Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00428/FUL

Land On The West Side Of Reading Road Hook

Awaiting decision Hart Full Application

Proposal

Erection of 9No. residential dwellings with associated parking and vehicular access to the site

As published by the council, reference 26/00428/FUL

Timeline

Dates from the published record

  1. 16 Mar 2026

    Received by Hart

  2. 31 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Hart for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21/03214/FUL Refused

    Land Adjacent To Reading Road Hook Hampshire

    Erection of 20 affordable dwellings on an entry-level exception site with vehicular access from Reading Road alongside landscaping, public open space, internal roads, parking and associated drainage infrastructure

    21 Dec 2021 35m away Full applications
  • 25/01274/HOU Awaiting decision

    2 Orchard Cottage Reading Road Rotherwick Hook Hampshire RG27 9DB

    Creation of drainage field (retrospective)

    7 Jul 2025 103m away Householder
  • 26/00725/EIA Decided

    Land To The East Side Of Reading Road Hook

    Request for Screening Opinion (Town and Country Planning Environmental Impact Assessment) Regulations 2017 (as amended) to confirm if there is a requirement for an Environmental Impact Assessment (EIA) to accompany a planning application for a proposed residential development for up to 143 units, together with associated open space and infrastructure.

    30 Apr 2026 269m away Outline
  • 25/02522/LDC Granted

    20 Ashlea Hook Hampshire RG27 9RQ

    Part garage conversion (proposed)

    12 Dec 2025 401m away Lawful development

In Hart

  • 26/01241/FUL Awaiting decision

    Terranova Crane Sales Bowenhurst Lane Mill Lane Crondall Farnham GU10 5RP

    Erection of extension to maintenance shelter

    22 Jul 2026 Full applications
  • 26/01230/FUL Awaiting decision

    34 Reading Road South Fleet Hampshire GU52 7QL

    Change of use of from Class E to Class C3 (dwelling houses) to form 5 no. self contained flats in relation to 23/00913/GPDCOM (retrospective)

    21 Jul 2026 Full applications
  • 26/00735/FUL Granted

    Moor Place Farm Plough Lane Bramshill Hook Hampshire RG27 0RF

    Erection of an agricultural barn

    3 May 2026 Full applications
  • 25/00215/FUL Refused

    176 Fleet Road Fleet Hampshire GU51 4DE

    Erection of first floor front, side and rear extensions, change of use of part of ground floor and whole of first floor to residential and creation of a second floor to provide 9 flats (3 x 1 bed and 6 x 2 bed) and alterations to shopfront and fenestration

    3 Feb 2025 Full applications
  • 26/00856/FUL Granted

    1 Hill House West Crondall Road Fleet GU51 5SS

    Conversion of two flats into single dwelling, erection of single storey front/rear extension, installation of solar panels and external changes

    21 May 2026 Full applications