Skip to content
PlanIndex Get alerts
Menu

Planning application

96, 98, 100 And 102 Wandsworth Bridge Road London SW6 2TF

Awaiting decision Hammersmith and Fulham 2020/03250/DET Details to Meet Conditions Full/Outline

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Submission of details of a Ventilation Strategy Report to mitigate the impact of existing poor air quality, pursuant to Condition 17 of planning permission reference: 2020/02127/FUL dated 5th November 2020.

As published by the council, reference 2020/03250/DET

Application record

Reference
2020/03250/DET
Type
Details to Meet Conditions Full/Outline
Status
Pending Consideration
Received
7 Dec 2020
Validated
8 Dec 2020
Ward
Parsons Green And Walham
Decision by
Delegated Decision
Postcode
SW6 2TF

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 3 applications since 2020: 1 approved, 0 refused.

  • 2025/01505/DET Awaiting decision

    96, 98, 100 And 102 Wandsworth Bridge Road London SW6 2TF

    Submission of details of a post installation report of the approved ventilation strategy as required by Condition 1 to mitigate the impact of existing poor air quality, pursuant to Condition 18 of planning permission reference: 2020/02127/FUL dated 5th November 2020.

    Submitted 30 May 2025 Conditions
  • 2020/01551/NMAT Granted

    96, 98, 100 And 102 Wandsworth Bridge Road London SW6 2TF

    Non-material amendment to planning permission reference: 2015/05609/FUL dated 25th January 2016. for the "Excavation of the existing basements to the rear of No's 98 and 100, change of use to the rear ground and rear part of the basement of No's 98 and 100 from Class A1 retail and A2 financial services to 2 x 2 bedroom self-contained flats; erection of side infill extension to No 102 at ground floor level; rear extension at ground floor level to No 98; enlargement of existing front lightwells to 96, 98, 100 and 102; alterations to shopfronts including a new entrance doors to No's 96 and 98." Amendments sought are alterations to the entrance door locations to the new flats at 98b and 100b WBR so they are from the shared residential lobby of 100a WBR; and slight alterations to the external entrance door, to what was the previous entrance door to 98b flat, to a solid door with small locations for louvres at high and low level to accommodate gas meters for the new dwellings which have been installed to the front of the retail unit

    Decided 17 Jul 2020 Amendments

Timeline

Dates from the published record

  1. 7 Dec 2020

    Received by Hammersmith and Fulham

  2. 8 Dec 2020

    Validated

    Checked as complete and ready for consideration.

  3. 15 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 2 February 2021, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 80 days over the applications it decided in the last year.

Cases linked to this one on the register

  • Application: 2020/02127/FUL (Application Approved)

Who's behind it

Company information only, from the register and Companies House

AU Architects Ltd Agent, an architecture practice

27 applications on PlanIndex · across 3 councils · 100% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

23 documents on file for this application

  • APPENDIX 3.2 Report · 08 Jun 2021
  • APPENDIX 3.2 Report · 08 Jun 2021
  • APPENDIX 3.2 Report · 08 Jun 2021
  • APPENDIX 3.1 Report · 08 Jun 2021
  • APPENDIX 3.1 3017-M300 REV C1BASEMENT VENTILATION Report · 08 Jun 2021
  • APPENDIX 3.1 Report · 08 Jun 2021
  • EXTRACT AIR FOR LIGHTWELLS 98B AND 100B Report · 08 Jun 2021
  • EXTRACT AIR FOR LIGHTWELLS ELEVATION Report · 08 Jun 2021
  • VENTILATION STRATEGY Report · 08 Jun 2021
  • PER. DETAILS TO MEET COND. FULL/OUT APP. Decision · 08 Jun 2021
  • DELEGATED OFFICER REPORT Report · 08 Jun 2021
  • APPENDIX 3.1 Report · 11 May 2021
  • FRESH AIR INTAKE & BOILER FLUE ELEVATION Drawing · 11 May 2021
  • ACKNOWLEDGEMENT VALID APPLICATION Correspondence · 10 Dec 2020
  • CONSULTEE ACCESS ALERT E-MAIL - INTERNAL Correspondence · 10 Dec 2020
  • CONSULTEE ACCESS ALERT E-MAIL - INTERNAL Correspondence · 10 Dec 2020
  • ACKNOWLEDGEMENT VALID APPLICATION Correspondence · 10 Dec 2020
  • APPENDIX 3.1 - 3017-M300-C2 BASEMENT VENTILATION Drawing · 07 Dec 2020
  • APPENDIX 3.2 - MRXBOX-ECO2 (MVHR) Drawing · 07 Dec 2020
  • APPENDIX 3.1 - 3017-M301-C3 GROUND FLOOR VENTILATION Drawing · 07 Dec 2020
  • APPENDIX 3.2 - IAQ-BOX (CARBON FILTER) Drawing · 07 Dec 2020
  • 201204-3017-98B_100B WBR-VENTILATION STRATEGY ISSUE 02 Drawing · 07 Dec 2020
  • APPLICATIONFORMREDACTED Application Form · 07 Dec 2020

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided condition discharge and variation applications in a median of 102 days. More in our guide to how long planning decisions take.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 96, 98, 100 And 102 Wandsworth Bridge Road London SW6 2TF

