Outside John Betts House Rylett Road London W12 9NJ

Awaiting decision Hammersmith and Fulham 2020/01852/TEL56 Telecommunication Prior Approval 56 Day

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Installation of a freestanding 18m Phase 8 Monopole with wraparound base cabinet, installation of 3no equipment cabinets and associated ancillary works.

As published by the council, reference 2020/01852/TEL56

Application record

Reference
2020/01852/TEL56
Type
Telecommunication Prior Approval 56 Day
Status
Pending Consideration
Received
20 Jul 2020
Validated
20 Jul 2020
Ward
Ravenscourt Park
Decision by
Delegated Decision
Postcode
W12 9NJ

Timeline

Dates from the published record

  1. 20 Jul 2020

    Received by Hammersmith and Fulham

  2. 22 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 14 September 2020, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 79 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, a telecoms contractor registered in Warrington

943 applications on PlanIndex · across 152 councils · 70% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Hammersmith and Fulham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

In Hammersmith and Fulham

  • 2021/00222/TEL56 Awaiting decision

    Telephone Exchange 32 - 36 Peterborough Road London SW6 3BN

    Removal of the redundant existing steelwork from the rooftop, relocation of 10no existing antenna and 2no existing 0.3m dish antenna from the existing steelwork onto the new steelwork design, installation of 6no antennas, 2no 0.3m dish antenna and 1no GPS Module, a new hooped CAT access ladder to the new support system, a new GRP access platform located next to 1no new ERS Outdoor cabinet, 1no CSC outdoor cabinet and 1no Distribution board at main roof level; replacement of 1no single user to 1no multi user meter cabinet at ground floor level; associated development thereto.

    22 Jan 2021 Telecoms
  • Pavement Outside 17-25 Farm Lane London SW6 1PX London SW6 1PA

    Installation of 1no. 20m high Phase 8 Monopole with a wraparound cabinet at the base; and associated ancillary works.

    29 May 2020 Telecoms
  • Novotel 1 Shortlands London W6 8DR

    Installation of an upgrade to existing telecommunications equipment at roof level; including the installation of 1no. aperture antenna on a face fixed support pole and 2no. aperture antennas on an "H" frame support pole attached to the wall of an existing plantroom; installation of 1no. aperture antenna on a face fixed support pole and 2no. aperture antennas on an "H" frame support pole attached to the wall of the other existing plantroom; installation of 1no. H3G GPS module on top of an aperture antenna support pole; installation of 1no. EE GPS module on top of aperture antenna support pole; installation of additional equipment cabinets; and associated ancillary works.

    29 May 2020 Telecoms
  • 2020/01561/TEL56 Awaiting decision

    Cambridge House 100 Cambridge Grove London

    Installation of an upgrade to existing telecommunications equipment at roof level; including the installation of 6no. new aperture antennas on new support poles fixed to the rooftop; and associated ancillary development, all at roof level.

    19 Jun 2020 Telecoms
  • 2020/01420/TEL56 Awaiting decision

    131 - 166 Lancaster Court Darlan Road London

    Installation of an upgrade to existing telecommunications equipment at roof level; including the installation of 4no. aperture antennas to be mounted on new roof pod; installation of 1no. EE GPS module on top of aperture antenna support pole; installation of 1no. H3G GPS module on top of aperture antenna support pole; installation of 2no. aperture antennas to be mounted on tri-pod; and associated ancillary works.

    5 Jun 2020 Telecoms