Skip to content
PlanIndex Get alerts
Menu

Planning application

Royal Guest House 2 105 Shepherd's Bush Road London W6 7LP

Granted Hammersmith and Fulham 2019/00994/FUL Full Detailed Planning Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from a hotel (Class C1) into a large House in Multiple Occupation (Sui Generis) comprising 12no. bedrooms.

As published by the council, reference 2019/00994/FUL

Application record

Reference
2019/00994/FUL
Type
Full Detailed Planning Application
Status
Application Approved
Decision
Application Approved
Received
4 Apr 2019
Validated
4 Apr 2019
Decided
30 Aug 2019
Ward
Addison
Decision by
Delegated Decision
Postcode
W6 7LP

Site history

Applications at this address on the Hammersmith and Fulham register

This site has had 3 applications since 2019: 1 approved, 0 refused.

  • 2020/02546/FUL Awaiting decision

    Royal Guest House 2 105 Shepherd's Bush Road London W6 7LP

    Change of use of existing guest house (Class C1), to hostel accommodation (Class Sui Generis), on a temporary basis until November 2023 and provision of internal link to 101-103 Shepherd's Bush Road (existing hotel) to combine the two properties in connection with concurrent planning application 2020/02545/FUL for temporary use as hostel accommodation.

    Submitted 6 Oct 2020 Full applications
  • 2020/00604/DET Awaiting decision

    Royal Guest House 2 105 Shepherd's Bush Road London W6 7LP

    Submission of details of a preliminary risk assessment report, pursuant to Condition 11; details of a site investigation scheme, pursuant to Condition 12; details of a quantitative risk assessment report, pursuant to Condition 13; details of a remediation method statement, pursuant to Condition 14; details of a verification report confirming that the approved remediation method statement has been carried out in full, pursuant to Condition 15; and details of an onward long-term monitoring methodology report, pursuant to Condition 16 of planning permission reference: 2019/00994/FUL dated 30th August 2019.

    Submitted 28 Feb 2020 Conditions

Timeline

Dates from the published record

  1. 4 Apr 2019

    Received by Hammersmith and Fulham

  2. 30 Aug 2019

    Decision issued: Application Approved

  3. 11 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Planning Insight Ltd Agent, a planning consultancy registered in London

Active · incorporated 2009 · London

122 applications on PlanIndex · across 41 councils · 76% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

31 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Hammersmith and Fulham granted permission on 30 August 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Royal Guest House 2 105 Shepherd's Bush Road London W6 7LP

    2020/02546/FUL Submitted 6 Oct 2020 1m away

    98% historically approved · decision due ~28 Dec

    Change of use of existing guest house (Class C1), to hostel accommodation (Class Sui Generis), on a temporary basis until November 2023 and provision of internal link to 101-103 Shepherd's Bush Road (existing hotel) to combine the two properties in connection with concurrent planning application 2020/02545/FUL for temporary use as hostel accommodation.

    Awaiting decision Full applications 27 docs
  • Royal Guest House 2 105 Shepherd's Bush Road London W6 7LP

    2020/00604/DET Submitted 28 Feb 2020 1m away

    95% historically approved · decision due ~27 Apr

    Submission of details of a preliminary risk assessment report, pursuant to Condition 11; details of a site investigation scheme, pursuant to Condition 12; details of a quantitative risk assessment report, pursuant to Condition 13; details of a remediation method statement, pursuant to Condition 14; details of a verification report confirming that the approved remediation method statement has been carried out in full, pursuant to Condition 15; and details of an onward long-term monitoring methodology report, pursuant to Condition 16 of planning permission reference: 2019/00994/FUL dated 30th August 2019.

    Awaiting decision Conditions 6 docs
  • 101 - 103 Shepherd's Bush Road London W6 7LR

    2020/02545/FUL Submitted 6 Oct 2020 8m away

    Change of use of existing hotel (Class C1), to hostel accommodation (Class Sui Generis), on a temporary basis until November 2023 and provision of internal link to 105 Shepherd's Bush Road (existing hotel) to combine the two properties in connection with concurrent planning application 2020/02546/FUL for temporary use as hostel accommodation.

