Planning application
101 - 103 Shepherd's Bush Road London W6 7LR
Relates to 2020/02546/FUL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of existing hotel (Class C1), to hostel accommodation (Class Sui Generis), on a temporary basis until November 2023 and provision of internal link to 105 Shepherd's Bush Road (existing hotel) to combine the two properties in connection with concurrent planning application 2020/02546/FUL for temporary use as hostel accommodation.
As published by the council, reference 2020/02545/FUL
Application record
- Reference
- 2020/02545/FUL
- Type
- Full Detailed Planning Application
- Status
- Application Approved
- Decision
- Application Approved
- Received
- 6 Oct 2020
- Validated
- 2 Nov 2020
- Decided
- 4 Feb 2021
- Ward
- Addison
- Decision by
- Committee Decision
- Postcode
- W6 7LR
Timeline
Dates from the published record
-
6 Oct 2020
Received by Hammersmith and Fulham
-
2 Nov 2020
Validated
Checked as complete and ready for consideration.
-
4 Feb 2021
Decision issued: Application Approved
-
15 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
2020/02546/FUL Awaiting decision
Royal Guest House 2 105 Shepherd's Bush Road London W6 7LP
Change of use of existing guest house (Class C1), to hostel accommodation (Class Sui Generis), on a temporary basis until November 2023 and provision of internal link to 101-103 Shepherd's Bush Road (existing hotel) to combine the two properties in connection with concurrent planning application 2020/02545/FUL for temporary use as hostel accommodation.
1 later application on the register refers to this one:
-
2020/02546/FUL Awaiting decision
Royal Guest House 2 105 Shepherd's Bush Road London W6 7LP
Change of use of existing guest house (Class C1), to hostel accommodation (Class Sui Generis), on a temporary basis until November 2023 and provision of internal link to 101-103 Shepherd's Bush Road (existing hotel) to combine the two properties in connection with concurrent planning application 2020/02545/FUL for temporary use as hostel accommodation.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Wakefield
94 applications on PlanIndex · across 39 councils · 88% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
30 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Hammersmith and Fulham granted permission on 4 February 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Royal Guest House 2 105 Shepherd's Bush Road London W6 7LP
97% historically approved · decision due ~28 Dec
Change of use of existing guest house (Class C1), to hostel accommodation (Class Sui Generis), on a temporary basis until November 2023 and provision of internal link to 101-103 Shepherd's Bush Road (existing hotel) to combine the two properties in connection with concurrent planning application 2020/02545/FUL for temporary use as hostel accommodation.
Awaiting decision Full applications 27 docs -
Royal Guest House 2 105 Shepherd's Bush Road London W6 7LP
95% historically approved · decision due ~27 Apr
Submission of details of a preliminary risk assessment report, pursuant to Condition 11; details of a site investigation scheme, pursuant to Condition 12; details of a quantitative risk assessment report, pursuant to Condition 13; details of a remediation method statement, pursuant to Condition 14; details of a verification report confirming that the approved remediation method statement has been carried out in full, pursuant to Condition 15; and details of an onward long-term monitoring methodology report, pursuant to Condition 16 of planning permission reference: 2019/00994/FUL dated 30th August 2019.
Awaiting decision Conditions 6 docs -
92 Sterndale Road, London, W14 0HX
98% historically approved · decision due ~8 Sep
Erection of a two storey rear extension at first and second floor levels to the rear of the existing back addition; erection of a single storey rear extension at ground floor level, incorporating an internal lightwell, to the side and rear of the existing back addition; excavation of parts of the front and rear gardens to form lightwells and rear access steps in connection with the enlargement of the existing basement; installation of two air-conditioning condenser units housed within an acoustic enclosure on the roof of the enlarged back addition; erection of new boundary walls within the front garden to replace existing; installation of new timber casement windows on the side elevation at first and second floor levels; replacement of existing single-glazed timber sash windows on the front elevation with double-glazed timber sash windows; replacement of existing uPVC windows on the rear elevation with double-glazed timber sash windows; installation of a new timber front entrance door ... read more
Awaiting decision Householder Extension Windows or glazing 23 docsSmall domestic -
Bus Shelter Pavement Outside 154 Shepherd's Bush Road London W6
93% historically approved · decision due ~25 Dec
Display of double sided internally illuminated freestanding lcd digital screen panel sign measuring 2100mm (height) x 1340mm (width) to the side elevation of existing bus shelter (Amended description).
Awaiting decision Advertising 10 docs -
21 Dunsany Road, London, W14 0JP
97% historically approved · decision due ~7 Apr
G1 Olive x6 - rear garden - Reduce height by 1m and shape - Thin by approx. 20% to improve air flow.
Awaiting decision Trees 5 docs -
9 Dunsany Road London W14 0JP
95% historically approved · decision due ~21 Jan
Submission of details of preliminary risk assessment report pursuant to condition 5; site investigation scheme pursuant to condition 6 of planning permission ref: 2019/02181/FUL granted 13th September 2019.
Awaiting decision Conditions 19 docs
Other full applications
In Hammersmith and Fulham
-
P/2026/01173/FUL Granted
343 Fulham Palace Road, London, SW6 6TD
Installation of a new structure with door opening and the erection of obscure glazed screen around part of the flat roof at third floor level to the rear elevation in connection with its use as a terrace.
-
P/2026/01729/FR3 Granted
24-26 Matheson Road, London, W14 8SW
Replacement of existing vehicular entrance gates with new vehicular entrance gates and railings in between building no. 24-26 Matheson Road and no. 32 Matheson Road; installation of a pedestrian entrance gate in between building no. 24-26 Matheson Road and no. 22 Matheson Road.
-
P/2026/01645/FUL Granted
10 Cathnor Road, London, W12 9JA
Replacement of existing single glazed timber framed sash windows to the front elevation with double glazed timber framed sash windows and the existing single glazed rear elevations with new double glazed timber sash windows; and replacement of existing single glazed timber framed basement entrance door to the rear elevation with a new double glazed composite GRP door.
-
P/2026/01106/FUL Granted
44 Flat B,Studland Street,London,Hammersmith And Fulham,W6 0JS
Replacement of all existing timber framed windows at first floor level with new double glazed timber framed windows. Replacement of existing rooflight to the roof of the rear back addition.
-
P/2026/01614/FUL Granted
59A Chesson Road, London, W14 9QT
Erection of an additional floor at roof level.