Proposal
Submission of detailed plans, sections and elevations at a scale of 1:20 of the rooftop plant and plant screening, pursuant to Condition 35 of planning permission reference: 2018/03667/FUL dated 24th October 2019 (as amended by 2020/01455/VAR dated 2nd February 2021).
As published by the council, reference 2021/00443/DET
Application record
- Reference
- 2021/00443/DET
- Type
- Details to Meet Conditions Full/Outline
- Status
- Pending Consideration
- Received
- 11 Feb 2021
- Validated
- 12 Feb 2021
- Ward
- College Park And Old Oak
- Decision by
- Delegated Decision
- Postcode
- W12 0NN
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 3 applications since 2020.
-
2020/01698/NMAT Awaiting decision
Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
Non-material amendment to planning permission ref: 2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.' Amendments to include: Removal of perforated panels from the atrium on the east elevation (including removal of beam at level 1 and mullions of atrium glazing to be re-aligned to align with glazing into reception), addition of a door to the nitrogen store on the west elevation, addition of four louvres to the doors and two additional exposed louvres in the facade (colour matched to facade) on the north elevation.
-
2020/01455/VAR Awaiting decision
Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met.
Timeline
Dates from the published record
-
11 Feb 2021
Received by Hammersmith and Fulham
-
12 Feb 2021
Validated
Checked as complete and ready for consideration.
-
15 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 April 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
-
2020/01455/VAR Awaiting decision
Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met.
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided condition discharge and variation applications in a median of 81 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Cyclotron Building Hammersmith Hospital Du Cane Road London W12 0HS
95% historically approved · decision due ~16 Jul
Submission of detailed drawings of typical bays of the building (including the proposed chimneys) in plan, section and elevation at a scale of no less than 1:20, pursuant to Condition 8; details of any window cleaning equipment including appearance, means of operation and storage, pursuant to Condition 34; and the full detailed design of the proposed blue and green roofs, to include details of the substrate depth and confirmation of the attenuation volume provided, pursuant to Condition 41 of planning permission reference: 2018/03667/FUL dated 24th October 2019.
Awaiting decision Conditions Windows or glazing 8 docs -
Cyclotron Building Hammersmith Hospital Du Cane Road London W12 0HS
95% historically approved · decision due ~17 Apr
Submission of details and samples of the proposed fenestration, including opening style, pursuant to Condition 6; and details and samples of all materials to be used in the external faces of the building, including a sample panel erected onsite for the Council's inspection and approval prior to the commencement of the works, pursuant to Condition 7 of planning permission reference: 2018/03667/FUL dated 24th October 2019.
Awaiting decision Conditions Windows or glazing 5 docs -
Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
94% historically approved · decision due ~2 Sep
Non-material amendment to planning permission ref: 2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.' Amendments to include: Removal of perforated panels from the atrium on the east elevation (including removal of beam at level 1 and mullions of atrium glazing to be re-aligned to align with glazing into reception), addition of a door to the nitrogen store on the west elevation, addition of four louvres to the doors and two additional exposed louvres in the facade (colour matched to facade) on the north elevation.
Awaiting decision Amendments Windows or glazing 12 docs -
Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
95% historically approved · decision due ~11 Aug
Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met.
Awaiting decision Conditions 14 docs -
Hammersmith Hospital Du Cane Road London W12 0HS
97% historically approved · decision due ~7 Apr
Replacement of two side sections of 1no window at 7th floor level to northern elevation of the Commonwealth Building with ventilation louvres.
Awaiting decision Full applications Windows or glazing 20 docs -
Hammersmith Hospital Du Cane Road, London, W12 0HS
97% historically approved · decision due ~9 Sep
Installation of low-carbon energy infrastructure and associated decarbonisation works across the Hammersmith Hospital campus, including the erection of packaged plantrooms and substations; installation of heat pumps and associated acoustic enclosures; construction of roof-level plant decks, access structures and service bridges; installation, replacement and upgrading of rooftop plant, roof insulation and associated mechanical and electrical equipment; associated structural works, service connections, cable routes and all other ancillary works.
Awaiting decision Full applications 40 docs
Other condition discharge and variation applications
In Hammersmith and Fulham
-
P/2026/01837/DLBC Granted
25 St Peter'S Square, London, W6 9NW
Submission of details of Full details, including photographs of physical samples, of materials to be used on the external surfaces of the building, boundary walls and ground surfaces pursuant to condition 3 of planning application ref: 2025/02038/LBC granted 2nd July 2026.
-
P/2026/01565/DET Granted
517-523 Fulham Road, London, SW6 1HD
Submission of details pursuant to Condition 7 (Anti-Vibration) of the planning permission reference: 2024/02201/FUL dated 24th September 2025.
-
P/2026/01717/DET Granted
3 Shortlands, London, W6 8DA
Submission of details of secured by design pursuant to condition 31 of planning permission ref: 2025/01723/FUL granted 1st July 2026.
-
P/2026/01708/DET Granted
11 Farm Lane, London, SW6 1PU
Submission of details of a post installation compliance report of the approved ventilation strategy, pursuant to Condition 17 of the planning permission reference: 2022/03329/FR3 dated 19th July 2023.
-
P/2026/01604/DET Granted
20 Avonmore Road, London, W14 8RR
Submission of details on the use of tall plant/scaffolding, in consultation with TFL Infrastructure Protection, pursuant to Condition 19 of planning permission reference: 2024/01752/FUL dated 10th December 2025.