Planning application
2 Sarbir Industrial Park Cambridge Road Harlow Essex CM20 2EU
Works: Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alteration to the existing roof to include a proposed front and rear dormer, with internal remodelling, and new entrance door to the front elevation.
As published by the council, reference HW/FUL/24/00281
Application record
- Reference
- HW/FUL/24/00281
- Type
- Full Application
- Status
- Pending Decision
- Decision
- Granted As published: Granted Planning Permission
- Received
- 19 Jul 2024
- Validated
- 19 Jul 2024
- Decided
- 13 Sep 2024
- Ward
- Mark Hall North
- Decision by
- Delegated Decision
- Postcode
- CM20 2EU
Timeline
Dates from the published record
-
19 Jul 2024
Received by Harlow
-
13 Sep 2024
Decision issued: Granted Planning Permission
-
9 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Robert Blake Designs Ltd Agent, a design practice
38 applications on PlanIndex · across 4 councils · 92% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Harlow granted permission on 13 September 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Harlow Mill Aggregate Depot Harlow Asphalt Ltd Station Approach Harlow Mill Harlow Essex CM20 2EL
91% historically approved · decision due ~28 Jul
Planning regularisation of elements of the applicants existing asphalt plant at their site in Harlow
Awaiting decision -
1 Hart Road Harlow Essex CM17 0HL
Change of Use from Use Class C3 (Dwellinghouse) to Use Class C2 11 bedroom and 2 Annex 13 person (Care Home)
Refused Full applications 20 docsDomestic -
12 Hart Road Harlow Essex CM17 0HL
Single storey rear extension, new door and window installed to the existing side elevation
Granted Householder Extension Windows or glazing 8 docsSmall domestic -
15 Hart Road Harlow Essex CM17 0HL
Loft conversion with rear dormer and front facing roof lights
Granted Lawful development Loft or dormer 7 docs -
58 The Hoo Harlow Essex CM17 0HR
Proposed works on new kitchen extension
Granted Householder Extension 7 docsDomestic -
Roman House Temple Bank Harlow Essex CM20 2DY
Raising the roofs of two warehouse units, new shutter door and elevational alterations
Granted Full applications 10 docs
Other full applications
In Harlow
-
HW/FUL/26/00357 Status unknown
Harlowbury Primary School Watlington Road Harlow Essex CM17 0DX
Demolition of existing buildings and redevelopment to provide 10 dwellings, incorporating parking, landscaping, and associated infrastructure
-
HW/FUL/26/00342 Status unknown
1 Burnt Mill Harlow Essex CM20 2UP
Installation of new aluminium automatic single sliding door with new shopfront glazing and frames
-
HW/FUL/26/00337 Status unknown
Green Hills Common Room Green Hills Harlow Essex CM20 3SZ
Change the use of the existing building & conversion into a temporary housing unit
-
HW/FUL/25/00343 Granted
Cavendish House Parkway Harlow Essex CM19 5QF
Construction of a double storey side and rear extension to the existing building
-
HW/FUL/26/00121 Granted
Staple Tye Petrol Service Station Southern Way Harlow Essex CM18 7NN
Removal of existing car wash and relocation of existing EV Charger. Installation of 2 additional EV Chargers with associated bollards and lighting. Formation of 6 new EV bays, including 1 EV accessible bay. Removal of existing LV Feeder Pillar and installation of new LV Feeder Pillar with timber enclosure. Relocation of Air & Vac equipment.