    2020/01551/NMAT Submitted 18 Jun 2020 50 yards away

    Non-material amendment to planning permission reference: 2015/05609/FUL dated 25th January 2016. for the "Excavation of the existing basements to the rear of No's 98 and 100, change of use to the rear ground and rear part of the basement of No's 98 and 100 from Class A1 retail and A2 financial services to 2 x 2 bedroom self-contained flats; erection of side infill extension to No 102 at ground floor level; rear extension at ground floor level to No 98; enlargement of existing front lightwells to 96, 98, 100 and 102; alterations to shopfronts including a new entrance doors to No's 96 and 98." Amendments sought are alterations to the entrance door locations to the new flats at 98b and 100b WBR so they are from the shared residential lobby of 100a WBR; and slight alterations to the external entrance door, to what was the previous entrance door to 98b flat, to a solid door with small locations for louvres at high and low level to accommodate gas meters for the new dwellings which have been installed to the front of the retail unit

    Granted Amendments New dwelling Extension 18 docs
  • Maisonette First And Second Floors 100 Wandsworth Bridge Road London SW6 2TF

    2020/01444/DET Submitted 9 Jun 2020 50 yards away

    Submission of details of cycle parking pursuant to condition 7; refuse storage pursuant to condition 8; postal address pursuant to condition 11; parking permit scheme pursuant to condition 13; sample of obscure glazed screen pursuant to condition 17 of planning permission ref: 2017/02679/FUL granted 5th September 2017.

    Awaiting decision Conditions Windows or glazing 13 docs
  • Flat C Second And Third Floors 102 Wandsworth Bridge Road London SW6 2TF

    2019/01683/FUL Submitted 3 Jun 2019 50 yards away

    Erection of a 1.7 metre high obscured glazed privacy screen around part of the flat roof of the three storey back addition at second floor level, in connection with its use as a roof terrace; installation of French doors to replace a window to the rear elevation at second floor level, to provide access to the proposed roof terrace.

    Withdrawn Full applications Windows or glazing 13 docs
  • 96, 98, 100 And 102 Wandsworth Bridge Road London SW6 2TF

    2025/01505/DET Submitted 30 May 2025 50 yards away

    95% historically approved · decision due ~30 Jul

    Submission of details of a post installation report of the approved ventilation strategy as required by Condition 1 to mitigate the impact of existing poor air quality, pursuant to Condition 18 of planning permission reference: 2020/02127/FUL dated 5th November 2020.

    Awaiting decision Conditions 5 docs
  • 104 Wandsworth Bridge Road London SW6 2TF

    2019/01260/FUL Submitted 26 Apr 2019 50 yards away

    Change of use of part of the basement and ground floor level from retail (Class A1) into a one bedroom self-contained flat (Class C3); erection of a single storey rear extension, to the side and rear of the existing back addition; installation of a new window to the side of single storey back addition; installation of a new shopfront comprising of new doors and glazing; installation of front pavement lights; alterations to the rear lightwell to include the installation of new doors to replace the existing window; formation of refuse and cycle storage at the rear of the property.

    Granted Full applications Extension Windows or glazing 42 docs
    Small domestic
  • 104 Wandsworth Bridge Road London SW6 2TF

    2021/00146/FUL Submitted 19 Jan 2021 50 yards away

    98% historically approved · decision due ~23 Mar

    Retention of a single storey conservatory extension at ground floor level to the rear elevation.

    Awaiting decision Full applications Extension 39 docs
    Small domestic

In Hammersmith and Fulham

  • 50 Brook Green, London, W6 7BJ

    Submission of a Demolition Logistics Plan, pursuant to Condition 4; a Construction Logistics Plan, pursuant to Condition 5; an updated Arboricultural Impact Assessment and Tree Protection Plan, pursuant to Condition 17; details of accessible units, pursuant to Condition 23; and details of Air Quality Emissions Control of Non-Road Mobile Machinery (NRMM), pursuant to Conditions 35 and 36 of the planning permission reference: 2025/00492/VAR dated 5th May 2026.

    Received 21 May, published by the council 24 Jul 2026 Conditions
  • 574 - 580 King's Road, London, SW6 2DY

    Submission of details of a Ventilation Strategy Report, pursuant to Condition 16 of the planning permission reference: 2025/01090/FUL dated 27th November 2025.

    Received 28 May, published by the council 24 Jul 2026 Conditions
  • P/2026/02566/DET Awaiting decision

    Former Dairy Crest Site,Land Beneath And Bounded By Westway And,West London Railway Line And Adjoining,58 Wood Lane,London W12

    Details to discharge Condition 12 (temporary fencing and/or enclosure) relating to Development Zone 3 ('DZ3') of planning planning permission 2025/02724/VAR dated 9 September 2026.

    Received 6 Oct, published by the council 9 Oct 2026 Conditions
  • P/2026/02562/DET Awaiting decision

    Former Dairy Crest Site,Land Beneath And Bounded By Westway And,West London Railway Line And Adjoining,58 Wood Lane,London W12

    Details to discharge Condition 21 (Piling Method Statement) relating to Development Zone 3 ('DZ3') of planning planning permission 2025/02724/VAR dated 9 September 2026.

    Received 6 Oct, published by the council 9 Oct 2026 Conditions
  • P/2026/02563/DET Awaiting decision

    Former Dairy Crest Site,Land Beneath And Bounded By Westway And,West London Railway Line And Adjoining,58 Wood Lane,London W12

    Details to discharge Condition 10 (Construction Management Plan (CMP)) of planning planning permission 2025/02724/VAR dated 9 September 2026.

    Received 6 Oct, published by the council 9 Oct 2026 Conditions