Redevelopment and clearance of site to deliver data centre campus consisting of (a) free standing data centre buildings (b) energy, power, and water infrastructure (c) site access and internal roads (d) site security arrangements (e) hard and soft, green and blue, landscaping and infrastructure (f) other ancillary and auxiliary forms of development.

As published by the council, reference 25/1781/FUL

Application record

Reference
25/1781/FUL
Type
Full Planning Permission
Status
Awaiting decision
Received
15 Dec 2025
Validated
19 Dec 2025
Ward
Bushey St James
Parish
No Parish

Timeline

Dates from the published record

  1. 15 Dec 2025

    Received by Hertsmere

  2. 19 Dec 2025

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 13 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hertsmere took a median of 58 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Savills Limited Agent, registered in London

Active · incorporated 1987 · London

2,107 applications on PlanIndex · across 183 councils · 93% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

170 documents on file for this application

  • Bng assessment Supporting Documents · 11 Sep 2026
  • Planning statement addendum Supporting Documents · 19 Aug 2026
  • Hmwt comment Consultee Comment · 19 Aug 2026
  • Amended ecological impact assessment Supporting Documents · 18 Aug 2026
  • Response to ecology comments Supporting Documents · 18 Aug 2026
  • Radlett society & green belt association comments Consultee replies · 18 Aug 2026
  • Letchmore heath village trust latest objection Consultee replies · 13 Aug 2026
  • Ea response Consultee replies · 10 Aug 2026
  • Ecology Consultee replies · 31 Jul 2026
  • Illustrative sketch landscape sections Amended Plan · 16 Jul 2026
  • Illustrative sketch landscape sections sheet 2 Amended Plan · 16 Jul 2026
  • Landscape masterplan Amended Plan · 16 Jul 2026
  • Urban greening factor Amended Plan · 16 Jul 2026
  • Proposed sw overall site plan Amended Plan · 16 Jul 2026
  • Proposed sw overall site plan - level 00 Amended Plan · 16 Jul 2026
  • Fence overall layout Amended Plan · 16 Jul 2026
  • Design and access statement Supporting Documents · 16 Jul 2026
  • Response note to ea Supporting Documents · 16 Jul 2026
  • Lead local flood authority response Consultee replies · 26 Jun 2026
  • Elstree aerodrome comments Consultee replies · 16 Jun 2026
  • Climate change & sustainability comments Consultee replies · 28 May 2026
  • Rsgba further response Consultee replies · 27 May 2026
  • A05 comment Consultee Comment · 05 May 2026
  • Pgra comment (objection) submitted online Consultee Comment · 20 Apr 2026
  • Elstree aerodrome response Consultee replies · 25 Mar 2026
  • Note for hcc highways - s.106 obligations Supporting Documents · 24 Mar 2026
  • Design development note - energy and sustainability Supporting Documents · 24 Mar 2026
  • Agent letter to gate herts Supporting Documents · 24 Mar 2026
  • Agent response to public comments Supporting Documents · 24 Mar 2026
  • Alternative sites assessment Supporting Documents · 19 Feb 2026
  • Data centre needs assessment and socio-economic impact assessment Supporting Documents · 19 Feb 2026
  • Consultee comment submitted online Consultee Comment · 05 Feb 2026
  • Gate herts comments Consultee replies · 03 Feb 2026
