Archive · Hammersmith and Fulham · 2020
Planning applications in Hammersmith and Fulham, October 2020
Page 2 of 2, newest first. Back to the first page for October 2020.
Applications, October 2020
Newest first ยท page 2 of 2
-
2020/02568/DLBC Awaiting decision
Olympia Exhibition Centre Hammersmith Road London W14 8UX
Details for the partial discharge of condition 10 (Detailed External Materials) in relation to works associated with Central Hall, of Listed Building Consent (ref. 2018/03101/LBC) dated 25 October 2019.
-
2020/02569/DET Awaiting decision
Maisonette Ground And First Floor 71 Sulgrave Road London W6 7QH
Submission of details of preliminary risk assessment report pursuant to condition 10; site investigation scheme pursuant to condition 11; quantitative risk assessment report pursuant to condition 12; remediation method statement pursuant to condition 13; verification report pursuant to condition 14; onward long-term monitoring methodology report pursuant to condition 15 of planning permission ref: 2020/01008/FUL granted 6th August 2020.
-
2020/02562/FUL Awaiting decision
Verulam House Hammersmith Grove London W6 0NW
Installation of telecommunications equipment at roof level, including 12no. antennas and 3no. dishes located on freestanding frames, 4 no. cabinets on grillage and ancillary development including RRU's and GPS units thereto.
-
2020/02545/FUL Granted
101 - 103 Shepherd's Bush Road London W6 7LR
Change of use of existing hotel (Class C1), to hostel accommodation (Class Sui Generis), on a temporary basis until November 2023 and provision of internal link to 105 Shepherd's Bush Road (existing hotel) to combine the two properties in connection with concurrent planning application 2020/02546/FUL for temporary use as hostel accommodation.
-
2020/02539/DLBC Awaiting decision
Olympia Exhibition Centre Hammersmith Road London W14 8UX
Details for the partial discharge of condition 6 (Structural Protection and Monitoring Regime) in relation to works associated with Central Hall, Grand Hall and National Hall of Listed Building Consent (ref. 2018/03101/LBC) dated 25 October 2019.
-
2020/02546/FUL Awaiting decision
Royal Guest House 2 105 Shepherd's Bush Road London W6 7LP
Change of use of existing guest house (Class C1), to hostel accommodation (Class Sui Generis), on a temporary basis until November 2023 and provision of internal link to 101-103 Shepherd's Bush Road (existing hotel) to combine the two properties in connection with concurrent planning application 2020/02545/FUL for temporary use as hostel accommodation.
-
2020/02531/FUL Awaiting decision
23 Ellerslie Road London W12 7BN
Erection of an additional floor at roof level including the formation of a roof terrace at the front elevation; erection of a rear extension at second floor level over part of the existing back addition; erection of a single storey rear extension, to the side and rear of the existing back addition; erection of a single storey outbuilding in the rear garden; erection of a bin/cycle store in the front garden at lower ground floor level; installation of new French doors with Juliet balconies to replace the existing windows at upper ground and first floor level to the rear elevation; installation of a new window following the removal of existing door and staircase to the side elevation at upper ground floor level; replacement of existing window to new French doors to the rear of bedroom at lower ground floor level; replacement of existing window with a new window to the side of single storey back addition; conversion of existing dwellinghouse into 1 x studio, 1 x 1 bedroom, 1 x 2 bedroom and 1 x 3 bedroom self-contained flats.
-
2020/02525/ADV Awaiting decision
Walham Green Court Waterford Road London
Retention of existing advertisement structure fronting Fulham Road with alterations to existing cladding and installation of a living wall; display of existing single sided LED digital screen measuring 6m (height) x 3m (width) x 0.7m (depth) and display of existing single sided LED digital screen measuring 0.4m (height) x 0.8m (width) x 0.7m (depth).
-
2020/02511/FUL Withdrawn
150 Hamlet Gardens, London, W6 0TR
Alterations to roof to enlarge loft space between front and rear roof slopes
-
2020/02501/FUL Awaiting decision
145 Hammersmith Road London W14 0QL
Erection of an additional floor at roof level in connection with the creation of 1 x 1 bedroom self-contained flat; erection of a front extension and erection of a rear extension at third floor level, on top of the existing back addition; formation of a roof terrace at fourth floor level to the northern elevation; installation of a single terrace door to replace the existing doors at third floor level to the southern elevation; installation of a new window at third floor level to the eastern elevation; installation of new railings and gates to replace the existing at ground floor level.
-
2020/02513/NMAT Awaiting decision
Hammersmith Town Hall King Street London W6 9JU
Non-Material amendment to approved application 2018/01500/FUL to amend the triggers for Conditions 17 (Revised Drainage Strategy), 19 (Revised Flood Risk Assessment) and 32 (Ventilation Strategy) to enable below ground works ahead of formal discharge of these details. Changes to the triggers to Conditions 49 (Materials), 50 (Detailed Drawings) and 51 (Landscaping and Public Realm) to enable construction to second floor frame of the new build blocks and structural steelwork to the Town Hall and Town Hall roof extension ahead of formal discharge of these details. Amendments to the wording of Condition 11 (Archaeology) and Condition 67 (Airwaves Interference Study) to reflect the details already discharged and to clarify the remaining requirements.
- Page 1
- Page 2
Other months in 2020
- January 2020 84
- February 2020 96
- March 2020 101
- April 2020 89
- May 2020 154
- June 2020 249
- July 2020 200
- August 2020 36
- September 2020 37
- October 2020 61
- November 2020 154
- December 2020 244