Planning application
Norwood House Temple Bank Harlow Essex CM20 2DY
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of a biomass boiler, filters, storage silo, chipper and associated duct work to provide space heating to the premises.
As published by the council, reference HW/FUL/21/00322
Application record
- Reference
- HW/FUL/21/00322
- Type
- Full Application
- Status
- Permitted
- Decision
- Granted Planning Permission
- Received
- 4 Jun 2021
- Validated
- 4 Jun 2021
- Decided
- 30 Jul 2021
- Ward
- Mark Hall
- Decision by
- Delegated Decision
- Postcode
- CM20 2DY
Timeline
Dates from the published record
-
4 Jun 2021
Received by Harlow
-
30 Jul 2021
Decision issued: Granted Planning Permission
-
25 Jul 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a design practice registered in Harlow
4 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Temple House River Way Harlow Essex CM20 2EY
88% historically approved · decision due ~25 Sep
Outline application for the demolition of existing buildings and construction of up to 19,000sqm of B2 / B8 employment floorspace with ancillary office use together with associated public open space, landscaping, parking, access, and associated works.
Awaiting decision Demolition -
Advertisement Board At River Way Roundabout River Way Harlow Essex CM20 2SN
Erection of 2 no. sponsorship signs to be placed on the River Way Roundabout
Granted Advertising 9 docs -
Roman House Temple Bank Harlow Essex CM20 2DY
Raising the roofs of two warehouse units, new shutter door and elevational alterations
Granted Full applications 10 docs -
Warehouse 1 River Way Harlow Essex CM20 2ES
Extension to existing vehicle access
Granted Full applications Extension 8 docs -
2 Sarbir Industrial Park Cambridge Road Harlow Essex CM20 2EU
Alteration to the existing roof to include a proposed front and rear dormer, with internal remodelling, and new entrance door to the front elevation.
Granted Full applications Loft or dormer 9 docs -
Harlow Mill Aggregate Depot Harlow Asphalt Ltd Station Approach Harlow Mill Harlow Essex CM20 2EL
88% historically approved · decision due ~28 Jul
Planning regularisation of elements of the applicants existing asphalt plant at their site in Harlow
Awaiting decision
Other full applications applications
In Harlow
-
HW/FUL/25/00504 Granted
Proposed Development South East Of Princess Alexandra Hospital Fourth Avenue Harlow Essex
Redevelopment of the site to provide mixed use development across 2 buildings, comprising purpose-built key worker accommodation (Sui Generis), residential units (Class C3) and commercial floorspace (Class E) at ground floor level, soft and hard landscaping, pedestrian and vehicular access, cycle parking and all other works associated with the development.
-
HW/FUL/26/00033 Granted
Adams House East Gate Harlow Essex
Refurbishment of the Adams House facades including replacement shopfronts (including signage), windows, the clock, changes to facing materials, and associated works
-
HW/FUL/26/00048 Granted
Burnt Mill Snooker And Social Club Edinburgh Way Harlow Essex CM20 2DQ
Removal of 16 no. car parking spaces and the creation of 12 no. EV car parking / larger vehicle spaces including charge points, fenced enclosure housing substation, with associated equipment, and external lighting (amended description)
-
HW/FUL/26/00205 Granted
Unit D Car Park Icon Harlow Third Avenue Harlow Essex CM19 5AW
Installation of plant and associated works to facilitate Electric Vehicle charging infrastructure
-
HW/FUL/26/00200 Granted
Gold Workshop 9 The Water Gardens South Gate Harlow Essex CM20 1AB
Installation of 2 no. traditional Victorian retractable awnings