  • Place services landscape response Consultee replies · 02 Feb 2026
  • British horse society response Consultee replies · 02 Feb 2026
  • Gate comment (objection) submitted online Consultee Comment · 02 Feb 2026
  • Letchmore heath village trust comments Consultee Comment · 30 Jan 2026
  • The gardens trust response Consultee replies · 29 Jan 2026
  • Patchett's green residents' association comment (objection) submitted online Consultee Comment · 28 Jan 2026
  • Radlett society & green belt association comment Consultee replies · 22 Jan 2026
  • Climate change response Consultee replies · 16 Jan 2026
  • National highways response Consultee replies · 15 Jan 2026
  • Highways response Consultee replies · 15 Jan 2026
  • Affinity water response Consultee replies · 15 Jan 2026
  • Thames water response Consultee replies · 15 Jan 2026
  • Consultee comment submitted online Consultee Comment · 14 Jan 2026
  • Met office comment Consultee replies · 13 Jan 2026
  • Cadent gas updated response Consultee replies · 13 Jan 2026
  • Cadent gas specification for safe working Consultee replies · 13 Jan 2026
  • Arboriculture response Consultee replies · 13 Jan 2026
  • Environment agency response Consultee replies · 13 Jan 2026
  • Natural england response Consultee replies · 13 Jan 2026
  • Psecc response Consultee replies · 08 Jan 2026
  • Active travel england response Consultee replies · 08 Jan 2026
  • Arch response Consultee replies · 07 Jan 2026
  • Statement of community involvement Supporting Documents · 05 Jan 2026
  • Cadent gas holding objection Consultee replies · 31 Dec 2025
  • Cadent gas plan Consultee replies · 31 Dec 2025
  • Cadent gas response Consultee replies · 31 Dec 2025
  • Cadent gas specification for safe working Consultee replies · 31 Dec 2025
  • Uk power networks Consultee replies · 29 Dec 2025
  • Fire and rescue (hydrants) response Consultee replies · 29 Dec 2025
  • Planning statement Supporting Documents · 23 Dec 2025
  • Environmental statement cover and contents Supporting Documents · 23 Dec 2025
  • Environmental statement table of drawings Supporting Documents · 23 Dec 2025
  • Environmental statement table of professional competencies Supporting Documents · 23 Dec 2025
  • Environmental statement eia scoping request Supporting Documents · 23 Dec 2025
  • Environmental statement air quality appendices Supporting Documents · 23 Dec 2025
  • Environmental statement lvia methodology Supporting Documents · 23 Dec 2025
  • Environmental statement landscape masterplan Supporting Documents · 23 Dec 2025
  • Environmental statement introduction Supporting Documents · 23 Dec 2025
  • Environmental statement site and local context Supporting Documents · 23 Dec 2025
  • Environmental statement proposed development Supporting Documents · 23 Dec 2025
  • Environmental statement consultation, alternatives and design evolution Supporting Documents · 23 Dec 2025
  • Environmental statement approach to assessment Supporting Documents · 23 Dec 2025
  • Environmental statement air quality Supporting Documents · 23 Dec 2025
  • Environmental statement noise and vibration incl. appendices Supporting Documents · 23 Dec 2025
  • Environmental statement figures Supporting Documents · 23 Dec 2025
  • Environmental statement figures (low res) Supporting Documents · 23 Dec 2025
