Planning application
Land At Frolesworth Road Broughton Astley Leicestershire
Works: New dwelling Demolition Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Outline planning application for residential development of up to 550 dwellings, with all matters reserved except means of site access; land for a primary school expansion; land for a Community Facility; Cemetery expansion and car parking; land for Recreational Ground expansion; public open space; associated ancillary earthworks and enabling works; and demolition of existing structures. All other matters (layout, appearance, scale and landscaping) reserved for subsequent approval.
As published by the council, reference 26/00480/OUT
Application record
- Reference
- 26/00480/OUT
- Type
- Outline Application
- Status
- Pending Consideration
- Received
- 31 Mar 2026
- Validated
- 31 Mar 2026
- Ward
- Broughton Astley Primethorpe And Sutton
- Parish
- Broughton Astley
Timeline
Dates from the published record
-
31 Mar 2026
Received by Harborough
-
22 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 26 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Harborough took a median of 68 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Stantec PLC Agent, registered in Warrington
Active · incorporated 2024 · Warrington
342 applications on PlanIndex · across 108 councils · 93% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
241 documents on file for this application
- REVISION C
- TRANSPORT ES COVERING LETTER FROM APPLICANT
- ADDENDUM CHAPTER 7 ES (TRANSPORT & ACCESS)
- APPENDIX 7.2B ES (TRAVEL PLAN)
- APPENDIX 7.1A ES (TRANSPORT ASSESSMENT)
- COMMUNITY FACILITIES AND INDOOR SPORT OBLIGATION REQUEST
- ENVIRONMENTAL HEALTH
- HDC ENVIRONMENTAL HEALTH
- NATIONAL HIGHWAYS
- HDC ENVIRONMENTAL HEALTH
- LCC ECOLOGY
- VERSION 3
- OBJECTION COMMENT
- PHOTO A
- PHOTO B
- PHOTO C
- SUPPORTING VIDEOS
- SUPPORTING VIDEOS
- LEAD LOCAL FLOOD AUTHORITY
- LLFA
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- PHOTO EVIDENCE
- VIDEO EVIDENCE
- E.MAIL
- 17293.JPG
- 17290.JPG
- 17287.JPG
- 17284.JPG
- 17278.JPG
- 17276.JPG
- 17274.JPG
- 17271.JPG
- 17266.JPG
- 17262.JPG
- 17260.JPG
- E.MAIL
- 2AF5448C-731B-4291-867A-66BBEDF6C3C7.JPG
- FEC6467B-90CC-425E-A8C1-C52A7BEB02AB.JFIF
- E.MAIL
- ACTIVE TRAVEL ENGLAND
- LCC HIGHWAYS
- ADDENDUM - J DURANCE
- OBJECTION DUE TO ENVIRONMENTAL IMPACT - PHOTO EVIDENCE
- OBJECTION DUE TO FLOODING RISK - PHOTO EVIDENCE
- OBJECTION DUE TO PEDESTRIAN & TRAFFIC SAFETY AND JUNCTION IMPACT - PHOTO EVIDENC
- LCC HIGHWAYS
- BROUGHTON ASTLEY PETITION: DIGITAL SIGNATURES
- SUPPORTING PHOTOGRAPH
- SUPPORTING VIDEO
- SUPPORTING VIDEO
- SUPPORTING PHOTOGRAPH
- SUPPORTING PHOTOGRAPH
- PHOTO EVIDENCE TO ASSIST OBJ. COMMENT
- PHOTO EVIDENCE TO ASSIST OBJ. COMMENT
- PHOTO EVIDENCE TO ASSIST OBJ. COMMENT
- OBJECTION COMMENT
- ENVIRONMENT AGENCY
- SCREENSHOT_20260512_080601_COM.GOOGLE.ANDROID.APPS.MAPS_SAFE_REDACTED.JPG
- IMG-20260510-WA0075_SAFE_REDACTED.JPG
- IMG-20260510-WA0034_SAFE_REDACTED.JPG
- IMG-20260510-WA0032_SAFE_REDACTED.JPG
- IMG-20260510-WA0030_SAFE_REDACTED.JPG
- NEIGHBOUR PHOTOGRAPH OF FLOODING
- NEIGHBOUR PHOTOGRAPH OF FLOODING
- BROUGHTON ASTLEY PETITION: INFRASTRUCTURE FIRST
- ACCOMPANYING OBJECTION PHOTOGRAPHS
- ACCOMPANYING OBJECTION PHOTOGRAPHS
- ACCOMPANYING OBJECTION PHOTOGRAPHS
- ACCOMPANYING OBJECTION PHOTOGRAPHS
- NATURAL ENGLAND
- NATURAL ENGLAND GENERAL ADVICE
- OBJECTION COMMENT
- NATIONAL GRID
- NATIONAL GRID -GUIDANCE DOCUMENTS
- NATIONAL GRID -GUIDANCE DOCUMENTS
- NATIONAL GRID -GUIDANCE DOCUMENTS
- NATIONAL GRID -GUIDANCE DOCUMENTS
- NATIONAL GRID -GUIDANCE DOCUMENTS
