Skip to content
PlanIndex Get alerts
Menu

Planning application

P/2026/01191/FUL

Tesco Car Park, Brook Green, 180 Shepherd's Bush Road And Opposite 1 - 12 Barb Mews, London, W6

Awaiting decision Hammersmith and Fulham Full Planning Application

Proposal

Redevelopment of part of surface car park comprising the erection of a part two, part three storey building to provide 15 residential dwellings (Class C3) and erection of part one, part two storey building to provide 1 single family dwellinghouse (Class C3); associated landscaping, boundary treatments, the creation of a footpath fronting Barb Mews, formation of cycle parking, refuse and recycling storage and one off street car parking space.

As published by the council, reference P/2026/01191/FUL

Timeline

Dates from the published record

  1. 1 May 2026

    Received by Hammersmith and Fulham

  2. 1 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. 31 Jul 2026

    Status changed to REGISTERED: Under Assessment

    Previously REGISTERED: Under Consultation.

  5. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Hammersmith and Fulham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/00366/TREE5D Awaiting decision

    180 Shepherd's Bush Road London W6 7NL

    fell 1 x Maple Tree, car park, Due to the health and safety of the public

    10 Feb 2025 0m away Trees
  • P/2026/00803/FUL Awaiting decision

    Top Floor Flat,160 Shepherd's Bush Road,London,Hammersmith And Fulham,W6 7PB

    Erection of a rear extension at third floor level, on top of the existing back addition.

    20 Mar 2026 91m away Full applications
  • 2025/01991/TREE Awaiting decision

    23 Lena Gardens, London, W6 7PY

    REAR Garden: Birch - Reduce height back to previous cuts (approx 3m off) to allow more light into the garden.

    18 Jul 2025 109m away Trees
  • 2026/00145/FUL Granted

    Flat Ground Floor, 21 Lena Gardens, London, W6 7PY

    Erection of a single storey rear extension at ground floor level to the side of the existing back addition; increasing the height and installation of new rooflights above the roof of ground floor rear back addition; infilling of the existing windows and installation of a new window to the rear elevation and installation of a new window opening to the side of ground floor rear back addition; installation of a door to replace the existing window to the side elevation, installation of a new window to replace the existing door and window to rear elevation at lower ground floor level; erection of an external staircase from lower ground to upper ground floor level in the rear garden.

    20 Jan 2026 110m away Full applications
  • 2025/03574/FUL Awaiting decision

    1A Barb Mews, London, W6 7PA

    Change of use of the existing property from Class E(g) to a single dwellinghouse Class C3; erection of an extension at first floor level, including a flat green roof and installation of 5no. solar pv panels on top; formation of an external roof terrace and installation of an air source heat pump within an enclosure, at first floor level above the remaining ground floor roof; alterations to fenestration to the southern and eastern elevation at ground floor level; associated works and alterations.

    24 Dec 2025 116m away Full applications
  • P/2026/01311/FUL Awaiting decision

    Phoenix Lodge Mansions Brook Green, London, W6 7BG

    Resurfacing and replacement of external hardstanding.

    15 May 2026 120m away Full applications

In Hammersmith and Fulham

  • P/2026/01929/FUL Awaiting decision

    Peabody Estate Blocks J-R Fulham Palace Road London W6 9QQ

    Replacement of all existing timber framed single glazed sliding sash windows with new timber framed double glazed sliding sash windows; replacement of existing doors with new doors.

    29 Jul 2026 Full applications
  • 770 Fulham Road, London, SW6 5SJ

    Erection of a 1.7 metre high obscured glazed screen around part of the flat roof of the existing single storey rear extension, in connection with the creation of a roof terrace.

    1 Jun 2026 Full applications
  • 2025/01323/FUL Refused

    Pavement Adjacent To 1 Hammersmith Broadway London W6 9DL

    Installation of a "Pulse Smart Hub" consisting of a free-standing structure featuring a fully accessible interactive tablet along with integrated digital display screens on two sides and emergency functionality including provision of defibrillators.

    13 May 2025 Full applications
  • P/2026/01915/FUL Awaiting decision

    Peabody Estate, Block S, T And U Fulham Palace Road London W6 9QY

    Replacement of all existing timber framed single glazed sliding sash windows with new timber framed double glazed sliding sash windows; replacement of existing doors with new doors.

    27 Jul 2026 Full applications
  • P/2026/01907/FUL Awaiting decision

    47, Kings Court Hamlet Gardens, London, W6 0RN

    Replacement of 3no. existing single glazed Crittall steel windows with new double glazed Crittall steel windows, to the side elevation at second floor level (Flat 47).

    26 Jul 2026 Full applications