Planning application
The Cat Hook Road North Warnborough Hampshire RG29 1EU
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of one electric vehicle charging point on front of garage
As published by the council, reference 26/01556/LBC
Application record
- Reference
- 26/01556/LBC
- Category
- Heritage and listed buildings
- Status
- Registered
- Validated
- 15 Sep 2026
- Postcode
- RG29 1EU
Timeline
Dates from the published record
-
15 Sep 2026
Validated
Checked as complete and ready for consideration.
-
15 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 10 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hart took a median of 56 days over the applications it decided in the last year.
What happens while it is decided
This application is with Hart for determination, against a statutory target of eight weeks. Over the last year Hart decided heritage and listed building applications in a median of 94 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
The Cat Hook Road North Warnborough Hook Hampshire RG29 1EU
Install closed board timber fence on top of the existing brick boundary wall
Granted Heritage and listed buildings 14 docsSmall domestic -
Wycliffe House Hook Road North Warnborough Hook Hampshire RG29 1EU
B - Ash - Remove large horizontal bough C - Williow - Pollard two boughs D - Remove heavy horizontal bough
Granted Trees 3 docs -
7 Castle Bridge Cottages Hook Road North Warnborough Hook Hampshire RG29 1EU
1. Ash - Removal of lowest overhanging branch back to the boundary.
Granted Trees 6 docs -
The Bakery Hook Road North Warnborough Hook Hampshire RG29 1EU
T1 - Willow - Reduce over-extended branches, that have grown out the top of the canopy, by up to 5 m back to previous reduction points and lift tips to give 3m clearance. T2 - Ash - reduce branches over-hanging veg plot by 2m.
Granted Trees 4 docs -
Barley House Hook Road North Warnborough Hook Hampshire RG29 1EU
T1 - Walnut - Cut back branches by up to 1m from roof & building.
Granted Trees 4 docs -
Albion Farm Hook Road North Warnborough Hook Hampshire RG29 1EU
T1 - Ash - Pollard
Granted Trees 4 docs
Other heritage and listed building applications
In Hart
-
26/01387/LBC Awaiting decision
3 The Courtyard London Road Hartford Bridge Hartley Wintney Hook Hampshire RG27 8AE
Insertion of two rooflights following removal of dormer and two rooflights
-
26/01477/LBC Awaiting decision
Chesters The Street Eversley Hampshire RG27 0PJ
Works to facilitate the identification and treatment of dry rot fungus. Opening up works to identify extent of works required. Remedial works to the bathroom, windows and within the hall and landing.
-
26/01487/LBC Awaiting decision
Millfield Farmhouse Wellhouse Lane Bramshill Hook Hampshire RG27 0RJ
Repair and refurbishment of the timber-framed building, including repairs to the timber frame and sole plate; construction of new foundations and rebuilding of the brick plinth; installation of a new insulated limecrete floor, breathable insulation and replacement oak weatherboarding; re-covering of the roof with clay tiles; replacement timber windows and doors; installation of timber shutters; and lime-plastered internal wall and ceiling finishes.
-
26/00829/LBC Granted
The Holt Holt Lane Hook Hampshire RG27 9EP
Rebuild chimney stack after partial collapse, replacement roofing tile, new roof tile and timber rafter localised repairs.
-
26/01412/LBC Awaiting decision
Church Cottage Mattingley Green Mattingley Hampshire RG27 8LA
Replacement of the existing rear french doors