  • Environmental statement landscape and visual effects Supporting Documents · 23 Dec 2025
  • Environmental statement wirelines (low res) Supporting Documents · 23 Dec 2025
  • Environmental statement ztv methodology Supporting Documents · 23 Dec 2025
  • Environmental statement climate change Supporting Documents · 23 Dec 2025
  • Environmental statement summary of mitigation, residual and interaction effects Supporting Documents · 23 Dec 2025
  • Environmental statement non-technical summary Supporting Documents · 23 Dec 2025
  • Heritage statement Supporting Documents · 23 Dec 2025
  • Ztv plan extracted Supporting Documents · 23 Dec 2025
  • Applicationformredacted Application Form · 15 Dec 2025
  • Site location plan Drawing/Plans · 15 Dec 2025
  • Hp1 - ground floor plan Drawing/Plans · 15 Dec 2025
  • Heritage statement - hfp-bwe-xx-xx-rp-y-980008 p02 Supporting Documents · 15 Dec 2025
  • Arboricultural report hfp-bwe-xx-xx-rp-y-980010 p02 Supporting Documents · 15 Dec 2025
  • Archaeological assessment hfp-bwe-xx-xx-rp-y-980010 p03 Supporting Documents · 15 Dec 2025
  • Biodiversity net gain assessment hfp-bwe-xx-xx-rp-y-980006 p02 Supporting Documents · 15 Dec 2025
  • Biodiversity net gain metric Supporting Documents · 15 Dec 2025
  • Daylight & sunlight report hfp-bwe-xx-xx-rp-y-980004 p02 Supporting Documents · 15 Dec 2025
  • Design and access statement nwa-0576-hfp-xx-rp-a-000001 rev p01 11/12/2025 Supporting Documents · 15 Dec 2025
  • Ecological impact assessment hfp-bwe-xx-xx-rp-yf-980001 p03 Supporting Documents · 15 Dec 2025
  • Energy & sustainability statement hfp-bwe-xx-xx-rp-z-000001 p02 Supporting Documents · 15 Dec 2025
  • Fire strategy report hfp-bwe-xx-xx-rp-yf-980001 p03 Supporting Documents · 15 Dec 2025
  • Flood risk assessment and drainage strategy hfp-bwe-xx-xx-rp-y-98000 p02 Supporting Documents · 15 Dec 2025
  • Instrusive geoenvironmental and geotechnical site assessment hfp-bwe-xx-xx-rp-u- Supporting Documents · 15 Dec 2025
  • Desk based geoenvironmental and geotechnical site investigation hfp-bwe-xx-xx-rp Supporting Documents · 15 Dec 2025
  • Supplementary geoenvironmental investigation hfp-bwe-xx-xx-rp-u-980001 p02 Supporting Documents · 15 Dec 2025
  • Landscape management and maintenance plan 1679-009a dec 2025 Supporting Documents · 15 Dec 2025
  • Landscape masterplan Superseded plan · 15 Dec 2025
  • Illustrative sketch landscape sections sheet 2 Superseded plan · 15 Dec 2025
  • Illustrative sketch landscape sections Superseded plan · 15 Dec 2025
  • External lighting strategy hfp-bwe-xx-xx-rp-e-980001 p02 Supporting Documents · 15 Dec 2025
  • Transport assessment hfp-bwe-xx-xx-rp-y-980002 p02 Supporting Documents · 15 Dec 2025
  • Travel plan hfp-bwe-xx-xx-rp-y-980009 p02 Supporting Documents · 15 Dec 2025
  • Utilities statement hfp-bwe-xx-xx-rp-mep-980001 p02 Supporting Documents · 15 Dec 2025
  • Whole life-cycle assessment hfp-bwe-xx-xx-rp-z-000002 p02 Supporting Documents · 15 Dec 2025
  • Hp1 - facade bay study Drawing/Plans · 15 Dec 2025
  • Hp1- building sections Drawing/Plans · 15 Dec 2025
  • Hp1- building elevations Drawing/Plans · 15 Dec 2025
  • Hp1 - roof plan Drawing/Plans · 15 Dec 2025
  • Hp1 - roof gantry plan Drawing/Plans · 15 Dec 2025
  • Hp1- first to fourth floor plan Drawing/Plans · 15 Dec 2025
