Planning application
21/1094/FUL
11A Beaumont Gate Radlett Hertfordshire WD7 7AR
Proposal
Conversion of loft to create additional office space at 3rd floor level to include 2 rear dormers and 2 front roof lights.
As published by the council, reference 21/1094/FUL
Timeline
Dates from the published record
-
20 May 2021
Received by Hertsmere
-
27 May 2021
Validated
Checked as complete and ready for consideration.
-
19 Jul 2021
Decision issued: Grant Permission
-
24 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
26/0180/HSE Awaiting decision
15 Radlett Park Road Radlett Hertfordshire WD7 7BG
Part single part two storey side extension, single storey rear extension, conversion of loft to habitable space with alterations to fenestration and new external finishes.
-
26/1007/CLP Awaiting decision
15 Radlett Park Road Radlett Hertfordshire WD7 7BG
Erection of single storey outbuilding to rear garden. Certificate of Lawful Development (Proposed).
-
26/0172/FUL Granted
Midland House Beaumont Gate Shenley Hill Radlett Hertfordshire WD7 7AR
Erection of a 3 storey office building and associated parking and landscaping (as amended by plans/documents received on 27.05.2026 and 28.05.2026).
-
21/1263/TPO Granted
3 Broadlands Hillside Road Radlett Hertfordshire WD7 7BX
T5 OAK. Fell
-
TP/10/0042 Granted
11 Station Approach Radlett
Erection of infill wall beneath existing roof to create internal w.c. compartment.
-
26/0789/ADV Awaiting decision
70 Watling Street Radlett Hertfordshire WD7 7NP
Installation of 1x externally illuminated fascia sign, 1x projecting sign and 1 x window graphics. (Application for Advertisement Consent.)
Other full applications applications
In Hertsmere
-
26/0766/FUL Granted
10A The Walk Potters Bar Hertfordshire EN6 1QL
Construction of outbuilding to rear garden for use as gym and office.
-
26/0698/FUL Granted
67 Cotton Road Potters Bar Hertfordshire EN6 5JJ
Change of use from a 6 occupant HMO (use class C4) to a house of multiple occupancy for 7 occupants (HMO - Sui Generis), front boundary works to include dropped kerb, vehicular hardstanding and bin and bike storage.
-
26/0060/FUL Granted
Nicoll Farm 34 Allum Lane Elstree Borehamwood Hertfordshire WD6 3NP
Single storey rear extension to farmhouse and subdivision to create 1x3 bed and 1x 4 bed dwelling. Demolition of existing extensions to barn and conversion to 4x bed dwelling with alterations to fenestration. Erection of 2 4x bed semi detached dwellings. Erection of single storey 2x bed dwelling. Associated works and landscaping. (Associated LBC 26/0059/LBC).
-
25/0691/FUL Granted
Bhaktivedanta Manor Dharam Marg Hilfield Lane Aldenham Watford Hertfordshire WD25 8EZ
Part retrospective application for internal and external alterations to the existing stable block which include a glazed canopy, external flue and replacement of fenestration and external doors (Associated LBC application under reference 24/1078/LBC).
-
26/1008/FUL Awaiting decision
31 Tempest Avenue Potters Bar Hertfordshire EN6 5JU
Change of use from class C4 (6 Bed HMO) to sui generis (12 bedroom HMO) use facilitated by internal alterations, provision of waste and cycle storage, and installation of new dropped kerb.