1 refused.
-
38058/APP/2021/1327 Refused
LAND AT RAINBOW INDUSTRIAL ESTATE TROUT ROAD YIEWSLEY UB7 7XT
Installation of two portacabins and retention of entrance gates and proposed change of use for Use Class Sui Generis including container storage; open and closed storage of building and scaffolding materials; storage of aggregate materials; vehicle storage and sales for a period of 36 months (part retrospective application).
Timeline
Dates from the published record
-
9 Oct 2025
Received by Hillingdon
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 4 December 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hillingdon took a median of 58 days over the applications it decided in the last year.
Documents
The council's own list, drawings first
157 documents on file for this application
Drawings (100)
- Proposed pta-a-zz-dr-a pl1 building a general arrangement plans
- Proposed pta-b-zz-dr-a pl1 building b1 general arrangement plans plan
- Proposed pta-b-zz-dr-a pl1 block b1,b2,b3 general arrangement plan
- Proposed pta-b-zz-dr-a pl1 block b1,b2,b3 general arrangement plan
- Proposed pta-c-zz-dr-a pl1 building c general arrangement plans
- Proposed pta-d-zz-dr-a pl1 building d1 general arrangement plan
- Proposed pta-d-zz-dr-a pl1 building d1 general arrangement plans
- Proposed pta-d-zz-dr-a pl1 building d1 general arrangement plans
- Proposed pta-e-zz-dr-a pl1 building e general arrangement plans
- Proposed pta-f-zz-dr-a pl1 building f general arrangement plans
- Proposed pta-g-zz-dr-a pl1 building g general arrangement plans
- Proposed pta-h-zz-dr-a houses h2 and h3 general arrangement plans
- Proposed pta-j-zz-dr-a pl1 building j ground floor general arrangement plan
- Proposed pta-j-zz-dr-a pl1 building j level 1 general arrangement plan
- Proposed pta-j-zz-dr-a pl1 building j level 2 general arrangement plan
- Proposed pta-j-zz-dr-a pl1 building j roof general arrangement plan
- Proposed pta-a-zz-dr-a pl2 building a general arrangement plans
- Proposed pta-d-zz-dr-a pl2 block d1 general arrangement plan
- Proposed pta-e-zz-dr-a pl2 building e general arrangement plans roof and fps plans
- Proposed pta-g-zz-dr-a pl2 building g general arrangement plans fps and roof
- Proposed pta-b-zz-dr-a pl2 building b1 general arrangement plans ground floor and first…
- Proposed pta-b-zz-dr-a pl2 block b1,b2,b3 general arrangement plan second and third floo…
- Proposed pta-b-zz-dr-a pl2 block b1,b2,b3 general arrangement plan fourth and fifth floo…
- Proposed pta-b-zz-dr-a pl1 block b1,b2,b3 general arrangement plans sixth and seventh fl…
- Proposed pta-b-zz-dr-a pl1 block b1,b2,b3 general arrangement plans eight floor and roof…
- Proposed pta-j-zz-dr-a pl2 building j ground floor general arrangement plan
- Proposed pta-j-zz-dr-a pl2 building j level 1 general arrangement plan
- Proposed pta-j-zz-dr-a pl2 building j level 2 general arrangement plan
- Proposed pta-la dr-a ground floor landscape plan
- Proposed pta-la dr-a ground floor landscape plan
- Proposed pta-la dr-a ground floor landscape plan
- Proposed pta-la dr-a ground floor landscape plan
