Planning application

Old Oak Common Lane Between Wells House Road And Wormwood Scrubs London NW10 6DZ

Awaiting decision Hammersmith and Fulham 2026/00075/OPDOBS Observations to OPDC

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Application under Schedule 17 of the High Speed Rail LondonWest Midlands Act 2017, for works related to the replacement Great Western Mainline Bridge; a new bridge to non-preclude a potential future extension of the Chiltern Line; collision protection beam; modifications to abutments of the existing Intercity Express Programme Bridge; and associated earthworks and fencing.

As published by the council, reference 2026/00075/OPDOBS

Application record

Reference
2026/00075/OPDOBS
Type
Observations to OPDC
Status
Pending As published: REGISTERED: Pending recommendation
Received
13 Jan 2026
Validated
14 Jan 2026
Ward
College Park And Old Oak
Postcode
NW10 6DZ

Timeline

Dates from the published record

  1. 13 Jan 2026

    Received by Hammersmith and Fulham

  2. 14 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 24 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 11 March 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 79 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

1 document on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham's median decision took 79 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Hammersmith and Fulham's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles

  • Old Oak Common Rail Depot Old Oak Common Lane London NW10 6DZ

    2025/02556/OPDOBS Submitted 22 Sep 2025 50 yards away

    96% historically approved · decision due ~18 Nov

    Installation of 1no. internally illuminated fascia sign to the main entrance of the Old Oak Common Station building

    Awaiting decision
  • Heathrow Airport 3rd Runway Development

    2025/02400/OBS Submitted 3 Sep 2025 50 yards away

    96% historically approved · decision due ~31 Oct

    Application by Heathrow Airport Limited (the applicant) for an Order granting Development Consent for the Heathrow Expansion (the proposed development)

    Awaiting decision 1 doc
  • Heathrow Express Depot Old Oak Common Lane, London, NW10 6DZ

    2020/01969/OPDOBS Submitted 30 Jan 2020 50 yards away

    96% historically approved · decision due ~6 Apr

    Application under Schedule 17 of the High Speed Rail London West Midlands Act 2017 relating to works associated with the realignment of Oak Common Lane and replacement Great Western Mainline and Central Line bridges.

    Awaiting decision
  • Old Oak Common Rail Depot Old Oak Common Lane London NW10 6DZ

    2025/02948/OPDOBS Submitted 22 Oct 2025 50 yards away

    96% historically approved · decision due ~22 Dec

    Application under Schedule 17 of the High Speed Rail London to West Midlands Act 2017 for a non-material change to planning consent reference 22/0064/HS2OPDC for works associated with the urban realm for the new Old Oak Common station comprising earthworks, wetland area earthworks, retaining walls, bus canopies, fences and walls, bollards, seating, planters, cycle stands, lighting equipment, a DNO substation, hard and soft landscaping, road vehicle parks and onsite road layout. The non-material changes include amendments to approved general arrangements plans, landscape planting plans, contours and levels plans, cycle space provision and lighting details and the provision of a staff smoking shelter and security booth.

    Awaiting decision
  • Old Oak Common Rail Depot Old Oak Common Lane London NW10 6DZ

    2025/02947/OPDOBS Submitted 22 Oct 2025 50 yards away

    96% historically approved · decision due ~22 Dec

    Application under Schedule 17 of the High Speed Rail, London West Midlands Act 2017 for works to enable Old Oak Common Station to serve as a temporary terminus comprising a train crew and catering building, fencing and gates to provide a refuse compound, lighting equipment and road vehicle parks.

    Awaiting decision
  • Heathrow Express Depot Old Oak Common Lane London NW10 6DZ

    2020/00301/OPDOBS Submitted 31 Jan 2020 50 yards away

    96% historically approved · decision due ~27 Mar

    Application under Schedule 16 of the High Speed Rail London West Midlands Act 2017 relating to the onsite road layout associated with the new Old Oak Common station

    Awaiting decision 2 docs