Planning application

LAND AT WHELLEY HILL FARM WORSET LANE HARTLEPOOL TS27 3BH

Decided Hartlepool H/2021/0404 Environmental Impact Assessment scoping opinion

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Scoping opinion request in respect of electric vehicle charging facility (Solar Electric Forecourt), including erection of a 2-storey central hub; building to house ancillary facilities; and installation of an approx. 85ha solar farm and associated infrastructure.

As published by the council, reference H/2021/0404

Application record

Reference
H/2021/0404
Type
Environmental Impact Assessment scoping opinion
Decision
SCOP
Received
26 Aug 2021
Validated
2 Sep 2021
Postcode
TS27 3BH

Timeline

Dates from the published record

  1. 26 Aug 2021

    Received by Hartlepool

  2. 2 Sep 2021

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • WHELLY HILL FARM WORSET LANE HART HARTLEPOOL TS27 3BH

    D/2026/0026 Submitted 26 Jun 2026 0m away

    Discharge of conditions 5 PART A (Archaeology), 9 (Dust Suppression) and 19 (Ecological Enhancements) of planning permission H/2022/0459 Proposed Construction, Operation and Maintenance of a Battery Energy Storage System (BESS) Facility and Associated Infrastructure

    Granted Conditions 6 docs

In Hartlepool

  • H/2025/0264 Decided

    LAND ADJACENT TO THE SPORTS DOMES TEES ROAD HARTLEPOOL TS25 1DE

    Outline Planning application for consideration of site access, scale and landscaping for the erection of up to 60 holiday lodges, associated landscaping and vehicular parking

    1 Aug 2025 Outline
  • H/2022/0258 Granted

    THE HOUR GLASS PUBLIC HOUSE EAGLESFIELD ROAD HARTLEPOOL TS25 4BS

    Application for Permission In Principle for the erection of up to 5no. dwellings (demolition of existing public house).

    27 Jun 2022 Outline
  • H/2023/0041 Decided

    LAND ADJACENT TO HARTMOOR SUBSTATION HARTLEPOOL TS27 3BL

    EIA screening opinion in relation to proposed development by virtue of H/2022/0470 (for the installation and operation of a Grid Stability Facility consisting of Synchronous Compensators and associated Electrical Infrastructure, underground cabling, access tracks, drainage, temporary construction compounds, ancillary infrastructure and demolition of existing buildings).

    17 Feb 2023 Outline
  • H/2020/0215 Granted

    MAYFIELD HOUSE DALTON PIERCY ROAD DALTON PIERCY HARTLEPOOL TS27 3HY

    Outline application with all matters reserved for residential development comprising the erection of 5no. detached dwellings with associated detached garages and access, including demolition of existing dwelling, detached garage and stable block.

    23 Jun 2020 Outline
  • H/2019/0486 Decided

    THE WATERFRONT JACKSONS LANDING THE HIGHLIGHT HARTLEPOOL TS24 0XN

    Scoping opinion in respect of Phase 2 Waterfront infrastructure survey and studies

    14 Nov 2019 Outline