- Proposed pta-bd-zz-dr-a pl2 building b1 b3 and d3 east and west elevation plan
- Proposed pta-bd-zz-dr-a pl2 building b2 b3 and d3 east elevation plan
- Proposed pta-a-zz-dr-a pl1 building a elevations
- Proposed pta-bd-zz-dr-a pl1 building b1 b3 and d3 east and west elevations
- Proposed pta-bd-zz-dr-a buildings b2 and d2 west elevations
- Proposed pta-bd-zz-dr-a pl1 building b2 b3 and d3 east elevations
- Proposed pta-b-zz-dr-a pl1 building b1 north and south elevations
- Proposed pta-c-zz-dr-a pl1 building c elevations
- Proposed pta-d-zz-dr-a pl1 building d1 north and south elevations
- Proposed pta-e-zz-dr-a pl1 building e elevations
- Proposed pta-f-zz-dr-a pl1 building f elevations
- Proposed pta-g-zz-dr-a pl1 building g elevations
- Proposed pta-h-zz-dr-a houses h2 and h3 elevations
- Proposed pta-j-zz-dr-a general arrangement elevation building j north east and west elev…
- Pta-zz-zz-dr-a proposed site elevations
- Proposed pta-a-zz-dr-a pl2 building a elevations
- Proposed pta-bd-zz-dr-a pl2 building b1 b2 and d2 west elevation plan
- Proposed pta-b-zz-dr-a pl2 building b1 b2 and b3 north and south elevation plan
- Proposed pta-d-zz-dr-a pl2 building d1 d2 and d3 north and south elevations
- Proposed pta-e-zz-dr-a pl2 building e elevations
- Proposed pta-f-zz-dr-a pl2 building f elevations
- Proposed pta-g-zz-dr-a pl2 building g elevations
- Proposed pta-h-zz-dr-a houses h2 and h3 elevations
- Proposed pta-j-zz-dr-a pl2 building j elevations
- Pta-zz-zz-dr-a proposed site elevations
- Proposed pta-f-zz-dr-a pl2 building f general arrangement plans fps and roof plan
- Proposed pta-h-zz-dr-a houses h1,h2 and h3 general arrangement plans fps incl roof plans
- Proposed pta-j-zz-dr-a pl2 building j roof general arrangement plan
- Proposed pta-zz dr-a masterplan general arrangement plan roof plan
- Pta-zz-zz-dr-a proposed site block plan
- Pta-zz-zz-dr-a proposed block plan
- Pta-la dr-a proposed masterplan landscape plan
- Proposed pta-zz dr-a masterplan general arrangement plan
- Proposed pta-zz dr-a masterplan general arrangement plan
- Proposed pta-zz dr-a masterplan general arrangement plan level 02
- Proposed pta-zz dr-a masterplan general arrangement plan
- Proposed pta-zz dr-a masterplan general arrangement plan
- Proposed pta-zz dr-a masterplan general arrangement plan level 05
- Proposed pta-zz dr-a masterplan general arrangement plan
- Proposed pta-zz dr-a masterplan general arrangement plan level 07
- Proposed pta-zz dr-a masterplan general arrangement plan
- Proposed pta-zz dr-a masterplan general arrangement plan level 09
- Proposed pta-zz dr-a masterplan general arrangement plan
- Proposed pta-zz dr-a masterplan general arrangement plan level 11 roof
- Pta-la dr-a proposed masterplan landscape plan
- Proposed pta-zz dr-a masterplan general arrangement plan
- Proposed pta-zz dr-a masterplan general arrangement plan
- Proposed pta-zz dr-a masterplan general arrangement plan level 02
- Proposed pta-zz dr-a masterplan general arrangement plan level 03
- Proposed pta-zz dr-a masterplan general arrangement plan level 04
