Planning application

282 North End Road, London, SW6 1NH

Awaiting decision Hammersmith and Fulham P/2026/02502/DLBC Details to Meet Conditions LBC

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Submission of details of A detailed method statement and schedule of works with full particulars for all works and Material details and schedule covering the internal refurbishment elements of the proposal pursuant to condition 4 of planning application ref: 2024/01842/LBC granted 30th January 2026.

As published by the council, reference P/2026/02502/DLBC

Application record

Reference
P/2026/02502/DLBC
Type
Details to Meet Conditions LBC
Status
Pending As published: REGISTERED
Received
22 Sep 2026
Validated
29 Sep 2026
Ward
Lillie
Postcode
SW6 1NH

Comment by 20 October 2026

The council is taking comments on this application until then. Comments go to Hammersmith and Fulham through their own planning portal.

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 4 applications since 2019: 1 approved, 0 refused.

  • P/2026/02452/DET Awaiting decision

    282 North End Road, London, SW6 1NH

    Submission of details of the external sound level emitted from plant/ machinery/ equipment and full details of the proposed mitigation measures pursuant to condition 5; anti-vibration measures pursuant to condition 6; A detailed method statement and schedule of works with full particulars for all works and Material details and schedule covering the internal refurbishment elements of the proposal pursuant to condition 9 of planning permission ref: 2024/01841/FUL granted 30th January 2026.

    Submitted 23 Sep 2026 Conditions
  • 282 North End Road, London, SW6 1NH

    Submission of details pursuant to Condition 4 (Method Statement and Schedule of Works) of Listed Building Consent Ref: 2024/01842/LBC granted 30th January 2026.

    Decided 21 Sep 2026 Conditions
  • 2019/00787/TREE Awaiting decision

    282 North End Road London SW6 1NH

    T4787: Carpinus betulus : cut back off building to provide minimum 1m clearance.Reason: Is raising tree grille - is nearly touching adjacent building. lots of minor bark wounds on stem.T4788: Carpinus betulus ; raise lower canopy to 3m.Reason;terminal bark wounds at abse and lower stem - comprehensive bark loss evident - exposed is still sound. low canopy.T4789: Carpinus betulus: raise lower canopy to 3m, remove dead branches and cut back off building to provide minimum 1m clearance.Reason; low canopy- some detached branches stuck in lower canopy - s nearly touching building.T4786: Carpinus betulus : cut back off building to provide minimum 1m clearance.Reason: congested fork at 2m - southeast lower laterals rubbing against adjacent building.T4785: Carpinus betulus: remove stake and remove tree grille.Reason: congested unions at 1.5m with included bark-minor adaptive growth visible. Obsolete stake present and is lifting tree grille.

    Submitted 14 Mar 2019 Trees

Timeline

Dates from the published record

  1. 22 Sep 2026

    Received by Hammersmith and Fulham

  2. 29 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 1 Oct 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 24 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 80 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Savills Limited Agent, registered in London

Active · incorporated 1987 · London

2,298 applications on PlanIndex · across 191 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Romerstal Inc Applicant, registered in Tortola

Registered · incorporated 2023 · Tortola

2 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided condition discharge and variation applications in a median of 101 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 282 North End Road, London, SW6 1NH

    P/2026/02452/DET Submitted 23 Sep 2026 50 yards away

    95% historically approved · decision due ~23 Nov

    Submission of details of the external sound level emitted from plant/ machinery/ equipment and full details of the proposed mitigation measures pursuant to condition 5; anti-vibration measures pursuant to condition 6; A detailed method statement and schedule of works with full particulars for all works and Material details and schedule covering the internal refurbishment elements of the proposal pursuant to condition 9 of planning permission ref: 2024/01841/FUL granted 30th January 2026.

    Awaiting decision Conditions 6 docs
  • 282 North End Road, London, SW6 1NH

    P/2026/01838/DLBC Submitted 6 Jul 2026 50 yards away

    Submission of details pursuant to Condition 4 (Method Statement and Schedule of Works) of Listed Building Consent Ref: 2024/01842/LBC granted 30th January 2026.

    Granted Conditions 17 docs
  • 284 - 288 North End Road London SW6 1NH

    2019/03820/DET Submitted 20 Dec 2019 50 yards away

    95% historically approved · decision due ~17 Feb

    Submission of details of a final Demolition Management Plan (including a Demolition Method Statement) and a risk assessment based on the Mayor's Best Practice Guidance (The control of dust and emissions from construction and demolition) and a method statement for emissions control (including an inventory and timetable of dust generating activities, emission control methods and where appropriate air quality monitoring), pursuant to Condition 4; details of a final Demolition Logistics Plan (DLP), pursuant to Condition 5; and details of a Piling Method Statement (detailing the depth and type of piling to be undertaken and the methodology by which such piling will be carried out, including measures to prevent and minimise the potential for damage to subsurface sewerage infrastructure, and the programme for the works), pursuant to Condition 50 of planning permission reference: 2017/04216/FUL dated 29th March 2019.