  • Hp1- ground floor plan Drawing/Plans · 15 Dec 2025
  • Hp2 - building sections Drawing/Plans · 15 Dec 2025
  • Hp2 - building elevations Drawing/Plans · 15 Dec 2025
  • Hp2 - roof plan Drawing/Plans · 15 Dec 2025
  • Hp2 - roof gantry plan Drawing/Plans · 15 Dec 2025
  • Hp2 - first to fourth floor plan Drawing/Plans · 15 Dec 2025
  • Hp2 - ground floor plan Drawing/Plans · 15 Dec 2025
  • Hp3 - building sections Drawing/Plans · 15 Dec 2025
  • Hp3 - building elevations Drawing/Plans · 15 Dec 2025
  • Hp3 -roof plan Drawing/Plans · 15 Dec 2025
  • Hp3 -roof gantry level Drawing/Plans · 15 Dec 2025
  • Hp3 - first to fourth floor plan Drawing/Plans · 15 Dec 2025
  • Hp3 - ground floor plan Drawing/Plans · 15 Dec 2025
  • Substation 1 - sections Drawing/Plans · 15 Dec 2025
  • Substation 1 - elevations Drawing/Plans · 15 Dec 2025
  • Substation 1 - floor plans Drawing/Plans · 15 Dec 2025
  • Substation 1 - site context plan - ground floor Drawing/Plans · 15 Dec 2025
  • Hp4 - ancillary facade bay study ? horizontal metal louvre system Drawing/Plans · 15 Dec 2025
  • Hp4 - ancillary facade bay study ? profiled perforated metal cladding Drawing/Plans · 15 Dec 2025
  • Hp4 - building sections Drawing/Plans · 15 Dec 2025
  • Hp4 - building elevations Drawing/Plans · 15 Dec 2025
  • Hp4 - roof plan Drawing/Plans · 15 Dec 2025
  • Hp4 - roof gantry plan Drawing/Plans · 15 Dec 2025
  • Hp4 - fourth floor plan Drawing/Plans · 15 Dec 2025
  • Hp4 - third floor plan Drawing/Plans · 15 Dec 2025
  • Hp4 - second floor plan Drawing/Plans · 15 Dec 2025
  • Hp4 - first floor plan Drawing/Plans · 15 Dec 2025
  • Hp4 - ground floor plan Drawing/Plans · 15 Dec 2025
  • Substation 2 - sections Drawing/Plans · 15 Dec 2025
  • Substation 2 - elevations Drawing/Plans · 15 Dec 2025
  • Substation 2 - floor plans Drawing/Plans · 15 Dec 2025
  • Substation 2 - site context plan - ground floor Drawing/Plans · 15 Dec 2025
  • Vrc ? facade bay study Drawing/Plans · 15 Dec 2025
  • Vrc ? plans, elevations and sections bulding Drawing/Plans · 15 Dec 2025
  • Site context sections Drawing/Plans · 15 Dec 2025
  • Visualisation 8 Drawing/Plans · 15 Dec 2025
  • Visualisation 7 Drawing/Plans · 15 Dec 2025
  • Visualisation 6 Drawing/Plans · 15 Dec 2025
  • Visualisation 5 Drawing/Plans · 15 Dec 2025
  • Visualisation 4 Drawing/Plans · 15 Dec 2025
  • Visualisation 3 Drawing/Plans · 15 Dec 2025
  • Visualisation 2 Drawing/Plans · 15 Dec 2025
  • Visualisation 1 Drawing/Plans · 15 Dec 2025
  • Sw waste mangement overall layout Drawing/Plans · 15 Dec 2025
  • Sw parking provision Drawing/Plans · 15 Dec 2025
  • Sw fence overall layout Superseded plan · 15 Dec 2025
  • Site elevations Drawing/Plans · 15 Dec 2025
  • Existing site location plan enlarged Drawing/Plans · 15 Dec 2025
  • Sw overall site plan - level 00 Superseded plan · 15 Dec 2025
  • Sw overall site plan Superseded plan · 15 Dec 2025
  • Site location plan Drawing/Plans · 15 Dec 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Hertsmere for determination, against a statutory target of eight weeks. Over the last year Hertsmere decided full applications in a median of 90 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • The Mecure Hotel And Land To South East Tylers Way Watford Hertfordshire WD25 8JH

