Planning application
190, Muswell Hill Broadway, Hornsey, London, N10 3SA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of plant to the rear of the building in association with air conditioning heat pump system and Mechanical Heat Recovery system (MVHR).
As published by the council, reference HGY/2025/2241
Application record
- Reference
- HGY/2025/2241
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Approve with Conditions
- Received
- 19 Aug 2025
- Validated
- 19 Aug 2025
- Decided
- 14 Oct 2025
- Ward
- Muswell Hill
- Decision by
- Delegated Decision
- Postcode
- N10 3SA
Timeline
Dates from the published record
-
19 Aug 2025
Received by Haringey
-
14 Oct 2025
Decision issued: Approve with Conditions
-
10 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Haringey granted permission on 14 October 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Lloyds Bank Building, 140-142 Muswell Hill Broadway, Hornsey, London, N10 3SA
Approval of details pursuant to Conditions 4 (material details), 5 (external surfaces and boundary treatment), 7 (construction management plan) of planning permission ref: HGY/2024/3093 dated 13/01/2025 for the conversion of the existing office spaces and 1 x residential unit (1 x 4bed), over first, and second floor levels only, to provide 4 x residential units (2 x 2beds, 2 x 1beds) with associated external alterations and internal reconfigurations, replacement of the existing windows, new side rooflight, and the replacement of existing rear balconies with new terrace balconies to the existing property.
Granted Conditions Loft or dormer Windows or glazing 23 docs -
203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ
Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch
Granted Full applications 14 docs -
105 & 111 Muswell Hill Broadway, Hornsey, London, N10 3RS
Display of a new Digital Display Screen behind the shopfront window.
Granted Advertising Windows or glazing 10 docs -
105 & 111 Muswell Hill Broadway, Hornsey, London, N10 3RS
Display of 1no. internally illuminated projecting hanging sign and 2no. externally illuminated fascia signs, and installation of window film to front elevation.
Granted Advertising Windows or glazing 10 docs -
Summerland Grange, Summerland Gardens, Hornsey, London, N10 3QP
T1 Small Holm Oak, reduce lateral growth over car park by 2m to clear T2 Large Holm, reduce by 1m approx., head in and thin by 20%
Granted Trees 4 docs -
Summerland Grange, Summerland Gardens, Hornsey, London, N10 3QP
T1 Cypress, fell to ground level G2 Prunus Suckers, cut and remove to open the area T3 Holme Oak, reduce vertical and lateral growth by 2-3 M approx and lift 4 M G4 2 Cherry trees, reduce lateral and vertical growth y 2-3 M approx and lift 4 M on the large tree. Reduce the smaller tree by 1 M approx and clean through
Granted Trees 4 docs
Other full applications
In Haringey
-
HGY/2026/1488 Granted
203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ
Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch
-
HGY/2026/2208 Awaiting decision
21 The Grove Lynton Road, Hornsey, London, N8 8ST
Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.
-
HGY/2026/2340 Awaiting decision
Rowan, Muswell Road, Hornsey, London, N10 2BX
The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.
-
HGY/2026/2284 Awaiting decision
10 & 12 Gladesmore Road, London, N15 6TB
Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.
-
HGY/2026/2062 Awaiting decision
165 Priory Road, Hornsey, London, N8 8NB
Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.