Planning application
APP/26/00188
32, New Lane , Havant, PO9 2NG
Proposal
Site alterations comprising the installation of plant and associated works to facilitate Electric Vehicle charging infrastructure
As published by the council, reference APP/26/00188
Timeline
Dates from the published record
-
17 Mar 2026
Received by Havant
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Havant for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
APP/26/00299 Granted
105 Nutwick Road, Havant, PO9 2UQ
Regularisation of ground floor extension. Extension built 10 years ago in materials to match existing.
-
APP/22/01018 Granted
89 Nutwick Road, Havant, PO9 2UQ
T1 - Oak - Crown reduce by 2M Overall and crown raise to 15ft above ground level. Leaving a height of 7m by 6m width. Subject to TPO 0625.
-
APP/25/00797 Refused
77 Nutwick Road, Havant, PO9 2UQ
1No Oak (T1) Reduce height by up to 2.5m, leaving a finished height of approx. 15m. To reduce remainder of crown by up to 2m all round to leave a finished width of approx. 11m. Within TPO Group G2,Subject to TPO 1625.
-
APP/26/00050 Granted
1 Swallow Close, Havant, PO9 2RA
Fell 1No. Walnut tree subject to TPO 0758
-
APP/26/00225 Awaiting decision
36 New Lane, Havant, PO9 2JL
External alterations to the flexible use industrial building (permitted under application 22167/6) including partial reroofing, recladding, repainting, changes to fenestration. Removal of existing loading bay extension, provision of new loading bay doors, erection of new fence and gates within interior of site, rationalisation of parking layout and replacement of existing open sided entrance canopy.
-
APP/26/00396 Awaiting decision
19 Dunhurst Close, Havant, PO9 2LB
Enlargement and alteration of an existing detached outbuilding. Works comprised the removal of the original roof and front wall, extension of the structure, installation of timber-framed walls with external timber cladding and construction of a dual-pitched roof, to provide a single-storey domestic hobby workshop and storage building ancillary to the main dwelling.
Other full applications applications
In Havant
-
APP/26/00285 Granted
Unit 8A, Wellington Retail Park, 2 Hambledon Road, Waterlooville, PO7 7FG
Installation of new HVAC to Unit 8A with the incorporation of 3 No. stacked external condensing units located on the rear wall of the building.
-
APP/25/01006 Granted
6A Dornmere Lane, Waterlooville, PO7 8QH
Proposed rear garden room for child therapy use.
-
APP/25/00689 Refused
31 Serpentine Road, Widley, Waterlooville, PO7 5EE
Construction of a single storey rear extension and loft conversion, with rear dormer, in addition, construction of a single storey side extension to be used as a home office and for use as a dental practice for use by resident.
-
APP/26/00253 Granted
100 Bedhampton Road, Havant, PO9 3EZ
Single storey rear extension to dental practice.
-
APP/26/00227 Granted
Mark Anthony Court Estate , Hollow Lane, Hayling Island, PO11 0AE
The proposed development comprises the refurbishment of the roofs of all six apartment blocks within the site. The works include: Removal of existing roof coverings, Installation of a modern high-performance felt roofing system, Installation of upgraded thermal insulation, Raising of existing parapet walls by approximately 200mm.