Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat B, 19 Barnard Hill, Hornsey, London, N10 2HB

Awaiting decision Haringey HGY/2026/2369 Full planning permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of Outbuilding in Rear Garden of Property

As published by the council, reference HGY/2026/2369

Application record

Reference
HGY/2026/2369
Type
Full planning permission
Status
Under Consultation
Received
27 Aug 2026
Validated
27 Aug 2026
Ward
Fortis Green
Decision by
Delegated Decision
Postcode
N10 2HB

Timeline

Dates from the published record

  1. 27 Aug 2026

    Received by Haringey

  2. 31 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 22 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Haringey took a median of 53 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Haringey for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 34 Barnard Hill, Hornsey, London, N10 2HB

    HGY/2026/0717 Submitted 13 Mar 2026 0m away

    Formation of rear dormer and outrigger roof extensions, installation of three rooflights to the front roof slope and replacement of all existing windows

    Granted Householder Extension Loft or dormer +1 18 docs
    Domestic
  • 36 Barnard Hill, Hornsey, London, N10 2HB

    HGY/2024/3065 Submitted 7 Nov 2024 0m away

    T1, T2, T3, T6, T9, T10, T11, T12, T18 and T20 See survey attached for details

    Granted Trees 3 docs
  • 113 Muswell Avenue, Hornsey, London, N10 2EJ

    HGY/2025/2627 Submitted 29 Sep 2025 71m away

    Erection of ground floor single storey front extension with flat green roof and 1no. rooflight behind parapet wall. (AMENDED DESCRIPTION)

    Granted Householder Extension Loft or dormer 17 docs
    Small domestic
  • 128, Colney Hatch Lane, London, N10 1ER

    HGY/2021/1978 Submitted 23 Jun 2021 90m away

    Single storey rear extension.

    Granted Full applications Extension 15 docs
    Small domestic
  • Ground Floor Flat, 137 Muswell Avenue, Hornsey, London, N10 2EN

    HGY/2026/1315 Submitted 8 May 2026 96m away

    Street tree: maple (T1) - prune back to boundary line of 137 Muswell Avenue, up to 2m off. Reason: to allow more light into building and front garden.

    Granted Trees 5 docs
  • Flat B, 125 Muswell Avenue, Hornsey, London, N10 2EN

    HGY/2026/1523 Submitted 1 Jun 2026 96m away

    T1–Portuguese Laurel tree - Crown reduction of approximately 1.5m on all aspects of tree.

    Granted Trees 4 docs

In Haringey

  • HGY/2026/1488 Granted

    203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ

    Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch

    10 Jul 2026 Full applications
  • HGY/2026/2208 Awaiting decision

    21 The Grove Lynton Road, Hornsey, London, N8 8ST

    Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.

    4 Sep 2026 Full applications
  • HGY/2026/2340 Awaiting decision

    Rowan, Muswell Road, Hornsey, London, N10 2BX

    The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.

    4 Sep 2026 Full applications
  • HGY/2026/2284 Awaiting decision

    10 & 12 Gladesmore Road, London, N15 6TB

    Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.

    3 Sep 2026 Full applications
  • HGY/2026/2062 Awaiting decision

    165 Priory Road, Hornsey, London, N8 8NB

    Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.

    2 Sep 2026 Full applications