Chelsea Harbour Design Centre Harbour Avenue Chelsea Harbour London

Awaiting decision Hammersmith and Fulham 2020/03435/FUL Full Detailed Planning Application

Works: Roofing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Replacement of existing roof covering with new liquid applied system roof covering.

As published by the council, reference 2020/03435/FUL

Application record

Reference
2020/03435/FUL
Type
Full Detailed Planning Application
Status
Pending Consideration
Received
22 Dec 2020
Validated
23 Dec 2020
Ward
Sands End
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 22 Dec 2020

    Received by Hammersmith and Fulham

  2. 23 Dec 2020

    Validated

    Checked as complete and ready for consideration.

  3. 15 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 17 February 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 79 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

1,721 applications on PlanIndex · across 171 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Hammersmith and Fulham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Chelsea Harbour Design Centre Harbour Avenue, Chelsea Harbour, London,SW10 0XE

    P/2026/02207/NMAT Submitted 25 Aug 2026 6m away

    94% historically approved · decision due ~27 Oct

    Non-material amendment to planning permission ref: 2012/00843/VAR granted 10th April 2012 for the 'Variation of Conditions: 2 (approved drawings); 5 (landscaping); 7 (acoustic screening) and 12 (construction and green roof) of Planning Permission 2008/03034/FUL, granted 2nd June 2010.' Amendments sought to include: omission of the showroom units proposed in the space known as 'the Avenue', which is currently used as circulation space comprising of the following - Proposed Ground Floor - Omission of Unit G33, Unit G34, Unit G35, Unit G36, Unit G37; Proposed First Floor - Omission of Unit 133, Unit 134, Unit 135A, Unit 135B, Unit 136, Unit 137, Unit 138, Unit 139 and Unit 140; Proposed Second Floor - Omission of Unit 236, Unit 238, Unit 239, Unit 240, Unit 241, Unit 242, Unit 243, Unit 244; Proposed Third Floor - Omission of Unit 332, Unit 333, Unit 334, Unit 335, Unit 336 and Unit 337.

    Awaiting decision Amendments 4 docs
    Major scheme
  • The Chambers Chelsea Harbour Drive Chelsea Harbour London SW100XF

    2002/02576/FUL Submitted 1 Nov 2002 43m away

    Erection of an infill extension at ground floor level to the Chambers building for Class A2 use.

    Granted Full applications Extension
  • Imperial Wharf Station Townmead Road London SW6 2ZH

    2020/01251/CLP Submitted 21 May 2020 80m away

    Formation of a new entrance leading to Platform 2 at Imperial Wharf Station together with the addition of a new Gating Shelter at the new entrance.

    Granted Lawful development 28 docs
  • Land Bounded by Imperial Road and Fulham Gasworks and Railway Line and Imperial Wharf J2 Imperial Road SW6

    2011/4291 Submitted 3 Oct 2011 98m away

    Mixed use development of the site

    Withdrawn Other 3 docs
  • Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    2021/00161/DET Submitted 19 Jan 2021 107m away

    95% historically approved · decision due ~17 Mar

    Details of operational hours, in compliance with Condition 54 for Unit 9 of Countess House (Block B) of planning permission 2011/01472/COMB granted 27 March 2012 and subsequent variation permissions 2012/04253/VAR granted 26 February 2013 and 2016/00765/VAR granted 29 July 2016.

    Awaiting decision Conditions 8 docs
  • Land Bounded By Imperial Road And Fulham Gasworks And Railway Line And Imperial Wharf J2 (Chelsea Creek) Imperial Road London SW6

    2019/03327/NMAT Submitted 7 Nov 2019 109m away

    94% historically approved · decision due ~3 Jan

    Non-Material Amendments to vary the wording of conditions attached to Planning Permission (Ref: 2011/01472/COMB dated 27 March 2012, as amended by 2016/00765/VAR dated 31 March 2017); comprising changes to the submission of pre-commencement details; in respect to the following conditions: Nos: 14 and 15

    Awaiting decision Amendments 4 docs

In Hammersmith and Fulham

  • 44 Flat B,Studland Street,London,Hammersmith And Fulham,W6 0JS

    Replacement of all existing timber framed windows at first floor level with new double glazed timber framed windows. Replacement of existing rooflight to the roof of the rear back addition.

    24 Apr 2026 Full applications
  • 59A Chesson Road, London, W14 9QT

    Erection of an additional floor at roof level.

    24 Jun 2026 Full applications
  • P/2026/01493/HH Granted

    Flat C Top Floor, 1 Hartismere Road, London, SW6 7TS

    Erection of a rear extension at second floor level, on top of the existing two storey back addition.

    10 Jun 2026 Full applications
  • 2025/03373/FUL Granted

    51 Percy Road, London, W12 9PX

    Erection of a rear roof extension; erection of a rear extension at second floor level, over remaining part of existing back addition; erection of a 1.7 metre high opaque glazed screen around the flat roof at third floor level of the existing back addition and proposed second floor rear extension, in connection with its use as a roof terrace; installation of a dormer to house a door replacing the existing window to the rear elevation at third floor level, to provide access to the proposed roof terrace; installation of window to the side elevation at second floor level; and installation of 2no. rooflights in the front roofslope.

    4 Dec 2025 Full applications
  • P/2026/02202/FUL Awaiting decision

    5 Raynham Road, London, W6 0HY

    Demolition and re-building of existing conservatory comprising of timber framed structure and new glazing.

    24 Aug 2026 Full applications