Planning application
19 Hythe Road LONDON NW10 6RT
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
26/01117/FULOPDC Demolition of the redundant lift shaft enclosure and removal of any remaining lift apparatus, with associated reparative and making-good works to the eastern side elevation of the building, including affected fixings, abutments, weathering details and building fabric.
As published by the council, reference P/2026/02074/OPDOBS
Application record
- Reference
- P/2026/02074/OPDOBS
- Type
- Observations to OPDC
- Status
- Pending As published: REGISTERED: Under Assessment
- Received
- 7 Aug 2026
- Validated
- 17 Aug 2026
- Ward
- College Park And Old Oak
- Postcode
- NW10 6RT
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 2 applications since 2026.
-
P/2026/01965/OPDOBS Withdrawn
19 Hythe Road LONDON NW10 6RT
26/0117/FULOPDC Demolition of the redundant lift shaft enclosure and removal of any remaining lift apparatus, with associated reparative and making-good works to the eastern side elevation of the building, including affected fixings, abutments, weathering details and building fabric
Timeline
Dates from the published record
-
7 Aug 2026
Received by Hammersmith and Fulham
-
17 Aug 2026
Validated
Checked as complete and ready for consideration.
-
22 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 12 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 80 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
1 document on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham's median decision took 80 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Hammersmith and Fulham's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Unit 5, Apex Industrial Estate, 20-22 Hythe Road, London, NW10 6RT
Change of use from light industrial (Use Class E(g)(iii)) to storage and distrib
Granted Full applications -
17 - 18 Hythe Road London NW10 6RT
Erection of an additional floor at roof level.
Refused Full applications -
17 - 18 Hythe Road London NW10 6RT
Change of use of ground floor workshop to use as a cafe (Class A3).
Granted Full applications -
Unit 5 Apex Industrial Estate 20-22 Hythe Road London NW10 6RT
96% historically approved · decision due ~13 Aug
Change of use from light industrial (Use Class E(g)(iii)) to storage and distribution (Use Class B8).
Awaiting decision -
19, Hythe Road, LONDON, NW10 6RT
Demolition of the redundant lift shaft enclosure and removal of any remaining li
Granted Full applications Demolition -
19 Hythe Road LONDON NW10 6RT
26/0117/FULOPDC Demolition of the redundant lift shaft enclosure and removal of any remaining lift apparatus, with associated reparative and making-good works to the eastern side elevation of the building, including affected fixings, abutments, weathering details and building fabric
Withdrawn Demolition 1 doc