Planning application

LAND ADJACENT TO HARTMOOR SUBSTATION HARTLEPOOL TS27 3BL

Decided Hartlepool H/2023/0041 Environmental Impact Assessment Screening

Works: Demolition

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

EIA screening opinion in relation to proposed development by virtue of H/2022/0470 (for the installation and operation of a Grid Stability Facility consisting of Synchronous Compensators and associated Electrical Infrastructure, underground cabling, access tracks, drainage, temporary construction compounds, ancillary infrastructure and demolition of existing buildings).

As published by the council, reference H/2023/0041

Application record

Reference
H/2023/0041
Type
Environmental Impact Assessment Screening
Status
Permitted
Decision
EIANOTREQ
Received
17 Feb 2023
Validated
13 Feb 2023
Decided
27 Mar 2023
Postcode
TS27 3BL

Timeline

Dates from the published record

  1. 13 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  2. 17 Feb 2023

    Received by Hartlepool

  3. 27 Mar 2023

    Decision issued: EIANOTREQ

  4. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

30 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

In Hartlepool

  • H/2025/0264 Decided

    LAND ADJACENT TO THE SPORTS DOMES TEES ROAD HARTLEPOOL TS25 1DE

    Outline Planning application for consideration of site access, scale and landscaping for the erection of up to 60 holiday lodges, associated landscaping and vehicular parking

    1 Aug 2025 Outline
  • H/2022/0258 Granted

    THE HOUR GLASS PUBLIC HOUSE EAGLESFIELD ROAD HARTLEPOOL TS25 4BS

    Application for Permission In Principle for the erection of up to 5no. dwellings (demolition of existing public house).

    27 Jun 2022 Outline
  • H/2020/0215 Granted

    MAYFIELD HOUSE DALTON PIERCY ROAD DALTON PIERCY HARTLEPOOL TS27 3HY

    Outline application with all matters reserved for residential development comprising the erection of 5no. detached dwellings with associated detached garages and access, including demolition of existing dwelling, detached garage and stable block.

    23 Jun 2020 Outline
  • H/2021/0404 Decided

    LAND AT WHELLEY HILL FARM WORSET LANE HARTLEPOOL TS27 3BH

    Scoping opinion request in respect of electric vehicle charging facility (Solar Electric Forecourt), including erection of a 2-storey central hub; building to house ancillary facilities; and installation of an approx. 85ha solar farm and associated infrastructure.

    26 Aug 2021 Outline
  • H/2019/0486 Decided

    THE WATERFRONT JACKSONS LANDING THE HIGHLIGHT HARTLEPOOL TS24 0XN

    Scoping opinion in respect of Phase 2 Waterfront infrastructure survey and studies

    14 Nov 2019 Outline