Planning application

HGY/2026/0175

Princess Of Wales, 146 Lea Bridge Road, Hackney, London, E5 9RB

Granted Haringey Adjoining Authority Consultation

Proposal

Installation of street furniture at multiple locations in connection with the provision of an 'ERUV' in Hackney and adjoining local boroughs of Islington and Haringey (Observations to L.B. Hackney - their planning reference 2025/1839)

As published by the council, reference HGY/2026/0175

Timeline

Dates from the published record

  1. 20 Jan 2026

    Received by Haringey

  2. 12 Feb 2026

    Decision issued: No Objection

  3. 24 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About outline applications

How this application type works

An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.

More on outline applications in our guide

Nearby applications

Within 500 metres

  • 2026/0288 Granted

    Princess Of Wales, 146 Lea Bridge Road, Hackney, London, E5 9RB

    Submission of details pursuant to condition 4 (SUDS) attached to planning permission ref 2025/0961 dated 14/01/2026.

    11 Feb 2026 0m away Conditions
  • 2025/2197 Granted

    130A Lea Bridge Road, Hackney, London, E5 9RB

    The proposal replaces the existing timber sash and casement windows with Timber sash and casement windows. Elevations and window schedule appended to this application.

    3 Oct 2025 0m away Full applications
  • P2026/0204/OBS Decided

    Princess Of Wales 146 Lea Bridge Road, Hackney, London, E5 9RB

    Installation of street furniture at multiple locations in connection with the provision of an 'ERUV' in Hackney and adjoining local boroughs of Islington and Haringey.

    28 Jan 2026 80m away
  • 2021/3643 Granted

    Park Office Chatsworth Road, Hackney, London, E5 9QT

    Proposal to remove existing buildings from the site and to provide new office facilities for park depot staff, and provide new storage facilities.

    15 Dec 2021 156m away Full applications
  • 2026/0071 Granted

    26 Wattisfield Road, Hackney, London, E5 9QH

    Roof extension above main roof slope and above two storey outrigger and two front rooflights

    13 Jan 2026 378m away Lawful development
  • 2025/2481 Granted

    151-161 Mildenhall Road, London, E5 0RY

    Non material amendment to planning permission ref 2025/1121 dated 03/07/2025 comprising the addition of a roof light.

    11 Nov 2025 424m away Amendments

In Haringey

  • HGY/2026/2148 Awaiting decision

    Unit 1-2, Ashley House, Ashley Road, Tottenham, London, N17 9LZ

    Request for an Environmental Impact Assessment (EIA) Scoping Opinion under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for the redevelopment of the site comprising of two new buildings ranging between 6-24 storeys, with a maximum height of 90m AOD, to accommodate Use Classes C3, E/F2 and Sui Generis, providing approximately 540 shared-living units1 and 87 residential units with provision of non-residential floorspaces on the ground floors to each building. The Proposed Development will be set around an extensive public realm, communal open spaces, landscaping, with associated blue-badge residents parking and ancillary infrastructure.

    27 Jul 2026 Outline
  • HGY/2026/1857 Awaiting decision

    The O2 Centre 255 Finchley Road,, London,, NW3 6LU

    RE-CONSULTATION FOR ENVIRONMENTAL STATEMENT. Application under Section 73 of the Town and Country Planning Act 1990 (as amended) to vary Conditions I4 (Severability Condition), AD1 (Approved Drawings - Masterplan), AD2 (Approved Drawings - Reserved Matters), AD3 (Approved Drawings - Phase 1), RM1 (Parameter Plans and Development Specification), RM6 (Phasing Plan), RM11 (Reserved Matters - Access Statement), RM21 (Reserved Matters - Total floorspace), D20 (Photo-voltaic Cells), D21 (Phase 1 Long Stay Cycle Parking), D22 (Phase 2 Short Stay Cycle Parking), D24 (Phase 1 Disabled Car Parking), D26 (Phase 1 Fire Safety Implementation of Approved Measures), and M28 (Phase-Wide Lighting Strategy) and the removal of Conditions M6 (Enabling Works) and M7 (Major Utilities Infrastructure) of planning permission ref. 2022/0528/P dated 20 December 2023 for 'Detailed planning permission for Development Plots N3-E, N4, and N5 and Outline planning permission for Development Plots N1, N2, N3, N6, N7, S1 and S8, including demolition of all existing structures and associated works, and redevelopment to include residential development (Class C3), commercial, business and service uses (Class E), local community uses (Class F2), and Sui Generis leisure uses (including cinema and drinking establishments) together with all landscaping, public realm, cycle parking and disabled car parking, highway works and infrastructure within and associated with those Development Plots, in accordance with the Development Specification.?For the avoidance of doubt, the Detailed and Outline planning permission are separate and severable for each of the Plots shown on plan P011 and the description of development on any decision notice issued pursuant to the application would reflect that', to allow for amendments to the Detailed Element (Plots N3-E, N4 and N5) including additional height, alterations to the design, massing and footprint of the buildings; the replacement of Block N4D with a pavilion building; additional residential floorspace (and corresponding reduction in floorspace within Outline Elements); revisions to affordable housing and unit mix and internal layouts; relocation and reduction in community (Class F2) floorspace, additional commercial (Class E(a)) floorspace, reduction in professional services (Class E(c)) floorspace, additional blue badge parking and cycle parking; revised landscaping and additional public realm; and associated works. (Observations to L.B. Camden - their planning reference 2025/0484/P)

    30 Jun 2026 Outline
  • HGY/2026/1458 Granted

    149 Stroud Green Road, London, N4 3PZ

    Conversion of a shop into 2 no. units with associated external alterations including new single entrance doors to each unit, new grey metal panel to cover internal dividing wall as well as new flashing and new lighting to fascia board (Observations to L.B. Islington - their planning reference P2026/1090/FUL)

    22 May 2026 Outline
  • HGY/2026/1155 Granted

    6 Glover Drive, N18 3HF London

    Variation of condition 01 of Ref: 23/02199/FUL to allow an extension of the temporary use for multi-purpose use (Sui Generis) as a cultural and creative events and entertainment space until 20th December 2026 with a reduced operational framework from the period 23rd November to 20th December including a reduced capacity from 15,000 to 10,000, streamlined events schedule restricted to Saturdays and Sundays with curfews of 22:30 and 22:00 respectively, reconfiguration of external operational areas and reduced hours of operation of the loading bay from 07:00-22:30 for this period only (Observations to L.B. Enfield - their planning reference 25/03859/VAR)

    30 Mar 2026 Outline
  • HGY/2026/1371 Granted

    Tottenham Substation, Watermead Way, London, N17 0SG

    Non material change to National Grid (North London Reinforcement Project) Development Consent Order 2014 to change the bypass of Tottenham substation from underground cabling to a new Overhead Line and transmission pylon, changes to existing proposed transmission pylon, and minor extension to the Order Limits. (Note that Haringey Council is not the decision maker for the application.)

    13 May 2026 Outline