Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0665/FUL

The Meads Highfield Way Potters Bar Hertfordshire EN6 1UL

Awaiting decision Hertsmere Full Planning Permission

Proposal

Demolition of existing side extension and garage to allow for the erection of a semi detached two storey dwelling following the subdivision of the site, with associated landscaping works.

As published by the council, reference 26/0665/FUL

Timeline

Dates from the published record

  1. 15 May 2026

    Received by Hertsmere

  2. 24 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Hertsmere for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/0527/HSE Granted

    13 Highfield Way Potters Bar Hertfordshire EN6 1UL

    Single storey rear extension.

    20 Apr 2026 89m away Householder
  • 23/0233/TPO Granted

    19 Highfield Way Potters Bar Hertfordshire EN6 1UN

    T1 WILLOW. Pollard back to previous regrowth pruning points of 4-6m. Current height 18m and spread 16m. Back limb was torn out in previous storm.

    13 Feb 2023 187m away Trees
  • 24/1210/HSE Granted

    66 Ladbrooke Drive Potters Bar Hertfordshire EN6 1QW

    Conversion of loft to habitable space including hip to gable roof alterations and front and rear dormer windows. Single storey rear extension, front porch extension and alterations to fenestration. (Revised application from 23/1771/HSE).

    20 Sep 2024 188m away Householder
  • 26/0683/HSE Granted

    17 Abingdon Place Potters Bar Hertfordshire EN6 1TF

    Part single, part two storey side and rear extensions, front porch, insertion of 2x rear roof lights and alterations to fenestration.

    19 May 2026 189m away Householder
  • 26/0996/CLE Awaiting decision

    8 Melrose Avenue Potters Bar Hertfordshire EN6 1SZ

    Existing use as a HMO (Class C4) Certificate of Lawful Development (Existing).

    20 Jul 2026 224m away Lawful development
  • 26/0766/FUL Granted

    10A The Walk Potters Bar Hertfordshire EN6 1QL

    Construction of outbuilding to rear garden for use as gym and office.

    4 Jun 2026 237m away Full applications

In Hertsmere

  • 26/0766/FUL Granted

    10A The Walk Potters Bar Hertfordshire EN6 1QL

    Construction of outbuilding to rear garden for use as gym and office.

    4 Jun 2026 Full applications
  • 26/0698/FUL Granted

    67 Cotton Road Potters Bar Hertfordshire EN6 5JJ

    Change of use from a 6 occupant HMO (use class C4) to a house of multiple occupancy for 7 occupants (HMO - Sui Generis), front boundary works to include dropped kerb, vehicular hardstanding and bin and bike storage.

    21 May 2026 Full applications
  • 26/0060/FUL Granted

    Nicoll Farm 34 Allum Lane Elstree Borehamwood Hertfordshire WD6 3NP

    Single storey rear extension to farmhouse and subdivision to create 1x3 bed and 1x 4 bed dwelling. Demolition of existing extensions to barn and conversion to 4x bed dwelling with alterations to fenestration. Erection of 2 4x bed semi detached dwellings. Erection of single storey 2x bed dwelling. Associated works and landscaping. (Associated LBC 26/0059/LBC).

    19 Jan 2026 Full applications
  • 25/0691/FUL Granted

    Bhaktivedanta Manor Dharam Marg Hilfield Lane Aldenham Watford Hertfordshire WD25 8EZ

    Part retrospective application for internal and external alterations to the existing stable block which include a glazed canopy, external flue and replacement of fenestration and external doors (Associated LBC application under reference 24/1078/LBC).

    6 May 2025 Full applications
  • 26/1008/FUL Awaiting decision

    31 Tempest Avenue Potters Bar Hertfordshire EN6 5JU

    Change of use from class C4 (6 Bed HMO) to sui generis (12 bedroom HMO) use facilitated by internal alterations, provision of waste and cycle storage, and installation of new dropped kerb.

    21 Jul 2026 Full applications