- Proposed pta-zz dr-a masterplan general arrangement plan level 05
- Proposed pta-zz dr-a masterplan general arrangement plan level 06
- Proposed pta-zz dr-a masterplan general arrangement plan level 07
- Proposed pta-zz dr-a masterplan general arrangement plan level 08
- Proposed pta-zz dr-a masterplan general arrangement plan level 09
- Proposed pta-zz dr-a masterplan general arrangement plan level 10
- Pta-la dr-a ground floor landscape plan
- Pta-la dr-a ground floor landscape plan
- Pta-la dr-a ground floor landscape plan
- Pta-la dr-a ground floor landscape plan
- Pta-c-zz-dr-a pl2 building c elevation plan
- Pta-c-zz-dr-a pl2 building c general arrangement plan
- Pta-d-zz-dr-a pl2 building d1 general arrangement plan
- Pta-d-zz-dr-a pl2 block d1 general arrangement plan
- Location plan amended
- Pta-zz dr-a existing site layout and demolition plan
- Pta-zz dr-a existing site layout and demolition plan
- Pta-zz dr-a existing site location plan
Everything on file (157)
- ApplicationFormRedacted Application Form - Without Personal Data
- Application Form Redacted
- 458-PTA-ZZ-00-DR-A-1000 Rev PL1 Existing site location plan
- Location plan amended
- 458-PTA-ZZ-ZZ-DR-A-3000 Rev PL1 Proposed site block plan
- 458-PTA-ZZ-ZZ-DR-A-3000 Rev PL2 Proposed Block plan
- 458-PTA-ZZ-00-DR-A-1001 Rev PL1 Existing site layout and demolition plan
- 458-PTA-LA-00-DR-A-2000 Rev PL2 Proposed masterplan landscape plan
- 458-PTA-LA-00-DR-A-2200 Rev PL2 Ground floor landscape plan 1 of 4
- 458-PTA-LA-00-DR-A-2201 Rev PL2 Ground floor landscape plan 2 of 4
- 458-PTA-LA-00-DR-A-2202 Rev PL2 Ground floor landscape plan 3 of 4
- 458-PTA-LA-00-DR-A-2203 Rev PL2 Ground floor landscape plan 4 of 4
- 10.092 Rev 2.0 Noise Assessment dated September 2024
- 458-PTA-A-ZZ-DR-A-1200 Rev PL1 Building A General Arrangement Plans
- 458-PTA-B-ZZ-DR-A-1200 Rev PL1 Building B1, B2, B3 General arrangement plans Plan 1 of 3
- 458-PTA-B-ZZ-DR-A-1201 Rev PL1 Block B1,B2,B3 General arrangement Plan 2 of 3
- 458-PTA-B-ZZ-DR-A-1202 Rev PL1 Block B1,B2,B3 General arrangement Plan 3 of 3
- 458-PTA-C-ZZ-DR-A-1200 Rev PL1 Building C General arrangement Plans
- 458-PTA-D-ZZ-DR-A-1200 Rev PL1 Building D1, D2, D3 General arrangement plan 1 of 3
- 458-PTA-D-ZZ-DR-A-1201 Rev PL1 Building D1, D2, D3 General arrangement plans 2 of 3
- 458-PTA-D-ZZ-DR-A-1202 Rev PL1 Building D1, D2, D3 General arrangement plans 3 of 3
- 458-PTA-E-ZZ-DR-A-1200 Rev PL1 Building E General arrangement plans
- 458-PTA-F-ZZ-DR-A-1200 Rev PL1 Building F General arrangement plans
- 458-PTA-G-ZZ-DR-A-1200 Rev PL1 Building G General arrangement plans
- 458-PTA-H-ZZ-DR-A-1200 Rev PL1 Houses H1, H2 and H3 General arrangement plans
- 458-PTA-J-ZZ-DR-A-1200 Rev PL1 Building J GF General arrangement plan 1of 4
- 458-PTA-J-ZZ-DR-A-1201 Rev PL1 Building J Level 1 General arrangement plan 2 of 4
- 458-PTA-J-ZZ-DR-A-1202 Rev PL1 Building J Level 2 General arrangement plan 3 of 4
- 458-PTA-J-ZZ-DR-A-1203 Rev PL1 Building J Roof General arrangement plan 4 of 4
- 458-PTA-ZZ-00-DR-A-1100 Rev PL2 Masterplan General arrangement plan - Level 00
