Planning application
LAND ADJACENT TO HARTMOOR SUBSTATION HARTLEPOOL TS27 3BL
Works: Demolition
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
EIA screening opinion in relation to proposed development by virtue of H/2022/0470 (for the installation and operation of a Grid Stability Facility consisting of Synchronous Compensators and associated Electrical Infrastructure, underground cabling, access tracks, drainage, temporary construction compounds, ancillary infrastructure and demolition of existing buildings).
As published by the council, reference H/2023/0041
Application record
- Reference
- H/2023/0041
- Type
- Environmental Impact Assessment Screening
- Status
- Permitted
- Decision
- EIANOTREQ
- Received
- 17 Feb 2023
- Validated
- 13 Feb 2023
- Decided
- 27 Mar 2023
- Postcode
- TS27 3BL
Timeline
Dates from the published record
-
13 Feb 2023
Validated
Checked as complete and ready for consideration.
-
17 Feb 2023
Received by Hartlepool
-
27 Mar 2023
Decision issued: EIANOTREQ
-
6 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
30 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
The process from here
The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.
If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
NATIONAL GRID SUBSTATION HARTMOOR WORSET LANE HARTLEPOOL TS27 3BL
Removal of hedgerow
Withdrawn Trees 5 docs
Other outline applications
In Hartlepool
-
H/2025/0264 Decided
LAND ADJACENT TO THE SPORTS DOMES TEES ROAD HARTLEPOOL TS25 1DE
Outline Planning application for consideration of site access, scale and landscaping for the erection of up to 60 holiday lodges, associated landscaping and vehicular parking
-
H/2022/0258 Granted
THE HOUR GLASS PUBLIC HOUSE EAGLESFIELD ROAD HARTLEPOOL TS25 4BS
Application for Permission In Principle for the erection of up to 5no. dwellings (demolition of existing public house).
-
H/2020/0215 Granted
MAYFIELD HOUSE DALTON PIERCY ROAD DALTON PIERCY HARTLEPOOL TS27 3HY
Outline application with all matters reserved for residential development comprising the erection of 5no. detached dwellings with associated detached garages and access, including demolition of existing dwelling, detached garage and stable block.
-
H/2021/0404 Decided
LAND AT WHELLEY HILL FARM WORSET LANE HARTLEPOOL TS27 3BH
Scoping opinion request in respect of electric vehicle charging facility (Solar Electric Forecourt), including erection of a 2-storey central hub; building to house ancillary facilities; and installation of an approx. 85ha solar farm and associated infrastructure.
-
H/2019/0486 Decided
THE WATERFRONT JACKSONS LANDING THE HIGHLIGHT HARTLEPOOL TS24 0XN
Scoping opinion in respect of Phase 2 Waterfront infrastructure survey and studies