Planning application
65, St James's Lane, London, N10 3QY
Works: Extension Loft or dormer Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Creation of mono-pitch roof above existing single storey side garage, single storey upper ground floor rear extension, re-paving of front garden with new steps and balustrades to front entrance, re-cladding of rear dormer with natural blue slate.
As published by the council, reference HGY/2021/1793
Application record
- Reference
- HGY/2021/1793
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Approve with Conditions
- Received
- 22 Jun 2021
- Validated
- 22 Jun 2021
- Decided
- 16 Aug 2021
- Ward
- Muswell Hill
- Decision by
- Delegated Decision
- Postcode
- N10 3QY
Timeline
Dates from the published record
-
22 Jun 2021
Received by Haringey
-
16 Aug 2021
Decision issued: Approve with Conditions
-
15 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
71 Hillfield Park, Hornsey, London, N10 3QU
Replacement of existing single glazed windows and doors to the ground floor flat with new timber double glazed windows and doors to match the existing.
Granted Full applications Windows or glazing 12 docs -
67 Muswell Hill Place, Hornsey, London, N10 3RP
Certificate of lawfulness for the formation of a rear dormer, hip to gable extension including the insertion of 3 front rooflights - proposed use
Granted Lawful development Extension Loft or dormer 15 docs -
47 Muswell Hill Place, Hornsey, London, N10 3RP
91% historically approved · decision due ~25 Aug
Erection of a single storey rear extension and alterations to the rear garden.
Awaiting decision Householder Extension 4 docsSmall domestic -
65 Muswell Hill Place, Hornsey, London, N10 3RP
Certificate Of Lawfulness (Proposed) for the erection of a front porch.
Granted Lawful development Extension 10 docsSmall domestic -
62, St James's Lane, London, N10 3RD
Construction of a dormer with roof lights on front slope.
Granted Full applications Loft or dormer 8 docs -
Flat B, 30, Hillfield Park, London, N10 3QS
Replacement of existing white painted timber rear kitchen windows and balcony windows/doors with white timber-effect upvc variants
Granted Full applications Windows or glazing 6 docs
Other full applications applications
In Haringey
-
HGY/2026/1488 Granted
203-209 Muswell Hill Broadway, Hornsey, London, N10 3RQ
Installation of defibrillator and bleed kit cabinets to external wall of Nationwide Building Society branch
-
HGY/2026/2208 Awaiting decision
21 The Grove Lynton Road, Hornsey, London, N8 8ST
Increase the height of the embrasures of the parapet wall gutters throughout. Supply and install 140mm of insulation into the parapet gutter. Install a metal capping – by bauder on the top of the parapet wall. New roof covering – supply and install new tile roof covering. New tiles to be Marley Wessex Smooth Grey.
-
HGY/2026/2340 Awaiting decision
Rowan, Muswell Road, Hornsey, London, N10 2BX
The riser team is required to run a new inlet pipe from the isolation valve, extending approximately 5m to supply the new meter boxes, which will be installed at the front of the building.
-
HGY/2026/2284 Awaiting decision
10 & 12 Gladesmore Road, London, N15 6TB
Erection of first floor extensions to the rear elevations of Nos. 10 and 12 Gladesmore Road and the alteration of their ground floor rear fenestration.
-
HGY/2026/2062 Awaiting decision
165 Priory Road, Hornsey, London, N8 8NB
Change of use from upper floor residential unit into a 6-persons House in Multiple Occupation (HMO), with associated cycle and bin stores in rear courtyard.