Skip to content
PlanIndex Get alerts
Menu

Planning application

31 Shepherd Street, St Leonards-on-sea, TN38 0ET

Granted Hastings HS/FA/25/00672 Householder

Works: Windows or glazing Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed new second floor with rear balcony. Proposed roof terrace, with stairs enclosed at roof level with a low glass box and parapet wall over new second floor. Alterations and replacements to windows and doors. Juliet balconies to rear first floor. Raised rear terrace at ground floor level and render/paint building.

As published by the council, reference HS/FA/25/00672

Application record

Reference
HS/FA/25/00672
Type
Householder
Status
Decided
Decision
Granted As published: GRANTED PERMISSION
Received
11 Nov 2025
Validated
28 Nov 2025
Decided
25 Feb 2026
Ward
CENTRAL ST LEONARDS
Decision by
DELEGATED
Postcode
TN38 0ET

Timeline

Dates from the published record

  1. 11 Nov 2025

    Received by Hastings

  2. 28 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 25 Feb 2026

    Decision issued: GRANTED PERMISSION

  4. 25 Jul 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Westall Walker Associates Agent

11 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

The council's own list, drawings first

55 documents on file for this application

Drawings (38)

  • Proposed second floor 18 Feb 2026
  • Proposed first floor plan 12 Nov 2025
  • Proposed ground floor plan 12 Nov 2025
  • Proposed rear elevation 24 Feb 2026
  • Existing and proposed side elevations 18 Feb 2026
  • Proposed rear elevation 18 Feb 2026
  • Proposed front elevation 12 Nov 2025
  • Proposed block plan 18 Feb 2026
  • Proposed street view 12 Nov 2025
  • Proposed roof terrace plan 12 Nov 2025
  • Front elevation sash window detail 01 Dec 2025
  • Free standing skybox section e-e 01 Dec 2025
  • Free standing skybox section b-b 01 Dec 2025
  • Free standing skybox section c-c 01 Dec 2025
  • Free standing skybox section a-a 01 Dec 2025
  • Vertical 01 Dec 2025
  • Fc-o projection cill options 01 Dec 2025
  • Free standing skybox detail 01 Dec 2025
  • Free standing skybox detail c and detail d 01 Dec 2025
  • Free standing skybox detail b 01 Dec 2025
  • Free standing skybox detail a 01 Dec 2025
  • Free standing skybox general arrangement 01 Dec 2025
  • Pd-o-vertical scheme e 01 Dec 2025
  • Pd-o-vertical scheme c 01 Dec 2025
  • Free standing skybox detail e 01 Dec 2025
  • Pd-o-horizontal scheme el 01 Dec 2025
  • Jambs pd-o-horizontal scheme c 01 Dec 2025
  • Skybox details 01 Dec 2025
  • Free standing skybox detail 01 Dec 2025
  • Fc-o horizontal 01 Dec 2025
  • Location plan 12 Nov 2025
  • Existing ground floor plan 12 Nov 2025
  • Existing first floor plan 12 Nov 2025
  • Existing front elevation 12 Nov 2025
  • Existing rear elevation 12 Nov 2025
  • Existing roof plan 12 Nov 2025
  • Existing block plan 18 Feb 2026
  • Existing street view 12 Nov 2025

Everything on file (55)