    Awaiting decision Conditions Demolition 20 docs
  • 286 - 288 North End Road, London, SW6 1NH

    P/2026/01602/ADV Submitted 22 Jun 2026 50 yards away

    Display of an internally illuminated fascia sign, consisting of individual aluminium lettering, with opal acrylic face in white; and display of window manifestations on shop front glazing.

    Granted Advertising Windows or glazing 12 docs
  • 282 North End Road London SW6 1NH

    2019/00787/TREE Submitted 14 Mar 2019 50 yards away

    97% historically approved · decision due ~9 May

    T4787: Carpinus betulus : cut back off building to provide minimum 1m clearance.Reason: Is raising tree grille - is nearly touching adjacent building. lots of minor bark wounds on stem.T4788: Carpinus betulus ; raise lower canopy to 3m.Reason;terminal bark wounds at abse and lower stem - comprehensive bark loss evident - exposed is still sound. low canopy.T4789: Carpinus betulus: raise lower canopy to 3m, remove dead branches and cut back off building to provide minimum 1m clearance.Reason; low canopy- some detached branches stuck in lower canopy - s nearly touching building.T4786: Carpinus betulus : cut back off building to provide minimum 1m clearance.Reason: congested fork at 2m - southeast lower laterals rubbing against adjacent building.T4785: Carpinus betulus: remove stake and remove tree grille.Reason: congested unions at 1.5m with included bark-minor adaptive growth visible. Obsolete stake present and is lifting tree grille.

    Awaiting decision Trees 3 docs
  • 284 - 288 North End Road London SW6 1NH

    2019/01090/DET Submitted 9 Apr 2019 50 yards away

    Submission of details of a preliminary risk assessment report pursuant to Condition 22; details of a site investigation scheme pursuant to Condition 23 of Planning permission 2017/04216/FUL granted 29th March 2019.

    Granted Conditions 15 docs

In Hammersmith and Fulham

  • 26 Sulivan Road And 92-116 Carnwath Road, London

    Submission of details pursuant to Phase 3 Condition 41 (Electric Vehicle Charger Points) of planning permission reference: 2011/01753/FUL dated 29th March 2012.

    Received 9 Jun, published by the council 24 Jul 2026 Conditions
  • 147 Blythe Road, London, W14 0HL

    Submission of details of a demolition method statement and a construction management plan pursuant to condition 4; a Construction Logistics Plan pursuant to condition 9 of planning permission ref: 2025/03544/FUL granted 23rd December 2025.

    Received 19 Jun, published by the council 24 Jul 2026 Conditions
  • 120 Askew Road,London,W12 9BL

    Submission of details of a scheme to ensure that all occupiers, other than those with disabilities who are blue badge holders, have no entitlement to parking permits from the Council and to ensure that occupiers are informed, prior to occupation, of such restriction, pursuant to Condition 8; details of the proposed double-stacking cycle racks to be installed within the existing cycle storage area, as indicated on drawing no. PR-02-101 Rev. P2, pursuant to Condition 18; and details of the installation of the Air Source Heat Pumps or Electric Boilers to be provided for space heating and hot water, pursuant to Condition 21 of planning permission reference: 2019/03797/FUL granted 31st July 2020.

    Received 13 Apr, published by the council 24 Jul 2026 Conditions
  • P/2026/02452/DET Awaiting decision

    282 North End Road, London, SW6 1NH

    Submission of details of the external sound level emitted from plant/ machinery/ equipment and full details of the proposed mitigation measures pursuant to condition 5; anti-vibration measures pursuant to condition 6; A detailed method statement and schedule of works with full particulars for all works and Material details and schedule covering the internal refurbishment elements of the proposal pursuant to condition 9 of planning permission ref: 2024/01841/FUL granted 30th January 2026.

    Received 23 Sep, published by the council 1 Oct 2026 Conditions
  • 227 Wood Lane, London

    Discharge of Condition 13 (Contamination: Verification Report) of planning permission (ref. 2020/00300/FUL) dated 22 November 2023 (as amended by ref: 2024/01572/NMAT dated 19 September 2024).

    Received 29 May, published by the council 24 Jul 2026 Conditions