- 458-PTA-ZZ-01-DR-A-1101 Rev PL2 Masterplan General arrangement plan - Level 01
- 458-PTA-ZZ-02-DR-A-1102 Rev PL2 Masterplan General arrangement plan Level 02
- 458-PTA-ZZ-03-DR-A-1103 Rev PL2 Masterplan General arrangement plan - Level 03
- 458-PTA-ZZ-04-DR-A-1104 Rev PL2 Masterplan General arrangement plan - Level 04
- 458-PTA-ZZ-05-DR-A-1105 Rev PL2 Masterplan General arrangement plan Level 05
- 458-PTA-ZZ-06-DR-A-1106 Rev PL2 Masterplan General arrangement plan - Level 06
- 458-PTA-ZZ-07-DR-A-1107 Rev PL2 Masterplan General arrangement plan Level 07
- 458-PTA-ZZ-08-DR-A-1108 Rev PL2 Masterplan General arrangement plan - Level 08
- 458-PTA-ZZ-09-DR-A-1109 Rev PL2 Masterplan General arrangement plan Level 09
- 458-PTA-ZZ-10-DR-A-1110 Rev PL2 Masterplan General arrangement plan - Level 10
- 458-PTA-ZZ-11-DR-A-1111 Rev PL2 Masterplan General arrangement plan Level 11 Roof
- 458-PTA-A-ZZ-DR-A-1200 Rev PL2 Building A General arrangement plans
- 458-PTA-BD-ZZ-DR-A-1300 Rev PL2 Building B1, D1, B3 and D3 East and West Elevation plan
- 458-PTA-BD-ZZ-DR-A-1302 Rev PL2 Building B2, D2, B3 and D3 East Elevation plan
- 458-PTA-D-ZZ-DR-A-1202 Rev PL2 Block D1, D2, D3 General arrangement plan
- 458-PTA-E-ZZ-DR-A-1200 Rev PL2 Building E General arrangement plans (Roof and FPs plans)
- 458-PTA-F-ZZ-DR-A-1200 Rev PL2 Building F General arrangement plans (FPs and Roof plan)
- 458-PTA-G-ZZ-DR-A-1200 Rev PL2 Building G General arrangement plans (FPs and Roof)
- 458-PTA-LA-00-DR-A-2000 Rev PL3 Proposed masterplan landscape plan
- 458-PTA-ZZ-00-DR-A-1100 Rev PL4 Masterplan General arrangement plan
- 458-PTA-ZZ-01-DR-A-1101 Rev PL4 Masterplan General arrangement plan
- 458-PTA-ZZ-02-DR-A-1102 Rev PL4 Masterplan General arrangement plan Level 02
- 458-PTA-ZZ-03-DR-A-1103 Rev PL4 Masterplan General arrangement plan Level 03
- 458-PTA-ZZ-04-DR-A-1104 Rev PL4 Masterplan General arrangement plan Level 04
- 458-PTA-ZZ-05-DR-A-1105 Rev PL4 Masterplan General arrangement plan Level 05
- 458-PTA-ZZ-06-DR-A-1106 Rev PL4 Masterplan General arrangement plan Level 06
- 458-PTA-ZZ-07-DR-A-1107 Rev PL4 Masterplan General arrangement plan Level 07
- 458-PTA-ZZ-08-DR-A-1108 Rev PL4 Masterplan General arrangement plan Level 08
- 458-PTA-ZZ-09-DR-A-1109 Rev PL4 Masterplan General arrangement plan Level 09
- 458-PTA-ZZ-10-DR-A-1110 Rev PL4 Masterplan General arrangement plan Level 10
- 458-PTA-B-ZZ-DR-A-1200 Rev PL2 Building B1, B2, B3 General arrangement plans, Ground Floor and First Floor plans
- 458-PTA-B-ZZ-DR-A-1201 Rev PL2 Block B1,B2,B3 General arrangement plan, Second and Third floor plan
- 458-PTA-B-ZZ-DR-A-1202 Rev PL2 Block B1,B2,B3 General arrangement plan, Fourth and Fifth floor plan
- 458-PTA-B-ZZ-DR-A-1203 Rev PL1 Block B1,B2,B3 General arrangement plans, Sixth and Seventh floor plan
- 458-PTA-B-ZZ-DR-A-1204 Rev PL1 Block B1,B2,B3 General arrangement plans, Eight Floor and Roof plan
- 458-PTA-H-ZZ-DR-A-1200 Rev PL1 Houses H1,H2, and H3, General arrangement plans (FPs incl Roof plans)
- 458-PTA-J-ZZ-DR-A-1200 Rev PL2 Building J Ground floor general arrangement plan
