Planning application
HGY/2025/1819
Flat, 134A Crouch Hill, Hornsey, London, N8 9DX
Proposal
Conversion of flat roof over closet wing, to a rear terrace balcony, with existing window opening extended to accommodate double-glazed timber frame door to match character of existing window. Plus refurbishment and/or replacement of existing painted timber sash windows and frames with similar double-glazed versions to match existing. No change of use.
As published by the council, reference HGY/2025/1819
Timeline
Dates from the published record
-
7 Jul 2025
Received by Haringey
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Haringey for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
HGY/2026/0643 Granted
6 The Broadway, Hornsey, London, N8 9SN
Erection of roof extension to facilitate the creation of additional workspace, creation of front roof terrace, re-location of existing AC condensers on roof and installation of Air Source Heat Pump on roof.
-
HGY/2026/0307 Granted
Hornsey Town Hall, The Broadway, London, N8 9JH
Approval of details pursuant to conditions 36 and 37 (BREEAM) attached to planning permission HGY/2017/2220
-
HGY/2026/0751 Granted
Hornsey Town Hall, The Broadway, London, N8 9JH
Approval of details pursuant to condition 33 (Carbon Offset Payment) attached to planning permission HGY/2017/2220
-
HGY/2026/0942 Refused
Hornsey Town Hall, The Broadway, London, N8 9JH
Partial approval of details of the external lighting columns only pursuant to condition 4 (Landscaping) attached to planning permission HGY/2017/2220
-
HGY/2026/0943 Refused
Hornsey Town Hall, The Broadway, London, N8 9JH
Approval of details pursuant to condition 13 (External Lighting) attached to planning permission HGY/2017/2220
-
HGY/2026/0502 Granted
Hornsey Town Hall, The Broadway, London, N8 9JH
Non-material amendment following a grant of planning permission HGY/2017/2220 for alterations to the approved roof enclosure
Other full applications applications
In Haringey
-
HGY/2026/1706 Granted
38 Strode Road, Tottenham, London, N17 6TZ
Replacement of timber and upvc front, side and rear windows with new double glazed uPVC windows. timber rear exit door be removed and replaced with new high-quality double glazed uPVC door.
-
HGY/2026/1577 Granted
87 Broadwater Road, Tottenham, London, N17 6EP
Replacement of existing UPVC double glazed and timber single glazed windows on front, side and rear elevations with new UPVC double glazed windows.
-
HGY/2026/1879 Awaiting decision
13 Ribblesdale Road, Hornsey, London, N8 7EP
Erection of Flat 1 to have a infill extension and flat 2 with an rear extension. Conversion of existing storage space in attic to a liveable space for Flat 5.
-
HGY/2026/1954 Awaiting decision
Adjacent to 480 - 482 Archway Road, Hornsey, London, N6 4NA
installation of Electric Vehicle Charging Infrastructure on the carriageway adjacent to Adjacent to 480 - 482 Archway Road
-
HGY/2026/2025 Awaiting decision
4 Eastbourne Road, Tottenham, London, N15 6NT
Replace all existing windows throughout the property with new double-glazed uPVC windows. Change the existing timber main entrance door to the property with a new updated double-glazed composite door.