  • FINAL DELEGATED REPORT Report · 25 Feb 2026
  • PROPOSED REAR ELEVATION Amended Plans · 24 Feb 2026
  • EXISTING BLOCK PLAN Amended Plans · 18 Feb 2026
  • EXISTING AND PROPOSED SIDE ELEVATIONS Amended Plans · 18 Feb 2026
  • PROPOSED SECOND FLOOR Amended Plans · 18 Feb 2026
  • PROPOSED REAR ELEVATION Amended Plans · 18 Feb 2026
  • PROPOSED BLOCK PLAN Amended Plans · 18 Feb 2026
  • COUNTY ARCHAEOLOGIST Consultee Comment · 16 Feb 2026
  • CONSERVATION OFFICER Consultee Comment · 08 Dec 2025
  • VERTICAL 2025. Drawing · 01 Dec 2025
  • FC-O-24 - PROJECTION CILL OPTIONS 2025. Drawing · 01 Dec 2025
  • FRONT ELEVATION SASH WINDOW DETAIL Drawing · 01 Dec 2025
  • FREE STANDING SKYBOX DETAIL Drawing · 01 Dec 2025
  • FREE STANDING SKYBOX DETAIL C AND DETAIL D Drawing · 01 Dec 2025
  • FREE STANDING SKYBOX DETAIL B Drawing · 01 Dec 2025
  • FREE STANDING SKYBOX DETAIL A. Drawing · 01 Dec 2025
  • FREE STANDING SKYBOX SECTION E-E. Drawing · 01 Dec 2025
  • FREE STANDING SKYBOX SECTION B-B. Drawing · 01 Dec 2025
  • FREE STANDING SKYBOX GENERAL ARRANGEMENT Drawing · 01 Dec 2025
  • PD-O-VERTICAL SCHEME E REV B. Drawing · 01 Dec 2025
  • PD-O-VERTICAL SCHEME C REV B Drawing · 01 Dec 2025
  • FREE STANDING SKYBOX DETAIL E. Drawing · 01 Dec 2025
  • PD-O-HORIZONTAL SCHEME EL REV B Drawing · 01 Dec 2025
  • JAMBS PD-O-HORIZONTAL SCHEME C REV B Drawing · 01 Dec 2025
  • SKYBOX DETAILS Other · 01 Dec 2025
  • FREE STANDING SKYBOX DETAIL Drawing · 01 Dec 2025
  • FREE STANDING SKYBOX SECTION C-C. Drawing · 01 Dec 2025
  • FREE STANDING SKYBOX SECTION A-A. Drawing · 01 Dec 2025
  • FC-O-24 - HORIZONTAL 2025 Drawing · 01 Dec 2025
  • EXISTING AND PROPOSED SIDE ELEVATIONS Superseded Drawing · 01 Dec 2025
  • SKYBOX OPERATION AND MAINTENANCE MANUAL Other · 01 Dec 2025
  • LOCATION PLAN Drawing · 12 Nov 2025
  • PROPOSED FRONT ELEVATION Drawing · 12 Nov 2025
  • PROPOSED REAR ELEVATION Superseded Drawing · 12 Nov 2025
  • APPENDIX D - DESIGN OF PROPOSAL Other · 12 Nov 2025
  • DESIGN AND ACCESS STATEMENT Other · 12 Nov 2025
  • HERITAGE STATEMENT Other · 12 Nov 2025
  • EXISTING STREET VIEW Drawing · 12 Nov 2025
  • PROPOSED STREET VIEW Drawing · 12 Nov 2025
  • WASTE MANAGEMENT Other · 12 Nov 2025
  • APPENDIX A - PLANNING POLICIES Other · 12 Nov 2025
  • APPENDIX B - ROOF BOX Other · 12 Nov 2025
  • APPENDIX C - IMPACT OF PROPOSALS ON HERITAGE ASSETS AND THEIR SETTING Other · 12 Nov 2025
  • PROPOSED FIRST FLOOR PLAN Drawing · 12 Nov 2025
  • PROPOSED SECOND FLOOR PLAN Superseded Drawing · 12 Nov 2025
  • PROPOSED ROOF TERRACE PLAN Drawing · 12 Nov 2025
  • EXISTING BLOCK PLAN Superseded Drawing · 12 Nov 2025
  • PROPOSED BLOCK PLAN Superseded Drawing · 12 Nov 2025
  • EXISTING ROOF PLAN Drawing · 12 Nov 2025
  • PROPOSED REAR ELEVATION Superseded Drawing · 12 Nov 2025
  • EXISTING FRONT ELEVATION Drawing · 12 Nov 2025
  • EXISTING REAR ELEVATION Drawing · 12 Nov 2025
  • EXISTING GROUND FLOOR PLAN Drawing · 12 Nov 2025
  • EXISTING FIRST FLOOR PLAN Drawing · 12 Nov 2025
  • PROPOSED GROUND FLOOR PLAN Drawing · 12 Nov 2025

Watch members (£5 a month) open the document list from here.

Open the documents

Working a patch? Trade sends you the drawings on every job in your area. 14 days free.

What this grant of permission means

Hastings granted permission on 25 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About householder applications

Householder applications cover work to an existing house and its garden, such as extensions, lofts and outbuildings, and cannot create a separate dwelling or change what the building is used for. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Hastings

  • HS/FA/26/00281 Granted

    Pine Crest, 82 Pine Avenue, Hastings, TN34 3PR

    Proposed replacement single story rear extension.

    Received 11 May, published by the council 25 Jul 2026 Householder
  • HS/FA/26/00437 Granted

    23 Farley Bank, Hastings, TN35 5QA

    Remove damaged gable end masonry above eaves, repair/replace internal timber frame, and finished with external white rainscreen cladding to the side elevation (retrospective)

    Received 17 Jul, published by the council 19 Aug 2026 Householder
  • HS/FA/26/00440 Granted

    85 Farley Bank, Hastings, TN35 5QA

    Remove damaged gable end masonry above eaves, repair/replace the internal timber frame, and finished with external white rainscreen cladding to the side elevation (retrospective)

    Received 17 Jul, published by the council 19 Aug 2026 Householder
  • HS/FA/26/00439 Granted

    65 Farley Bank, Hastings, TN35 5QA

    Remove the damaged gable end masonry above the eaves and repair/replace the internal timber frame, finished with external white rainscreen cladding to the side elevation.

    Received 17 Jul, published by the council 19 Aug 2026 Householder
  • HS/FA/26/00438 Granted

    45 Farley Bank, Hastings, TN35 5QA

    Remove damaged gable end masonry above eaves, repair/replace internal timber frame, and finished with external white rainscreen cladding to the side elevation.

    Received 17 Jul, published by the council 19 Aug 2026 Householder