Skip to content
PlanIndex Get alerts
Menu

Planning application

60 Mawney Road Romford RM7 7HT

Granted Havering Y0354.21 Outline

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension with an overall depth of 6m, a maximum height of 3.4m, and an eaves height of 2.75m. (PRIOR APPROVAL)

As published by the council, reference Y0354.21

Application record

Reference
Y0354.21
Type
Outline
Status
Pr App Not Req'd
Decision
Permitted
Received
13 Jul 2021
Validated
13 Jul 2021
Decided
12 Aug 2021
Ward
Brooklands
Postcode
RM7 7HT

Timeline

Dates from the published record

  1. 13 Jul 2021

    Received by Havering

  2. 12 Aug 2021

    Decision issued: Permitted

  3. 5 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 58 Mawney Road Romford RM7 7HT

    D0041.24 Submitted 29 Jan 2024 0m away

    Certificate of Lawfulness for a loft conversion with rear dormer and roof lights to front

    Granted Outline Loft or dormer 7 docs
  • 54 Mawney Road Romford RM7 7HT

    P0120.26 Submitted 30 Jan 2026 0m away

    Construction of a Loft Conversion with Rear Dormer

    Granted Full applications Loft or dormer 8 docs
  • Mawney Arms Public House Mawney Road Romford RM7 7HT

    T0098.26 Submitted 5 Aug 2026 0m away

    100% historically approved · decision due ~30 Sep

    To crown reduce by approximately 4m in height hand shape Maple trees ensuring that branches encroaching on neighbouring property are reduced and low hanging branches are crown lifted to 2.5m (G1)

    Decided Trees 2 docs
  • 56 MAWNEY ROAD ROMFORD RM7 7HT

    D0159.26 Submitted 16 Apr 2026 0m away

    Certificate of lawfulness for proposed conversion of loft to habitable use with rear dormer

    Granted Outline Loft or dormer 7 docs
  • 89 Mawney Road Romford RM7 7HX

    T0048.26 Submitted 31 Mar 2026 41m away

    Back Garden T001 - Oak Cut back from building to give 2 metre clearance. T1 is a large mature oak tree located in the boundary of 89 Mawney road, please see attached map. The works are part of a regular maintenance programme. The works will improve the overall aesthetics of the tree. The works are necessary to be carried out as the tree is touching the building with potential to cause damage. T002 - Oak Cut back from property to give 2 metre clearance. ALL ITEMS INCLUDING REMOVING ARISING DEBRIS, LEAVING SITE CLEAN AND TIDY. T2 is a large mature oak tree located in the boundary of 89 Mawney road, please see attached map. The works are part of a regular maintenance programme. The works will improve the overall aesthetics of the tree. The works are necessary to be carried out as the tree is touching the building with potential to cause damage.

    Granted Trees 4 docs
  • 73 Mawney Road Romford RM7 7HX

    P0251.23 Submitted 12 Feb 2023 41m away

    Single storey side and rear extension.

    Granted Full applications Extension 6 docs
    Small domestic

In Havering

  • D0267.26 Granted

    62 BYRON WAY ROMFORD RM3 7PS

    Certificate of Lawfulness for a proposed outbuilding for use as gym/office

    22 Jun 2026 Outline
  • D0283.26 Granted

    13 NORMAN CLOSE ROMFORD RM5 3EJ

    Certificate of lawfulness for proposed loft conversion with rear dormer

    3 Jul 2026 Outline
  • D0281.26 Granted

    46 The Mount Romford RM3 7LJ

    Certificate of lawfulness for a hip to gable loft conversion with rear dormer, roof lights to front and gable windows

    2 Jul 2026 Outline
  • Y0180.26 Granted

    11 Merlin Gardens Romford RM5 3YD

    Single storey rear extension with an overall depth of 6m, a maximum height of 3.50m, and an eaves height of 2.90m. (PRIOR APPROVAL)

    23 Jul 2026 Outline
  • D0275.26 Granted

    West View, Noak Hill Road Romford RM3 7LD

    Certificate of lawfulness for proposed hip to gable loft conversion with rear dormer, roof lights to front and gable window

    29 Jun 2026 Outline