- 458-PTA-J-ZZ-DR-A-1201 Rev PL2 Building J Level 1 general arrangement plan
- 458-PTA-J-ZZ-DR-A-1202 Rev PL2 Building J Level 2 general arrangement plan
- 458-PTA-LA-00-DR-A-2200 Rev PL3 Ground floor landscape plan
- 458-PTA-LA-00-DR-A-2201 Rev PL3 Ground floor landscape plan
- 458-PTA-LA-00-DR-A-2202 Rev PL3 Ground floor landscape plan
- 458-PTA-LA-00-DR-A-2203 Rev PL3 Ground floor landscape plan
- 458-PTA-A-ZZ-DR-A-1300 Rev PL1 Building A Elevations
- 458-PTA-BD-ZZ-DR-A-1300 Rev PL1 Building B1, D1, B3 and D3 East and West Elevations
- 458-PTA-BD-ZZ-DR-A-1301 Rev PL1 Buildings B1, D1, B2 and D2 West Elevations
- 458-PTA-BD-ZZ-DR-A-1302 Rev PL1 Building B2, D2, B3 and D3 East Elevations
- 458-PTA-B-ZZ-DR-A-1300 Rev PL1 Building B1, B2, B3 North and South elevations
- 458-PTA-C-ZZ-DR-A-1300 Rev PL1 Building C Elevations
- 458-PTA-D-ZZ-DR-A-1300 Rev PL1 Building D1, D2, D3 North and South elevations
- 458-PTA-E-ZZ-DR-A-1300 Rev PL1 Building E Elevations
- 458-PTA-F-ZZ-DR-A-1300 Rev PL1 Building F Elevations
- 458-PTA-G-ZZ-DR-A-1300 Rev PL1 Building G Elevations
- 458-PTA-H-ZZ-DR-A-1300 Rev PL1 Houses H1, H2 and H3 Elevations
- 458-PTA-J-ZZ-DR-A-1300 Rev PL2 General Arrangement Elevation Building J North, East and West Elevations
- 458-PTA-ZZ-ZZ-DR-A-4000 Rev PL1 Proposed site elevations
- 458-PTA-A-ZZ-DR-A-1300 Rev PL2 Building A Elevations
- 458-PTA-BD-ZZ-DR-A-1301 Rev PL2 Building B1, D1, B2 and D2 West Elevation plan
- 458-PTA-B-ZZ-DR-A-1300 Rev PL2 Building B1, B2 and B3 North and South Elevation plan
- 458-PTA-D-ZZ-DR-A-1300 Rev PL2 Building D1, D2 and D3 North and South Elevations
- 458-PTA-E-ZZ-DR-A-1300 Rev PL2 Building E Elevations
- 458-PTA-F-ZZ-DR-A-1300 Rev PL2 Building F Elevations
- 458-PTA-G-ZZ-DR-A-1300 Rev PL2 Building G Elevations
- 458-PTA-H-ZZ-DR-A-1300 Rev PL1 Houses H1, H2 and H3 Elevations
- 458-PTA-J-ZZ-DR-A-1300 Rev PL2 Building J Elevations
- 458-PTA-ZZ-ZZ-DR-A-4000 Rev PL2 Proposed Site Elevations
- 458-PTA-J-ZZ-DR-A-1203 Rev PL2 Building J Roof General arrangement plan
- 458-PTA-ZZ-11-DR-A-1111 Rev PL4 Masterplan General arrangement plan roof plan
- Planning Statement dated October 2025
- 458-PTA-C-ZZ-DR-A-1200 Rev PL2 Building C General arrangement plan
- 458-PTA-C-ZZ-DR-A-1300 Rev PL2 Building C Elevation plan
- 458-PTA-D-ZZ-DR-A-1200 Rev PL2 Building D1, D2, D3 General arrangement plan
- 458-PTA-D-ZZ-DR-A-1201 Rev PL2 Block D1, D2, D3 General arrangement plan
- Design access statement (full doc) - superseded
- Design access statement (full doc) - superseded
- Design access statement (full doc) - superseded
- Design access statement (full doc) - superseded
- Design access statement (full doc) - superseded
- Design access statement (full doc) - superseded
- Design access statement (full doc) - superseded
- 458-PTA-ZZ-00-DR-A-1001 Rev PL2 Existing site layout and demolition plan
- 458-PTA-MP-ZZ-RP-A-0001_S4-PL1 Design and Access Statement dated September 2025 Rev PL1
- 458-PTA-MP-ZZ-RP-A-0001_S4-PL2 Design and Access Statement dated January 2026 Rev PL2
- Affordable Housing Statement dated October 2025
- 458-PTA-ZZ-ZZ-SH-A-0002 Rev PL1 Schedule of Accommodation
