Skip to content
PlanIndex Get alerts
Menu

Planning application

54 Wood Lane, London, W12 7RQ

Awaiting decision Hammersmith and Fulham 2024/02570/FUL Full Planning Application

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a 30 storey building (plus plant) with single storey basement for residential (C3) use with ancillary uses at the ground floor level and including associated landscaping, access, car and cycle parking and other engineering works. Please note - this application seeks a renewed consent for Phase 5 of the approved White City Living Masterplan (ref. 2023/01965/VAR).

As published by the council, reference 2024/02570/FUL

Application record

Reference
2024/02570/FUL
Type
Full Planning Application
Status
Pending As published: REGISTERED: Pending recommendation
Received
11 Oct 2024
Validated
25 Nov 2024
Ward
College Park And Old Oak
Postcode
W12 7RQ

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 12 applications since 2018: 7 approved, 0 refused.

  • 54 Wood Lane, London, W12 7RQ

    Submission of details of street furniture, bins and signage within Phase 1, in compliance with condition 2014/04726/OUT dated 16th December 2015.

    Decided 15 May 2026 Conditions
  • 54 Wood Lane, London, W12 7RQ

    Details of sample panel of external façade 1:1 scale , in compliance with condition 89 of planning permission (2023/01965/VAR) dated 21 August 2024 (as added by 2024/03125/NMAT dated 23rd January 2025).

    Decided 5 Jun 2026 Conditions
  • 54 Wood Lane, London, W12 7RQ

    Details of materials for Building 7(D1) of Phase 4, in compliance with condition 26 of planning permission (2023/01965/VAR) dated 21 August 2024.

    Decided 5 Jun 2026 Conditions
  • 2025/02735/DET Granted

    54 Wood Lane, London, W12 7RQ

    Details of Inclusive Access Management Plan (IAMP) for Phase 4, in compliance with condition 33 of planning permission 2023/01965/VAR dated 21 August 2024.

    Decided 20 Mar 2026 Conditions
  • 2020/01268/TCCH Granted

    54 Wood Lane, London, W12 7RQ

    Request to extend construction working hours temporarily to ensure safe working in line with social distancing guidelines. The site has construction hours conditioned under 2017/04377/VAR and discharged 2018/02378/DET. The site has construction hours conditioned under 2017/04377/VAR and discharged 2018/02378/DET.

    Decided 1 Jul 2020
  • 2019/02036/VAPO Awaiting decision

    54 Wood Lane London W12 7RQ

    Deed of Variation of the S106 Agreement (as already amended) pursuant to the extant planning permission ref: 2017/04377/VAR for the comprehensive redevelopment of the former M&S Warehouse site, seeking amendments to the Schedule 5 (Affordable Housing) of the Agreement including changes to the Mortgagee in Possession clauses.

    Decided 12 Jul 2019 Conditions
  • 2018/02768/RES Granted

    54 Wood Lane London W12 7RQ

    Reserved Matters Application to discharge access, appearance, landscaping, layout, and scale pursuant to Condition 1 for the land identified as Exhibition Park within the masterplan for the M&S Site redevelopment, pursuant to Outline Planning Permission ref: 2017/04377/VAR

    Decided 22 Jan 2019 Reserved matters
  • 2018/02390/DET Withdrawn

    54 Wood Lane, London, W12 7RQ

    31 (SUDS) Prior to commencement of work within the relevant Development Plot, details of a sustainable urban drainage system (SUDS) for each Development Plot shall be submitted to and approved in writing by the council. SUDS schemes shall be implemented in accordance with the approved details prior to first occupation of the relevant part of the development hereby permitted, and thereafter permanently retained and maintained unless otherwise agreed in writing with the Local Planning Authority. Details for Phase 1D (Development Plots A1, A2 and A3) have been approved pursuant to 2016/02508/DET. To ensure that surface water run-off is managed in a sustainable manner, in accordance with policy 5.13 of the London Plan (2016), policies CC1, CC2, CC4, OS1, OS4 and OS5 of the emerging Local Plan 2018 and policy CC2 of the Core Strategy 2011.

