Planning application
Brunel Walk, Tottenham, London
Relates to HGY/2022/2723
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Non-material amendments to planning permission HGY/2022/2723 to amend the bin store location
As published by the council, reference HGY/2025/1811
Application record
- Reference
- HGY/2025/1811
- Type
- Non-Material Amendment
- Status
- Under Consultation
- Received
- 4 Jul 2025
- Validated
- 4 Jul 2025
- Ward
- Seven Sisters
- Decision by
- Delegated Decision
Site history
Applications at this address on the Haringey register
This site has had 2 applications since 2024: 1 approved, 0 refused.
-
HGY/2024/3509 Granted
Brunel Walk, Tottenham, London
Non-Material amendment to planning permission (HGY/2022/2273) to amend the wording of condition 21 (Energy and Overheating Assessment)
Timeline
Dates from the published record
-
4 Jul 2025
Received by Haringey
-
25 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Haringey took a median of 53 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
HGY/2022/2723 Granted
Brunel Walk, London, N15 5HQ
Redevelopment of Brunel Walk to provide 45 new Council rent homes in four buildings ranging from 3 to 4-storeys high including 39 apartments and 6 maisonettes. Provision of associated amenity and play space, cycle and refuse/recycling stores and 4 wheelchair parking spaces. Reconfiguration and enhancement of existing parking areas and outdoor communal areas and play spaces on the Turner Avenue Estate
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Haringey for determination, against a statutory target of eight weeks. Over the last year Haringey decided amendment applications in a median of 41 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Other amendment applications
In Haringey
-
HGY/2026/2429 Awaiting decision
Flat 4, 1 Willoughby Road, Hornsey, London, N8 0HR
Non-Material Amendment to planning permission HGY/2015/1594 to convert existing storage room into an additional bedroom, to convert existing 2-bedroom split level flat into a 3-bedroom flat.
-
HGY/2026/1890 Granted
20 Victoria Road, Hornsey, London, N4 3SQ
Non-Material Amendment to planning permission HGY/2025/2901 for the substitution of the approved concealed zinc flat roof covering with a concealed GRP (Glass Reinforced Plastic) flat roof covering to the approved single-storey rear extension.
-
HGY/2026/1927 Granted
86 Southwood Lane, Hornsey, London, N6 5SY
Minor Material Amendment application under Section 73 of the Town and Country Planning Act for variation to condition 2 attached to planning permission HGY/2025/2929 to alter coping details of the boundary wall.
-
HGY/2026/2387 Granted
810 High Road, Tottenham, London, N17 0DH
Non-Material Amendment to amend condition 5 (Landscaping) to allow greater flexibility in potential re-planting attached to Planning Permission HGY/2017/1181 approved on 08/06/2017, in relation to 810-812 High Road, Tottenham, London, N17 0DH
-
HGY/2026/1994 Granted
St Ignatius Church, High Road, Tottenham, London, N15 6ND
Non-Material Amendment to planning reference HGY/2025/1497 for the revisions to the site layout, comprising the widening of the existing path from 1.2m to 1.5m, the addition and relocation of cycle storage, and the relocation of site elements within the scheme, including decorative hard landscaping, together with revised planting areas, the repositioning and addition of seating area.