- EXISTING FR DRAINAGE INFRASTRUCTURE - REFER TO PUBLIC COMMENTS RECEIVED 4TH MAY
- MEC FR DRAINAGE PROPOSAL 1 - REFER TO PUBLIC COMMENTS RECEIVED 4TH MAY 2026
- MEC FR DRAINAGE PROPOSAL 2 - REFER TO PUBLIC COMMENTS RECEIVED 4TH MAY 2026
- HDC CONTAMINATED LAND AND AIR QUALITY OFFICER
- BA STORM OVERFLOW EDM COMPARISON
- STW EIR1103 SUPPORTING EVIDENCE
- SUPPORTING EVIDENCE BA TREATEMENT WORKS CAPACITY ASSESSMENT 26
- SUPPORTING EVIDENCE BA FLOODMAPPER DATA 2026
- SPORTS ENGLAND
- HISTORIC ENGLAND
- NATIONAL HIGHWAYS
- CONSERVATION OFFICER
- FLOOD INVESTIGATION, BROUGHTOIN ASTLEY, 2024
- IMAGES TO ACCOMPANY PUBLIC COMMENTS RECEIVED 28.04.2026
- IMAGES TO ACCOMPANY PUBLIC COMMENTS RECEIVED 28.04.2026
- IMAGES TO ACCOMPANY PUBLIC COMMENTS RECEIVED 28.04.2026
- ACCOMPANYING PHOTOS
- ACCOMPANYING PHOTOS
- ACCOMPANYING PHOTOS
- ACCOMPANYING PHOTO
- SUPPORT EVIDENCE OF FLUVIAL FLOODING
- SUPPORT EVIDENCE OF FLUVIAL FLOODING
- SUPPORT EVIDENCE OF FLUVIAL FLOODING
- SUPPORT EVIDENCE OF FLUVIAL FLOODING
- SUPPORT EVIDENCE OF FLUVIAL FLOODING
- PHOTO EVIDENCE OF FLOODING
- PHOTO EVIDENCE OF FLOODING
- PHOTO EVIDENCE OF FLOODING
- PHOTO EVIDENCE OF FLOODING
- PHOTO EVIDENCE OF FLOODING
- HDC ENVIRONMENT COORDINATOR
- HDC STRATEGIC HOUSING AND ENABLING OFFICER
- BLABY DISTRICT COUNCIL
- ENVIRONMENT AGENCY
- LEICESTERSHIRE POLICE
- HDC CLIMATE IMPACT OFFICER
- HDC NEIGHBOURHOOD AND GREEN SPACES OFFICER - OPEN SPACE DESIGN GUIDE
- HDC NEIGHBOURHOOD AND GREEN SPACES OFFICER
- LLR ICB RESPONSE
- NATIONAL GAS TRANSMISSION
- CADENT GAS
- CADENT GAS SUPPORTING INFORMATION
- HSE
- LEICESTERSHIRE FIRE AND RESCUE
- HDC ENVIRONMENTAL SERVICES
- APPLICATION FORM - WITHOUT PERSONAL DATA
- THE LOCATION PLAN
- EIA NON TECHNICAL SUMMARY
- ES VOL 1 SITE LOCATION
- ES VOL 1 SITE LAND USE PLAN
- ES VOL 1 ACCESS AND MOVEMENT
- ES VOL 1 PARAMETER PLAN STOREY HEIGHTS
- ES VOL 1 PARAMETER PLAN GREEN INFRASTRUCTURE
- ES VOL 1 ILLUSTRATIVE MASTERPLAN
- ES VOL 1 CHAPTER 1 INTRODUCTION
- ES VOL 1 CHAPTER 2 METHODOLOGY
- ES VOL 1 CHAPTER 3 SITE AND DEVELOPMENT DESCRIPTION
- ES VOL 1 CHAPTER 4 ALTERNATIVES & DESIGN EVOLUTION
- ES VOL 1 CHAPTER 5 CONSTRUCTION METHODOLOGY AND PHASING ALTERNATIVES & DESIGN EV
- ES VOL 1 CHAPTER 6 ODOUR
- ES VOL 1 CHAPTER 7 TRANSPORT AND ACCESS
- ES VOL 1 CHAPTER 8 WATER RESOURCES AND FLOOD RISK
- ES VOL 1 CHAPTER 9 SUMMARY AND RESIDUAL EFFECTS
- ES VOL 1 MAIN TEXT AND FIGURES
- ES VOL 2 SCREENING OPINION
- ES VOL 2 STATEMENT OF EXPERTISE
- ES VOL 2 EIA SCOPING REPORT
- ES VOL 2 SCOPING OPINION
- ES VOL 2 STATEMENT OF COMMUNITY INVOLVEMENT
- ES VOL 2 SUMMARY OF GUIDANCE & STANDARDS
- ES VOL 2 ODOUR RISK ASSESSMENT
- ES VOL 2 HDC ENVIRONMENTAL HEALTH SCOPING
- ES VOL 2 WIND ROSE DIAGRAM
- ES VOL 2 APPENDIX 6.5 PLANNING STATEMENT FOR ANAEROBIC DIGESTER
- ES VOL 2 APPENDIX 6.6 AIR QUALITY APPRAISAL FOR A D
- ES VOL 2 APPENDIX 7.2 TRAVEL PLAN
- ES VOL 2 APPENDIX 8.1 FLOOD RISK ASSESSMENT
- ES VOL 2 TECHNICAL TITLE AND CONTENTS PAGE
- DRAINAGE STRATEGY
- TOPOGRAPHICAL SURVEY SHEET 1
- TOPOGRAPHICAL SURVEY SHEET 2
- TOPOGRAPHICAL SURVEY SHEET 3
- TOPOGRAPHICAL SURVEY SHEET 4
- TOPOGRAPHICAL SURVEY SHEET 5
- TOPOGRAPHICAL SURVEY SHEET 6
- TOPOGRAPHICAL SURVEY SHEET 7
- TOPOGRAPHICAL SURVEY OVERVIEW
- PARAMETER PLAN 01 - LAND USE LAYOUT
- PARAMETER PLAN 02 ACCESS AND MOVEMENT
- ILLUSTRATIVE MASTERPLAN
- PARAMETER PLAN - STOREY HEIGHTS
- PARAMETER PLAN -GREEN INFRASTRUCTURE
- ROUNDABOUT GENERAL ARRANGEMENT
- T-JUNCTION ACCESS
- ROUNDABOUT & SITE ACCESS SWEPT PATH ANALYSIS
- COVERING LETTER
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- PLANNING STATEMENT
- ACOUSTIC ASSESSMENT
- AIR QUALITY ASSESSMENT
- ODOUR ASSESSMENT