- 458 Rev P03 Schedule of planning drawings and reports
- KLG211/R1/Issue 1 Aviation Safeguarding Assessment dated October 2025
- Fire Statement Form
- 24-119 D012 Rev 1.0 Operational Waste Management Strategy dated September 2025
- Planning Fire Statement Revision 01
- Statement of Community Involvement
- 10.092 Version 02 Sustainability Statement dated September 2025
- 5029-TVIA Townscape Visual Impact Assessment dated October 2025
- 458-PTA-ZZ-ZZ-SH-A-0002 Rev PL3 Schedule of Accommodation dated 26th January 2026
- Schedule of planning drawings and reports dated 26th January 2026 Rev P05
- Schedule of planning drawings and reports dated 29th January 2026 Rev P06
- STATEMENT OF CONFORMITY
- Transmittal
- Advertisement notice
- Advertisement notice
- 10.092 Air Quality Assessment dated September 2025
- 21281 Daylight Sunlight and Overshadowing Report dated 9th September 2025
- 24/119 D002 Rev 2.0 Framework Travel Plan dated September 2025
- 240546-PD-10a Tree Schedule
- 240546-P-10 Rev A Tree Survey Plan
- 10.092 Ventilation and Extraction Statement dated September 2025
- 10.092 Version 02 Whole Life Cycle Carbon Assessment dated September 2025
- 21281 Wind Microclimate Assessment Report dated September 2025
- GLA Be Seen Specification
- GLA Carbon Emission Reporting Spreadsheet
- 240546-TMA-XX-RP-AP-2700-P00 Arboricultural Impact Assessment dated October 2025
- Archaeological Desk Based Assessment dated August 2025 issue 1
- 24/119 D003 Delivery and Servicing Management Plan dated September 2025 Version 2.0
- Trout Road, West Drayton Ecological Appraisal (including Biodiversity Net Gain) dated October 2025
- Energy Statement dated September 2025 Issue 02
- RMA-RC2789 Issue 2 Phase 1 Contamination Assessment Report dated 24th September 2025
- 24-119 D001 Rev 2.0 Transport Assessment dated September 2025 Version 2.0
- Utilities Statement dated September 2025 Revision P02
- Whole Life Carbon Assessment dated September 2025 Revision 02
- Be Seen Spreadsheet
- Carbon Emission Reporting Spreadsheet
- 24-101 Rev B Flood Risk Assessment and Drainage Strategy - September 2025
- Daylight and Sunlight Assessment Dated 8th January 2025
- Greater London Authority Stage 1 Decision Letter
- 24-101 Flood Risk Assessment and Drainage Strategy - Addendum 1 dated 26th March 2026
- Internal Daylight and Sunlight Report
- April 2026 Planning Committee Report
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What happens while it is decided
This application is with Hillingdon for determination, against a statutory target of eight weeks. Over the last year Hillingdon decided full applications in a median of 59 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
LAND AT RAINBOW INDUSTRIAL ESTATE TROUT ROAD YIEWSLEY UB7 7XT
Installation of two portacabins and retention of entrance gates and proposed change of use for Use Class Sui Generis including container storage; open and closed storage of building and scaffolding materials; storage of aggregate materials; vehicle storage and sales for a period of 36 months (part retrospective application).
