Skip to content
PlanIndex Get alerts
Menu

Planning application

25/02438/FUL

7 Elvetham Road Fleet Hampshire GU51 4QL

Awaiting decision Hart Full Application

Proposal

Demolition of the existing buildings (former care home) and erection of a single block of 12 flats with associated access, landscaping and parking (AMENDED PLANS)

As published by the council, reference 25/02438/FUL

Timeline

Dates from the published record

  1. 1 Dec 2025

    Received by Hart

  2. 6 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 26 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Hart for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00739/FUL Granted

    3 Elvetham Road Fleet GU51 4QL

    Erection of a detached building for use as staff room (retrospective)

    5 May 2026 47m away Full applications
  • 25/01773/TPO Granted

    Bramshott Place Fleet Road Fleet Hampshire GU51 4QF

    T1 Lime - Crown lift to 3 meters from ground level T2 Lime - Crown lift to 3 meters from ground level

    15 Sep 2025 88m away Trees
  • 26/00546/HOU Granted

    Sheepmoor View 13 Elvetham Road Fleet Hampshire GU51 4QL

    Erection of a single storey rear extension to dining room

    31 Mar 2026 98m away Householder
  • 26/00755/HOU Granted

    28 Knoll Road Fleet Hampshire GU51 4PU

    Erection of a garden gym room following removal of existing shed

    7 May 2026 163m away Householder
  • 25/02382/PDTEL Decided

    Land To The Front Of 1-10 Cranbrook Court Fleet

    install fixed line broadband electronic communications apparatus - 8 m Pole

    20 Nov 2025 191m away Telecoms
  • 20/01074/PREAPP Decided

    9 The Mount Fleet Hampshire GU51 4PX

    Extension over existing garage

    12 May 2020 205m away Outline

In Hart

  • 26/01241/FUL Awaiting decision

    Terranova Crane Sales Bowenhurst Lane Mill Lane Crondall Farnham GU10 5RP

    Erection of extension to maintenance shelter

    22 Jul 2026 Full applications
  • 26/01230/FUL Awaiting decision

    34 Reading Road South Fleet Hampshire GU52 7QL

    Change of use of from Class E to Class C3 (dwelling houses) to form 5 no. self contained flats in relation to 23/00913/GPDCOM (retrospective)

    21 Jul 2026 Full applications
  • 26/00735/FUL Granted

    Moor Place Farm Plough Lane Bramshill Hook Hampshire RG27 0RF

    Erection of an agricultural barn

    3 May 2026 Full applications
  • 25/00215/FUL Refused

    176 Fleet Road Fleet Hampshire GU51 4DE

    Erection of first floor front, side and rear extensions, change of use of part of ground floor and whole of first floor to residential and creation of a second floor to provide 9 flats (3 x 1 bed and 6 x 2 bed) and alterations to shopfront and fenestration

    3 Feb 2025 Full applications
  • 26/00856/FUL Granted

    1 Hill House West Crondall Road Fleet GU51 5SS

    Conversion of two flats into single dwelling, erection of single storey front/rear extension, installation of solar panels and external changes

    21 May 2026 Full applications