    Submitted 16 Jul 2018 Conditions
  • 2018/02395/DET Withdrawn

    54 Wood Lane, London, W12 7RQ

    75 (Internal Road and Vehicle/Pedestrian Access Points) No development (except for the approved Enabling Works and demolition) shall commence within each Development Plot until full details of the internal roads and the vehicle/pedestrian access points, including details of any street level car parking arrangements, in respect of the relevant Development Plot have been submitted and shall be implemented in accordance and thereafter retained in accordance with the approved details. Details for Phase 1D (Development Plots A1, A2 and A3) have been approved pursuant to 2016/03120/DET. To ensure there is sufficient circulation space for pedestrians, servicing and other vehicles and provide the surface level car parking to meet the needs of future site occupiers and users, in accordance with policies 6.13 and 7.2 of the London Plan (2016),policies T4 and T6 of the Emerging Local Plan 2018 and policies DM J2 and DM J4 of the Development Management Local Plan 2013 and the Council's Planni... read more

    Submitted 16 Jul 2018 Conditions
  • 2018/02379/DET Withdrawn

    54 Wood Lane, London, W12 7RQ

    19 (Construction Logistic Plan) Prior to the commencement of development within the relevant Development Plot shall commence until a Construction Logistics Management Plan for that Development Plot has been submitted to and approved in writing by the Council. The method statement /construction management plan should be prepared in consultation with London Underground which includes the details for all of the relevant foundations, basement and ground floor structures, or for any other structures below ground level, including piling (temporary and permanent).The development of the relevant Plot shall be carried out in accordance with the relevant approved Construction Logistics Management Plan unless otherwise agreed in writing with the Local Planning Authority. Each Construction Logistics Management Plan shall cover the following minimum requirements: - site logistics and operations; - construction vehicle routing; - contact details for site managers and details of management li... read more

    Submitted 13 Jul 2018 Conditions

Timeline

Dates from the published record

  1. 11 Oct 2024

    Received by Hammersmith and Fulham

  2. 25 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 2 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 20 January 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 80 days over the applications it decided in the last year.

Cases linked to this one on the register

1 later application on the register refers to this one:

  • P/2026/02553/NMAT Awaiting decision

    M&S White City Site 54 Wood Lane London W12 7RQ

    Non-material amendment to vary Condition 2 (Drawings) of planning permission ref. 2024/02570/FUL granted on 1 April 2026 for: Erection of a 30-storey building (plus plant) with single storey basement for residential (C3) use with ancillary uses at the ground floor level and including associated landscaping, access, car and cycle parking and other engineering works. The amendments relate to changes to: reconfiguration of the ground floor and basement layouts; an increase to the GEA of ancillary residential (non-residential) floorspace at ground level (7sqm) and basement level (61sqm); landscape amendments including an enlarged water feature and larger terraces; minor adjustments to the access and servicing strategy; and ground floor façade and fenestration amendments.

    Submitted 6 Oct 2026 Amendments

Documents

Plans, drawings, consultee responses and the officer's report

168 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided full applications in a median of 105 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 54 Wood Lane, London, W12 7RQ

    2018/02390/DET Submitted 16 Jul 2018 50 yards away

    31 (SUDS) Prior to commencement of work within the relevant Development Plot, details of a sustainable urban drainage system (SUDS) for each Development Plot shall be submitted to and approved in writing by the council. SUDS schemes shall be implemented in accordance with the approved details prior to first occupation of the relevant part of the development hereby permitted, and thereafter permanently retained and maintained unless otherwise agreed in writing with the Local Planning Authority. Details for Phase 1D (Development Plots A1, A2 and A3) have been approved pursuant to 2016/02508/DET. To ensure that surface water run-off is managed in a sustainable manner, in accordance with policy 5.13 of the London Plan (2016), policies CC1, CC2, CC4, OS1, OS4 and OS5 of the emerging Local Plan 2018 and policy CC2 of the Core Strategy 2011.

    Withdrawn Conditions
  • 54 Wood Lane, London, W12 7RQ

    2018/02395/DET Submitted 16 Jul 2018 50 yards away

    75 (Internal Road and Vehicle/Pedestrian Access Points) No development (except for the approved Enabling Works and demolition) shall commence within each Development Plot until full details of the internal roads and the vehicle/pedestrian access points, including details of any street level car parking arrangements, in respect of the relevant Development Plot have been submitted and shall be implemented in accordance and thereafter retained in accordance with the approved details. Details for Phase 1D (Development Plots A1, A2 and A3) have been approved pursuant to 2016/03120/DET. To ensure there is sufficient circulation space for pedestrians, servicing and other vehicles and provide the surface level car parking to meet the needs of future site occupiers and users, in accordance with policies 6.13 and 7.2 of the London Plan (2016),policies T4 and T6 of the Emerging Local Plan 2018 and policies DM J2 and DM J4 of the Development Management Local Plan 2013 and the Council's Planni... read more

