Planning application
HGY/2026/1721
Restaurant, 2 Highgate High Street, Hornsey, London, N6 5JL
Proposal
installation of seven new external air conditioning condenser units on the flat roof of the commercial premises
As published by the council, reference HGY/2026/1721
Timeline
Dates from the published record
-
17 Jun 2026
Received by Haringey
-
24 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Haringey for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
HGY/2026/1790 Awaiting decision
Restaurant, 2 Highgate High Street, Hornsey, London, N6 5JL
Installation of ground floor shopfront signage, comprising a new fascia sign and a new projecting sign.
-
HGY/2026/1135 Granted
The Studio, Dukes Head Yard, Hornsey, London, N6 5JQ
Rear of The Studio: T1 & T2: 2 x Mature Apple's: Approximately 5.00m-6.00m: Reduce back to previous and recent points of reduction whilst preserving approximately 30% of shortened furnishing growth approximately 0.50m to ensure crown continuity and preserve a natural crown line. Remove major dead wood throughout the crowns. General maintenance. T3: Mature Yew Tree: Approximately 8.00m: Reduce crown height by approximately 1.20m-1.50m as is practicable whilst preserving adequate foliage cover and therefore perceived density. Reduce lateral and sub lateral branches overhanging the garden by up to approximately 0.50m. To help control encroachment. H1: Yew Hedge: Approximately 2.50m: Reduce height by approximately 0.40m as is practicable whilst preserving adequate outer branch structure. Trim lateral growth to tidy. General maintenance. T4: Fig: Approximately 4.00m-5.00m: Remove stems growing away from the wall, preserve the main espaliered stems as main framework. Remove minor growth by reducing back to previous points of reduction, preserve 30% of furnishing growth which should be shortened to approximately 20cm-30cm. Remove dead wood. T5: Large Shrub Feijoa: Approximately 5.00m: Reduce crown by up to approximately 1.30m. General maintenance. T6: Bay: Approximately 1.50m: Fell to ground level. Growing within very close proximity to the building. Replacement tree will be re planted further away from the building
-
2021/3234/P Granted
Channing Junior School 1 Highgate High Street London N6 5JR
Details of cycle storage (Condition 6), electrical charging points (Condition 7) and hard and soft landscaping including details of SUDs and alterations to the new boundary wall (Condition 8) of planning permission 2019/5756/P dated 14/12/2020
-
2019/1822/P Granted
Channing Junior School 1 Highgate High Street London N6 5JR
Details of hard and soft landscaping required by condition 8 of planning permission 2017/7080/P dated 10/10/2018 (for extension to the east under existing terrace with alterations to the eastern elevation at lower ground level to provide drama studio and re-provide classroom to existing school; creation of a sports changing room facility at subterranean level adjacent to the existing tennis courts including excavation of existing embankment and glazed single storey entrance structure above at playground level).
-
2019/1923/P Granted
Channing Junior School 1 Highgate High Street London N6 5JR
Details of detailed drawings / samples of materials required by condition 4 of planning permission 2018/4925/P dated 09/04/19 (for erection of single storey rear extension to south elevation to provide school hall (with play area above) and kitchen facilities).
-
2019/2523/P Granted
Channing Junior School 1 Highgate High Street London N6 5JR
Details of Construction Method Statement (Biodiversity) required by condition 19 of planning permission 2018/4925/P dated 09/04/2019 (for erection of single storey rear extension to south elevation to provide school hall (with play area above) and kitchen facilities).
Other full applications applications
In Haringey
-
HGY/2026/1706 Granted
38 Strode Road, Tottenham, London, N17 6TZ
Replacement of timber and upvc front, side and rear windows with new double glazed uPVC windows. timber rear exit door be removed and replaced with new high-quality double glazed uPVC door.
-
HGY/2026/1577 Granted
87 Broadwater Road, Tottenham, London, N17 6EP
Replacement of existing UPVC double glazed and timber single glazed windows on front, side and rear elevations with new UPVC double glazed windows.
-
HGY/2026/1879 Awaiting decision
13 Ribblesdale Road, Hornsey, London, N8 7EP
Erection of Flat 1 to have a infill extension and flat 2 with an rear extension. Conversion of existing storage space in attic to a liveable space for Flat 5.
-
HGY/2026/1954 Awaiting decision
Adjacent to 480 - 482 Archway Road, Hornsey, London, N6 4NA
installation of Electric Vehicle Charging Infrastructure on the carriageway adjacent to Adjacent to 480 - 482 Archway Road
-
HGY/2026/2025 Awaiting decision
4 Eastbourne Road, Tottenham, London, N15 6NT
Replace all existing windows throughout the property with new double-glazed uPVC windows. Change the existing timber main entrance door to the property with a new updated double-glazed composite door.