Planning application
MAYFIELD HOUSE DALTON PIERCY ROAD DALTON PIERCY HARTLEPOOL TS27 3HY
Works: New dwelling Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Outline application with all matters reserved for residential development comprising the erection of 5no. detached dwellings with associated detached garages and access, including demolition of existing dwelling, detached garage and stable block.
As published by the council, reference H/2020/0215
Application record
- Reference
- H/2020/0215
- Type
- Outline Application
- Status
- Permitted
- Decision
- OUTAPP (Approved)
- Received
- 23 Jun 2020
- Validated
- 24 Sep 2020
- Decided
- 3 Sep 2021
- Postcode
- TS27 3HY
Timeline
Dates from the published record
-
23 Jun 2020
Received by Hartlepool
-
24 Sep 2020
Validated
Checked as complete and ready for consideration.
-
3 Sep 2021
Decision issued: OUTAPP (Approved)
-
26 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
46 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Hartlepool granted permission on 3 September 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
ASHFIELD CARAVAN PARK ASHFIELD FARM DALTON PIERCY ROAD DALTON PIERCY HARTLEPOOL TS27 3HY
Discharge of conditions 4, 5, 6, 7, 8, 9, 10, 11, 12, 13 and 14 of planning permission H/2023/0280 Erection of a detached four bed dwelling in association with existing caravan park, to be restricted by an employment occupancy condition
Granted Conditions 14 docsDomestic -
HART ON THE HILL DALTON PIERCY ROAD DALTON PIERCY HARTLEPOOL TS27 3HY
Section 73a application to vary condition 2 of planning permission H/2019/0436 (Section 73 application for variation of condition 3 (approved plans) of planning permission H/2018/0243 (Section 73 application to amend design of dwellings approved under planning permission H/2017/0118 for the erection of two detached dwellings, formation of access and erection of fences and gates) to allow for relocation of site access and internal driveways and amendment to rear fenestration) to amend house type on plot 2
Decided Amendments Windows or glazing 38 docs
Other outline applications
In Hartlepool
-
H/2025/0264 Decided
LAND ADJACENT TO THE SPORTS DOMES TEES ROAD HARTLEPOOL TS25 1DE
Outline Planning application for consideration of site access, scale and landscaping for the erection of up to 60 holiday lodges, associated landscaping and vehicular parking
-
H/2022/0258 Granted
THE HOUR GLASS PUBLIC HOUSE EAGLESFIELD ROAD HARTLEPOOL TS25 4BS
Application for Permission In Principle for the erection of up to 5no. dwellings (demolition of existing public house).
-
H/2023/0041 Decided
LAND ADJACENT TO HARTMOOR SUBSTATION HARTLEPOOL TS27 3BL
EIA screening opinion in relation to proposed development by virtue of H/2022/0470 (for the installation and operation of a Grid Stability Facility consisting of Synchronous Compensators and associated Electrical Infrastructure, underground cabling, access tracks, drainage, temporary construction compounds, ancillary infrastructure and demolition of existing buildings).
-
H/2021/0404 Decided
LAND AT WHELLEY HILL FARM WORSET LANE HARTLEPOOL TS27 3BH
Scoping opinion request in respect of electric vehicle charging facility (Solar Electric Forecourt), including erection of a 2-storey central hub; building to house ancillary facilities; and installation of an approx. 85ha solar farm and associated infrastructure.
-
H/2019/0486 Decided
THE WATERFRONT JACKSONS LANDING THE HIGHLIGHT HARTLEPOOL TS24 0XN
Scoping opinion in respect of Phase 2 Waterfront infrastructure survey and studies