Refused Full applications 25 docs -
PEPLOW CLOSE & PADCROFT ROAD YIEWSLEY UB7 7XN
To Crown reduce one Crack Willow by 3-4 metres. Shorten lateral branches by 2-3m over building. Crown lift 5m. Sever ivy. Remove epicormic and basal growth to crown break (within G1 on TPO 329)
Granted Trees 4 docs -
HEATHCOTE WAY PEDLOW CLOSE YIEWSLEY UB7 7XN
To carry out tree surgery including to Re-pollard Two Willow (T546 and T547 on application) within Group 4, To crown reduce to previous points One Chestnut T30 and One Lime (T549 on application) T33 all on TPO 329
Granted Trees 3 docs -
21 PEPLOW CLOSE YIEWSLEY UB7 7XN
Erection of a Single Storey Rear Extension (Application for a Certificate of Lawful Development for a Proposed Development)
Granted Full applications Extension 9 docsSmall domestic -
21 PEPLOW CLOSE YIEWSLEY UB7 7XN
Loft conversion involving construction of rear dormer and installation of 3 skylights on the front roof slope
Awaiting decision Loft or dormer -
115A HIGH STREET YIEWSLEY UB7 7QL
Installation of 1no. internally illuminated fascia sign and 1no. externally illuminated projecting sign to the front elevation
Granted Full applications 18 docs
Other full applications
In Hillingdon
-
78935/APP/2026/2430 Granted
82-84 HIGH STREET RUISLIP HA4 7AB
Non-material amendment to planning permission ref. 78935/APP/2025/2287, dated 16-01-26 (Creation of 5no. self-contained flats with associated cycle and bin storage, following the change of use of first floor from office (Class E) to residential (Class C3), the erection of a two storey rear extension and alterations to rear building at first floor level and the retention and reconfiguration of the Class E unit at ground floor level with alterations to fenestration.) to reconfigure the commercial unit at the ground floor and relocate the cycle storage.
-
77795/APP/2026/2256 Granted
29 CLAMMAS WAY COWLEY UB8 3AN
Details pursuant to the discharge of Condition 5 (Sustainable Urban Drainage) of planning permission ref. 77795/APP/2025/2979, dated 27-04-26 (Erection of 2x two storey, 3 bed dwelling with associated parking, amenity space, cycle and refuse stores, following the demolition of existing bungalow)
-
79552/APP/2026/2237 Refused
8 PAGET ROAD UXBRIDGE UB10 0SW
Change of use from Class C3 (residential dwelling) to Class C4 (HMO for up to 4 persons) and erection of a single storey rear extension.
-
69476/APP/2025/3204 Granted
5 BUSHEY ROAD ICKENHAM MIDDLESEX UB10 8JP
Variation of Condition 2 (Approved Plans) of planning permission ref. 69476/APP/2025/2003, dated 19-09-2025 (Erection of a single storey side and rear extension, following demolition of existing detached garage); Slope of ground (rear garden) will increase the height extension.
-
72670/APP/2026/2228 Granted
148 WINDSOR AVENUE UXBRIDGE UB10 9BD
Application under section 73A for development carried out including the erection of a outbuilding (Retrospective) (amended description)