Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat First Floor 45 Gunterstone Road London W14 9BS

Awaiting decision Hammersmith and Fulham 2021/00096/FUL Full Detailed Planning Application

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement of existing metal sash windows to the rear elevation at first floor level with double-glazed white-painted timber sash windows.

As published by the council, reference 2021/00096/FUL

Application record

Reference
2021/00096/FUL
Type
Full Detailed Planning Application
Status
Pending Consideration
Received
13 Jan 2021
Validated
21 Jan 2021
Ward
Avonmore
Decision by
Delegated Decision
Postcode
W14 9BS

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 2 applications since 2020: 1 approved, 0 refused.

  • 2020/02042/FUL Granted

    Flat First Floor 45 Gunterstone Road London W14 9BS

    Replacement of 2no. existing aluminium sash windows and an aluminium set of French doors to the front elevation at first floor level with timber sash windows and French doors.

    Decided 15 Feb 2021 Full applications

Timeline

Dates from the published record

  1. 13 Jan 2021

    Received by Hammersmith and Fulham

  2. 21 Jan 2021

    Validated

    Checked as complete and ready for consideration.

  3. 15 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 18 March 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

25 documents on file for this application

  • DELEGATED REPORT TEMPLATE - LIVE Report · 18 Mar 2021
  • PER.FULL PLANNING PERMISSION Decision · 18 Mar 2021
  • ACKNOWLEDGEMENT VALID APPLICATION Correspondence · 21 Jan 2021
  • ACKNOWLEDGEMENT VALID APPLICATION Correspondence · 21 Jan 2021
  • INVALID LETTER PLANNING APPLICATIONS Correspondence · 20 Jan 2021
  • INVALID LETTER PLANNING APPLICATIONS Correspondence · 20 Jan 2021
  • PROPOSAL Drawing · 20 Jan 2021
  • 45 GUNTERSTONE REAR WINDOWS Drawing · 20 Jan 2021
  • 45 GUNTERSTONE REAR ELEVATIONS Drawing · 20 Jan 2021
  • 45 GUNTERSTONE REAR PHOTOS Drawing · 20 Jan 2021
  • 45 GUNTERSTONE RD PLAN Drawing · 20 Jan 2021
  • 45 GUNTERSTONE LOCATION PLAN Drawing · 20 Jan 2021
  • ATTACHMENTSUMMARY Drawing · 20 Jan 2021
  • FEECALCULATION Drawing · 20 Jan 2021
  • APPLICATIONFORMREDACTED Drawing · 20 Jan 2021
  • INVALID LETTER PLANNING APPLICATIONS Correspondence · 19 Jan 2021
  • INVALID LETTER PLANNING APPLICATIONS Correspondence · 19 Jan 2021
  • INVALID LETTER PLANNING APPLICATIONS Correspondence · 18 Jan 2021
  • INVALID LETTER PLANNING APPLICATIONS Correspondence · 18 Jan 2021
  • 45 GUNTERSTONE REAR WINDOWS Drawing · 13 Jan 2021
  • 45 GUNTERSTONE REAR ELEVATIONS Drawing · 13 Jan 2021
  • 45 GUNTERSTONE REAR PHOTOS Drawing · 13 Jan 2021
  • 45 GUNTERSTONE RD PLAN Drawing · 13 Jan 2021
  • 45 GUNTERSTONE LOCATION PLAN Drawing · 13 Jan 2021
  • APPLICATIONFORMREDACTED Application Form · 13 Jan 2021

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided full applications in a median of 88 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Flat First Floor 45 Gunterstone Road London W14 9BS

    2020/02042/FUL Submitted 7 Aug 2020 0m away

    Replacement of 2no. existing aluminium sash windows and an aluminium set of French doors to the front elevation at first floor level with timber sash windows and French doors.

    Granted Full applications Windows or glazing 39 docs
  • 57 Gunterstone Road London W14 9BS

    2020/03422/TPO Submitted 21 Dec 2020 38m away

    97% historically approved · decision due ~16 Feb

    Pruning of an Ash tree (T37) in the rear garden, subject to Tree Preservation Order TPO/25/9/70, by reducing the height and spread of the tree by up to 3 metres; pruning back to near previous points, retaining suitable growth and minimising size of cuts; reduction due to stem decay, and high risk target area.

    Awaiting decision Trees 6 docs
  • 3 Trevanion Road, London, W14 9BJ

    P/2026/00811/TREE Submitted 20 Mar 2026 49m away

    97% historically approved · decision due ~18 Jun

    #Mimosa T2 - rear garden - Trimming of tree by up to 3m on all aspects. #Strawberry T3 -front garden - Trimming of tree by up to 3m on all aspects. The last trimming was done in 2023 and the tree has grown larger and are now overhanging street signs.

    Awaiting decision Trees 3 docs
  • Flat A First And Second Floors, 96 Edith Road, London, W14 9AP

    2025/02219/FUL Submitted 14 Aug 2025 66m away

    Erection of a rear roof extension, including installation of French doors and a Juliet balcony; installation of 3no. rooflights to the front roofslope; formation of a roof terrace at second floor level, enclosed with a 1700mm high brick balustrade and obscured glazed screen; installation of a door to replace existing window to the rear elevation at second floor level to provide access to the proposed roof terrace.

    Granted Full applications Extension Loft or dormer +1 23 docs
  • 75 Edith Road, London, W14 0TH

    P/2026/01615/TREE Submitted 24 Jun 2026 67m away

    97% historically approved · decision due ~20 Aug

    T1 - Lime - front garden - prune back to previous points to create a uniform shape & manageable size.

    Awaiting decision Trees 3 docs
  • 81 Edith Road, London, W14 0TJ

    P/2026/01157/FUL Submitted 29 Apr 2026 71m away

    97% historically approved · decision due ~27 Jul

    Replacement of existing single glazed timber framed sash windows with new double glazed timber framed sash windows; replacement of existing single glazed timber framed front door with new double glazed timber framed front door; replacement of existing single glazed timber framed rear doors with new double glazed timber framed rear doors.

    Awaiting decision Full applications Windows or glazing 20 docs

In Hammersmith and Fulham

  • 343 Fulham Palace Road, London, SW6 6TD

    Installation of a new structure with door opening and the erection of obscure glazed screen around part of the flat roof at third floor level to the rear elevation in connection with its use as a terrace.

    30 Apr 2026 Full applications
  • 24-26 Matheson Road, London, W14 8SW

    Replacement of existing vehicular entrance gates with new vehicular entrance gates and railings in between building no. 24-26 Matheson Road and no. 32 Matheson Road; installation of a pedestrian entrance gate in between building no. 24-26 Matheson Road and no. 22 Matheson Road.

    15 Jun 2026 Full applications
  • 10 Cathnor Road, London, W12 9JA

    Replacement of existing single glazed timber framed sash windows to the front elevation with double glazed timber framed sash windows and the existing single glazed rear elevations with new double glazed timber sash windows; and replacement of existing single glazed timber framed basement entrance door to the rear elevation with a new double glazed composite GRP door.

    26 Jun 2026 Full applications
  • 44 Flat B,Studland Street,London,Hammersmith And Fulham,W6 0JS

    Replacement of all existing timber framed windows at first floor level with new double glazed timber framed windows. Replacement of existing rooflight to the roof of the rear back addition.

    24 Apr 2026 Full applications
  • 59A Chesson Road, London, W14 9QT

    Erection of an additional floor at roof level.

    24 Jun 2026 Full applications