- UTILITIES STATEMENT
- TRAVEL PLAN
- STATEMENT OF COMMUNITY INVOLVEMENT
- ECOLOGICAL APPRAISAL
- STATUTORY BIODIVERSITY METRIC
- OUTLINE CLIMATE CHANGE STRATEGY
- AGRICULTURAL LAND AND CLASSIFICATION & CIRCUMSTANCES
- HEALTH IMPACT ASSESSMENT
- SOCIAL VALUE ASSESSMENT
- ARCHAEOLOGY & HERITAGE ASSESSMENT
- UTILITIES ASSESSMENT
- ES VOL 2 TRANSPORT ASSESSMENT
- TRANSPORT ASSESSMENT
- GEO-ENVIRONMENTAL DESK STUDY
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Harborough for determination, against a statutory target of eight weeks. Over the last year Harborough decided outline applications in a median of 186 days. More in our guide to how long planning decisions take.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
62A Blenheim Crescent Broughton Astley Leicestershire LE9 6QY
The Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) - Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus (1no. 9m medium wooden pole) - Permitted Development - For information purposes only. This is not an application to which comments can be made.
Granted Prior approval -
50 Blenheim Crescent Broughton Astley Leicestershire LE9 6QY
Erection of a single storey front extension
Granted Full applications Extension 5 docsSmall domestic -
Sutton Lodge Farm Frolesworth Road Broughton Astley Leicestershire LE9 6PG
91% historically approved · decision due ~15 Oct
Discharge of Condition 9 (Maintenance of Surface Water Drainage System) of 25/01048/FUL
Awaiting decision -
70 Blenheim Crescent Broughton Astley Leicestershire LE9 6QX
Erection of a two storey side extension and creation of a parking space
Granted Full applications Extension -
7 Deniston Avenue Broughton Astley Leicestershire LE9 6QT
87% historically approved · decision due ~3 Sep
Erection of a single storey front extension
Decided Full applications ExtensionSmall domestic -
27 Jubilee Road Broughton Astley Leicestershire LE9 6PN
Erection of a single storey rear extension
Granted Full applications Extension 5 docsSmall domestic
Other outline applications
In Harborough
-
26/01275/OUT Awaiting decision
7 Ashley Road Medbourne Leicestershire LE16 8DL
Outline application for erection of one dwelling (Self-Build) (Access to be considered)
-
25/01537/OUT Refused
Land To The South Of Station Road North Kilworth Leicestershire
Outline planning application for up to 49 dwellings and associated access (all matters reserved except for access)
-
25/00550/OUT Granted
Land At Lambcote Hill Farm Swinford Road Walcote Leicestershire
Hybrid planning application consisting of full planning application for the erection and operation of an energy storage system including associated infrastructure, engineering works, and formation of vehicular access from highway; and outline planning application (with all matters reserved) for the erection and operation of a transmission substation with associated infrastructure, engineering works and internal access arrangements
-
25/01518/OUT Granted
Cupplesfield 2 Stoughton Road Gaulby Leicestershire LE7 9BB
Hybrid Application comprising of a full planning application for the reduction of existing dwelling and associated alterations to form a smaller dwelling, and an outline planning application for the creation of a self-build plot with all matters reserved except for access
-
24/01661/OUT Granted
Land West Of Manor Farm Walk Tilton On The Hill Leicestershire
Outline Application for residential development comprising 9 dwellings (3 Affordable, 6 Custom-Build) with associated access, landscaping, sustainable drainage infrastructure and provision of a public footpath (access to be considered, all other matters reserved)