    Withdrawn Conditions Demolition 9 docs
  • 54 Wood Lane, London, W12 7RQ

    2018/02379/DET Submitted 13 Jul 2018 50 yards away

    19 (Construction Logistic Plan) Prior to the commencement of development within the relevant Development Plot shall commence until a Construction Logistics Management Plan for that Development Plot has been submitted to and approved in writing by the Council. The method statement /construction management plan should be prepared in consultation with London Underground which includes the details for all of the relevant foundations, basement and ground floor structures, or for any other structures below ground level, including piling (temporary and permanent).The development of the relevant Plot shall be carried out in accordance with the relevant approved Construction Logistics Management Plan unless otherwise agreed in writing with the Local Planning Authority. Each Construction Logistics Management Plan shall cover the following minimum requirements: - site logistics and operations; - construction vehicle routing; - contact details for site managers and details of management li... read more

    Withdrawn Conditions 1 doc
  • M&S White City Site 54 Wood Lane London W12 7RQ

    P/2026/02370/DET Submitted 14 Sep 2026 50 yards away

    95% historically approved · decision due ~10 Nov

    Discharge of Condition 80 (Energy Plant Air Quality Assessment); Condition 81 (CHP and boiler NOx emissions) of Planning Permission (ref: 2023/01965/VAR) dated 21 August 2024.

    Awaiting decision Conditions 4 docs
  • M&S White City Site 54 Wood Lane London W12 7RQ

    P/2026/01578/DET Submitted 19 Jun 2026 50 yards away

    Partial discharge of Condition 34 (Sound Insulation); Condition 36 (Sound Insulation between residential and non-residential uses); Condition 37 (Enhanced Sound Insulation Value); Condition 38 (Vibration) in relation to Phase 4 of Planning Permission (ref: 2023/01965/VAR) dated 21 August 2024.

    Granted Conditions 4 docs
  • M&S White City Site 54 Wood Lane London W12 7RQ

    P/2026/01538/DET Submitted 16 Jun 2026 50 yards away

    95% historically approved · decision due ~11 Aug

    Discharge of Condition 21 (Play Equipment & Play Spaces) of Planning Permission (ref: 2023/02105/RES) dated 24 September 2024.

    Awaiting decision Conditions 4 docs

In Hammersmith and Fulham

  • 6 Flat B First And Second Floors,Hetley Road,London,Hammersmith And Fulham,W12 8BB

    Raising of parapet wall and erection of steel posts and glass balustrades around the flat roof of the two storey rear back addition at second floor level, in connection with its use as a roof terrace; installation of French doors to replace the existing sash window at second floor level to the rear elevation.

    Received 17 Mar, published by the council 24 Jul 2026 Full applications
  • P/2026/02559/FUL Awaiting decision

    34 Oaklands Grove, London, W12 0JA

    Erection of a rear roof extension, involving an increase in the ridge height by 300mm, and including the installation of French doors and a Juliet balcony; erection of a single storey rear extension, to the side and rear of the existing back addition; installation of 2no. roof lights in the front roof slope; installation of French doors and a Juliet balcony to replace existing window to the rear elevation of the existing back addition at second floor level; formation of a roof terrace to the rear elevation at first floor level, enclosing part of the flat roof of the proposed single storey rear extension with a 1.7 metre high obscured glazed screen;

    Received 6 Oct, published by the council 11 Oct 2026 Full applications
  • Flat 1 Maisonette Basement And Ground Floor, 41 Addison Gardens, London, W14 0DP

    Erection of an external staircase to the rear elevation from upper ground to lower ground floor level; and installation of a French door following the removal of an existing window, to the rear elevation at upper ground floor level.

    Received 23 Jun, published by the council 24 Jul 2026 Full applications
  • 2026/00333/FUL Granted

    Flat B First And Second Floors, 6 Hetley Road, London, W12 8BB

    Replacement of 1no existing window with new double glazed timber framed windows at second floor level to the front and rear elevations; replacement of 1no existing single window and 1no bay window comprising of 3no window glazing with new double glazed timber framed windows to the front elevation, and replacement of 1no existing window with a new double glazed timber framed window to the rear elevation at first floor level.

    Received 7 Feb, published by the council 24 Jul 2026 Full applications
  • 74 Flat Ground Floor,Townmead Road,London,Hammersmith And Fulham,SW6 2RU

    Erection of a single storey rear extension, to the side and rear of the existing back addition following the demolition of existing conservatory at the rear of the property. Replace window on main rear wall at ground floor level with glazed door and Juliet balcony.

    Received 16 Jun, published by the council 24 Jul 2026 Full applications