Proposal
Upgrade the existing High Voltage equipment within the Thames Basin Heath, Hazely Heath, Hook, Hampshire
As published by the council, reference 22/02388/OHL
Application record
- Reference
- 22/02388/OHL
- Type
- Overhead Electricity Lines
- Status
- Decided
- Decision
- Granted As published: No Objection
- Received
- 28 Sep 2022
- Validated
- 28 Sep 2022
- Decided
- 25 Oct 2022
- Ward
- Hartley Wintney
- Parish
- Mattingley
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
28 Sep 2022
Received by Hart
-
25 Oct 2022
Decision issued: No Objection
-
11 Oct 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Hart granted permission on 25 October 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Flittermouse Cottage Hazeley Lea Hartley Wintney Hook RG27 8ND
Demolition of single storey rear lean-to and erection of a single storey rear extension, creation of downstairs shower room, with new window to side elevation and relocation of kitchen, requiring the in-filling of two side windows
Granted Householder Extension Demolition +1 11 docsSmall domestic -
The Workshop Plough Lane Hazeley Lea Hook Hampshire RG27 8ND
85% historically approved · decision due ~18 Sep
Demolition of existing dwelling and erection of replacement dwelling with associated detached garage, bin and cycle store and landscaping
Awaiting decision Full applications Demolition 28 docsDomestic -
64 Hazeley Lea Hartley Wintney Hook RG27 8ND
Intention to install fixed line broadband electronic communications apparatus under Regulation 5 9m Wooden Pole
Decided Telecoms 4 docs -
Stags Barn Hazeley Lea Hartley Wintney Hook RG27 8ND
Replacement outbuilding and new lightweight glazed link to existing listed barn conversion with repositioned access into curtilage. Planning & heritage advice sought to include an on-site meeting and written response.
Decided Outline Windows or glazing 5 docs -
Kilbricken Hazeley Heath Hartley Wintney Hook RG27 8ND
Intention to install fixed line broadband electronic communications apparatus under Regulation 5 9m Wooden Pole
Decided Telecoms 4 docs -
The Bungalow Hazeley Heath Hartley Wintney Hook RG27 8NA
Erection of a single storey rear extension.
Granted Householder Extension 7 docsSmall domestic
Other less common application types
In Hart
-
26/00853/OHL Decided
Birchayes Branksomewood Road Fleet
Install a new section of Underground Electricity Cable.
-
26/00744/OHL Decided
Land Adjacent Nevills Hook Road North Warnborough
Install a Ground Mounted Electricity Substation.
-
26/01070/HCC Awaiting decision
Eversley Recycling The Welsh Drive Eversley Hook RG27 0QB
Phased extraction of approximately 263,000 net tonnes of sand and gravel and 2,553,000 net tonnes of fine/soft sand within two sites in Warren Heath, Eversley, Hampshire over an estimated period of 16-19 years and subsequent restoration using in situ material and inert materials and soil forming materials arising from Collard Group Limited wider operations at Eversley Recycling, The Welsh Drive, Eversley Hook Hampshire RG27 0QB
-
25/02123/HCC Decided
Cemex Fox Lane Eversley Cross RG27 0NQ
Planning application to vary conditions 1, 2 and 22 of planning permission 19/02866/HCC dated 5 April 2023 to extend the duration of the permission for the completion at Land at Chandlers Farm, Fox Lane, Eversley Cross Hook Hampshire RG27 0NQ
-
26/00188/OHL Decided
Terminal Building Blackbushe Airport London Road Blackwater Camberley GU17 9LQ
Proposed Sub Station installation.