Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

Awaiting decision Hammersmith and Fulham 2021/00443/DET Details to Meet Conditions Full/Outline

Relates to 2020/01455/VAR

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Submission of detailed plans, sections and elevations at a scale of 1:20 of the rooftop plant and plant screening, pursuant to Condition 35 of planning permission reference: 2018/03667/FUL dated 24th October 2019 (as amended by 2020/01455/VAR dated 2nd February 2021).

As published by the council, reference 2021/00443/DET

Application record

Reference
2021/00443/DET
Type
Details to Meet Conditions Full/Outline
Status
Pending Consideration
Received
11 Feb 2021
Validated
12 Feb 2021
Ward
College Park And Old Oak
Decision by
Delegated Decision
Postcode
W12 0NN

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 4 applications since 2018: 1 approved, 0 refused.

  • 2020/01698/NMAT Awaiting decision

    Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

    Non-material amendment to planning permission ref: 2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.' Amendments to include: Removal of perforated panels from the atrium on the east elevation (including removal of beam at level 1 and mullions of atrium glazing to be re-aligned to align with glazing into reception), addition of a door to the nitrogen store on the west elevation, addition of four louvres to the doors and two additional exposed louvres in the facade (colour matched to facade) on the north elevation.

    Submitted 7 Jul 2020 Amendments
  • 2020/01455/VAR Awaiting decision

    Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

    Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met.

    Decided 6 Sep 2022 Conditions
  • 2018/03667/FUL Granted

    Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

    Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.

    Decided 24 Oct 2019 Full applications

Timeline

Dates from the published record

  1. 11 Feb 2021

    Received by Hammersmith and Fulham

  2. 12 Feb 2021

    Validated

    Checked as complete and ready for consideration.

  3. 15 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 9 April 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 80 days over the applications it decided in the last year.

Cases linked to this one on the register

  • 2020/01455/VAR Awaiting decision

    Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

    Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met.

    Decided 6 Sep 2022 Conditions

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided condition discharge and variation applications in a median of 102 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Cyclotron Building Hammersmith Hospital Du Cane Road London W12 0HS

    2020/01241/DET Submitted 20 May 2020 50 yards away

    Submission of detailed drawings of typical bays of the building (including the proposed chimneys) in plan, section and elevation at a scale of no less than 1:20, pursuant to Condition 8; details of any window cleaning equipment including appearance, means of operation and storage, pursuant to Condition 34; and the full detailed design of the proposed blue and green roofs, to include details of the substrate depth and confirmation of the attenuation volume provided, pursuant to Condition 41 of planning permission reference: 2018/03667/FUL dated 24th October 2019.

    Awaiting decision Conditions Windows or glazing 8 docs
  • Cyclotron Building Hammersmith Hospital Du Cane Road London W12 0HS

    2020/00507/DET Submitted 20 Feb 2020 50 yards away

    Submission of details and samples of the proposed fenestration, including opening style, pursuant to Condition 6; and details and samples of all materials to be used in the external faces of the building, including a sample panel erected onsite for the Council's inspection and approval prior to the commencement of the works, pursuant to Condition 7 of planning permission reference: 2018/03667/FUL dated 24th October 2019.

    Awaiting decision Conditions Windows or glazing 5 docs
  • Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

    2018/03667/FUL Submitted 23 Nov 2018 50 yards away

    Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.

    Granted Full applications 120 docs
  • Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

    2020/01698/NMAT Submitted 7 Jul 2020 50 yards away

    95% historically approved · decision due ~2 Sep

    Non-material amendment to planning permission ref: 2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.' Amendments to include: Removal of perforated panels from the atrium on the east elevation (including removal of beam at level 1 and mullions of atrium glazing to be re-aligned to align with glazing into reception), addition of a door to the nitrogen store on the west elevation, addition of four louvres to the doors and two additional exposed louvres in the facade (colour matched to facade) on the north elevation.

    Awaiting decision Amendments Windows or glazing 12 docs
  • Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

    2020/01455/VAR Submitted 10 Jun 2020 50 yards away

    Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met.

    Awaiting decision Conditions 14 docs
  • Hammersmith Hospital Du Cane Road London W12 0HS

    2021/00405/FUL Submitted 9 Feb 2021 50 yards away

    98% historically approved · decision due ~7 Apr

    Replacement of two side sections of 1no window at 7th floor level to northern elevation of the Commonwealth Building with ventilation louvres.

    Awaiting decision Full applications Windows or glazing 20 docs

In Hammersmith and Fulham

  • 50 Brook Green, London, W6 7BJ

    Submission of a Demolition Logistics Plan, pursuant to Condition 4; a Construction Logistics Plan, pursuant to Condition 5; an updated Arboricultural Impact Assessment and Tree Protection Plan, pursuant to Condition 17; details of accessible units, pursuant to Condition 23; and details of Air Quality Emissions Control of Non-Road Mobile Machinery (NRMM), pursuant to Conditions 35 and 36 of the planning permission reference: 2025/00492/VAR dated 5th May 2026.

    Received 21 May, published by the council 24 Jul 2026 Conditions
  • 574 - 580 King's Road, London, SW6 2DY

    Submission of details of a Ventilation Strategy Report, pursuant to Condition 16 of the planning permission reference: 2025/01090/FUL dated 27th November 2025.

    Received 28 May, published by the council 24 Jul 2026 Conditions
  • P/2026/02566/DET Awaiting decision

    Former Dairy Crest Site,Land Beneath And Bounded By Westway And,West London Railway Line And Adjoining,58 Wood Lane,London W12

    Details to discharge Condition 12 (temporary fencing and/or enclosure) relating to Development Zone 3 ('DZ3') of planning planning permission 2025/02724/VAR dated 9 September 2026.

    Received 6 Oct, published by the council 9 Oct 2026 Conditions
  • P/2026/02562/DET Awaiting decision

    Former Dairy Crest Site,Land Beneath And Bounded By Westway And,West London Railway Line And Adjoining,58 Wood Lane,London W12

    Details to discharge Condition 21 (Piling Method Statement) relating to Development Zone 3 ('DZ3') of planning planning permission 2025/02724/VAR dated 9 September 2026.

    Received 6 Oct, published by the council 9 Oct 2026 Conditions
  • P/2026/02563/DET Awaiting decision

    Former Dairy Crest Site,Land Beneath And Bounded By Westway And,West London Railway Line And Adjoining,58 Wood Lane,London W12

    Details to discharge Condition 10 (Construction Management Plan (CMP)) of planning planning permission 2025/02724/VAR dated 9 September 2026.

    Received 6 Oct, published by the council 9 Oct 2026 Conditions