    22/1117/OUT Submitted 24 Jun 2022 6m away

    Demolition and redevelopment to comprise B8 (Storage and Distribution) Use of up to 30,000 sqm gross external, including ancillary offices. In addition to the above the Development will include car parking; creation of servicing areas and provision of associated services, including waste, refuse, cycle storage, lighting and sub station; and for the laying out of the buildings; routes and open spaces within the development; and all associated works and operations including but not limited to: demolition; earthworks; provision of attenuation infrastructure, engineering operations. (Outline Application with Access, Appearance, Layout, Scale and Landscaping Matters Reserved).

    Granted Outline Demolition 107 docs
  • The Mercure Hotel And Land To South East Tylers Way Watford Hertfordshire WD25 8JH

    26/0911/PD28O Submitted 2 Jul 2026 158m away

    87% historically approved · decision due ~27 Aug

    Demolition of the existing buildings at the Former Mercure Hotel (Application for Prior Notification).

    Awaiting decision Demolition 20 docs
  • National Animal Welfare Trust Tylers Way Watford Hertfordshire WD25 8WT

    26/1119/VOC Submitted 7 Aug 2026 218m away

    89% historically approved · decision due ~2 Oct

    Variation of conditions 2 (plans - FUL), 4 (boundary treatment - FUL), 5 (drainage - FUL), 6 and 7 (surface water drainage - FUL), 10 (solar panels - FUL), 30 (BNG plan), 37 (Dust 1), 39 (Demolition & Construction Environmental Management Plan), 40 (Site waste Management Plan), 43 (Construction Management Plan), 46 (cycle parking), 47 (tree protection), 48 (Landscape Management Plan), 49 (boundary treatment), 50 (soft landscaping), 51 (hard landscaping), 53 (Whole Life Carbon Assessment) and removal of condition 38 (Dust 2) to allow for minor revisions to the development, and specifically a modestly revised building layout of the redeveloped NAWT site as approved following grant of planning permission 23/1731/FUL.

    Awaiting decision Amendments Demolition Trees 33 docs
  • National Animal Welfare Trust Tylers Way Watford Hertfordshire WD25 8WT

    21/0969/FUL Submitted 4 May 2021 238m away

    Demolition of existing kennel and miscellaneous ancillary buildings and construction of a new kennel building.

    Granted Full applications Demolition 19 docs
  • Telecommunications Equipment Within Carpark At Junction Of Sandy Lane And Little Bushey Lane Bushey Hertfordshire

    26/0169/PD56O Submitted 10 Feb 2026 327m away

    Installation of a 20m lattice tower, 6 no. antenna apertures, 4 no. 600mm transmission dishes, 4 no. equipment cabinets and development ancillary thereto inside a 13m x 7m compound enclosed by Cochrane Clearvu fencing with a double access gate.

    Granted Prior approval 20 docs

In Hertsmere

  • 26/0671/FUL Decided

    27A Harcourt Road Bushey Hertfordshire WD23 3PP

    Change of Use from C3 Dwelling to Children's residential home (C2).

    18 May 2026 Full applications
  • 26/0632/FUL Decided

    Earls Farm Earls Lane South Mimms Potters Bar Hertfordshire EN6 3LT

    Demolition of existing stables block & ancillary building and rebuild of replacement stables building.

    11 May 2026 Full applications
  • 26/1008/FUL Decided

    31 Tempest Avenue Potters Bar Hertfordshire EN6 5JU

    Change of use from class C4 (6 Bed HMO) to sui generis (11 bedroom HMO) use facilitated by internal alterations, provision of waste and cycle storage, and installation of new dropped kerb.

    21 Jul 2026 Full applications
  • 25/1648/FUL Decided

    30 Beech Avenue Radlett Hertfordshire WD7 7DE

    Demolition of existing dormer bungalow and construction of two storey detached house with accommodation at loft level, cycle and bin stores, front boundary works, and alterations to front and rear hard and soft landscaping.

    17 Nov 2025 Full applications
  • 26/0248/FUL Granted

    8 - 9 Station Close Potters Bar Hertfordshire EN6 1TL

    Change of use from existing warehouse (Use Class B8) to provision of medical or health services (Use Class E) and erection of cycle storage.

    25 Feb 2026 Full applications