    Granted Full applications 30 docs
  • Bus Shelter Pavement Outside 154 Shepherd's Bush Road London W6

    2024/02719/ADV Submitted 25 Oct 2024 46m away

    93% historically approved · decision due ~25 Dec

    Display of double sided internally illuminated freestanding lcd digital screen panel sign measuring 2100mm (height) x 1340mm (width) to the side elevation of existing bus shelter (Amended description).

    Awaiting decision Advertising 10 docs
  • Post Office 146 Shepherd's Bush Road London W6 7PB

    2019/02865/CLE Submitted 29 Sep 2019 49m away

    90% historically approved · decision due ~25 Nov

    Continued use of the lower ground floor level as a prayer hall (Class D1).

    Awaiting decision Lawful development 12 docs
  • 92 Sterndale Road, London, W14 0HX

    P/2026/01594/HH Submitted 19 Jun 2026 51m away

    98% historically approved · decision due ~8 Sep

    Erection of a two storey rear extension at first and second floor levels to the rear of the existing back addition; erection of a single storey rear extension at ground floor level, incorporating an internal lightwell, to the side and rear of the existing back addition; excavation of parts of the front and rear gardens to form lightwells and rear access steps in connection with the enlargement of the existing basement; installation of two air-conditioning condenser units housed within an acoustic enclosure on the roof of the enlarged back addition; erection of new boundary walls within the front garden to replace existing; installation of new timber casement windows on the side elevation at first and second floor levels; replacement of existing single-glazed timber sash windows on the front elevation with double-glazed timber sash windows; replacement of existing uPVC windows on the rear elevation with double-glazed timber sash windows; installation of a new timber front entrance door ... read more

    Awaiting decision Householder Extension Windows or glazing 23 docs
    Small domestic

In Hammersmith and Fulham

  • P/2026/02334/FUL Awaiting decision

    169-175 Nazareth House, Hammersmith Road, London, W6 8DB

    Erection of 3no bollards, replacement of 1no window with a door and formation of an access ramp with handrails, installation of dropped kerb and formation of zebra crossing to eastern elevation of the building.

    9 Sep 2026 Full applications
  • 2026/00056/FUL Granted

    Chiswick Nursing Centre Ravenscourt Gardens, London, W6 0AE

    Replacement of existing windows and doors with new double glazed Aluminium windows and doors.

    11 Jan 2026 Full applications
  • Areen House, 282 King Street, London, W6 0SJ

    Installation of double glazed aluminium framed windows to replace all existing, and soot wash all brick walls in dark rustic colour; replacement of garage door to match existing to the east elevation; installation of double glazed aluminium framed entrance door and side window panels to replace existing, and erection of a glazed canopy above the entrance door to the south elevation; works to external surfaced areas and associated alterations.

    24 Mar 2026 Full applications
  • 117 Hazlebury Road, London, SW6 2LX

    Replacement of existing single glazed timber framed windows and an existing single glazed timber framed door with new double glazed timber framed windows and a double glazed timber framed door to the front elevation; replacement of existing single glazed timber framed windows and existing double glazed uPVC framed windows with new double glazed uPVC framed windows to the rear elevation; replacement of existing uPVC framed double glazed doors to the rear elevation and to the side of rear back addition with new double glazed uPVC framed doors.

    10 Jul 2026 Full applications
  • 121 Hazlebury Road, London, SW6 2LX

    Replacement of existing single glazed timber framed windows and an existing single glazed timber framed door with new double glazed timber framed windows and a double glazed timber framed door to the front elevation; replacement of existing single glazed timber framed windows and existing double glazed uPVC framed windows with new double glazed uPVC framed windows to the rear elevation; replacement of existing timber and uPVC framed double glazed doors to the rear elevation and to the side of rear back addition with new double glazed uPVC framed doors.

    10 Jul 2026 Full applications