Planning application
Mark Hall And Netteswell Community Association Moot House The Stow Harlow Essex CM20 3AG
Works: Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Renovation and restoration remedial works to 9 no. existing windows at ground and first floor levels at Moot House
As published by the council, reference HW/LBC/26/00351
Application record
- Reference
- HW/LBC/26/00351
- Status
- Unknown
- Received
- 31 Aug 2026
- Validated
- 28 Sep 2026
- Ward
- Mark Hall South
- Postcode
- CM20 3AG
Timeline
Dates from the published record
-
31 Aug 2026
Received by Harlow
-
28 Sep 2026
Validated
Checked as complete and ready for consideration.
-
1 Oct 2026
Added to PlanIndex
-
1 Oct 2026
Status changed to Unknown
-
Decision
Awaiting decision
Decision expected by 23 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Harlow took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Harlow for determination, against a statutory target of eight weeks. Over the last year Harlow's median decision took 55 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Harlow's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
10 - 11 The Stow Harlow Essex CM20 3AH
91% historically approved · decision due ~7 Dec
Installation of acrylic fascia boards, with green background and white and beige lettering and symbols
Awaiting decision -
15 The Stow Harlow Essex CM20 3AH
91% historically approved · decision due ~26 Oct
Retention of an installed ATM through the shop front left hand window. Part of the glazing has been replaced with a new white laminate security infill panel incorporating the ATM. A new matching vertical glazing mullion and shutter guide has been installed. The existing security roller shutter has been modified to allow constant use of the ATM. 2050 ATM fascia with illuminated black and green polycarbonate surround signage with white lettering "free cash withdrawals and balance enquiries" and "cash zone" Illuminated lettering and halo illumination to the polycarbonate surround signage. ATM green acrylic fascia sign with illuminated white lettering and accepted card logos.
Status unknown Advertising Extension Windows or glazing 7 docs -
10 - 11 The Stow Harlow Essex CM20 3AH
91% historically approved · decision due ~7 Dec
Shopfront alteration
Awaiting decision Windows or glazing -
Dental Practice Nuffield House Health Centre The Stow Harlow Essex CM20 3AX
91% historically approved · decision due ~22 Sep
Demolition of existing dental practice building and erection of fence
Awaiting decision Demolition 11 docsSmall domestic -
Service Industry Bays The Stow Harlow Essex
Application for approval of details reserved by condition 5 (Arboricultural Method Statement) of planning permission HW/FUL/22/00226 for the Re-development of former service industry bays into a mixed-use development comprising of 116 no. 1, 2 and 3 bedroom apartments and 482sqm of E(g) commercial use with undercroft car parking, mews courtyard, landscaped podium and residential gardens.
Granted Conditions New dwelling 4 docs -
The Service Bays The Stow Harlow Essex
91% historically approved · decision due ~3 Jul
Application for variation of condition 18 (Use of commercial space) of planning permission HW/REMVAR/25/00049 for variation of condition 27 (Approved Plans) of planning permission HW/FUL/22/00226 for the Re-development of former service industry bays into a mixed-use development.
Awaiting decision Amendments 6 docs