Skip to content
PlanIndex Get alerts
Menu

Planning application

13 Cambridge Grove London W6 0LA

Awaiting decision Hammersmith and Fulham 2020/01751/FUL Full Detailed Planning Application

Works: Windows or glazing

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of a balustrade through the raising of the front parapet wall to the front elevation of the flat roof at second floor level and erection of a glazed screen to the rear elevation of the flat roof at second floor level, in connection with the use of the flat roof as a roof terrace; installation of a door to the side elevation at second floor level to provide access to the proposed roof terrace.

As published by the council, reference 2020/01751/FUL

Application record

Reference
2020/01751/FUL
Type
Full Detailed Planning Application
Status
Pending Consideration
Received
10 Jul 2020
Validated
13 Jul 2020
Ward
Hammersmith Broadway
Decision by
Delegated Decision
Postcode
W6 0LA

Timeline

Dates from the published record

  1. 10 Jul 2020

    Received by Hammersmith and Fulham

  2. 13 Jul 2020

    Validated

    Checked as complete and ready for consideration.

  3. 22 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 7 September 2020, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided full applications in a median of 88 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 104 King Street London W6 0QW

    2020/01800/FUL Submitted 15 Jul 2020 19m away

    97% historically approved · decision due ~15 Sep

    The demolition and removal of the existing timber sheds buildings and the concrete frame buildings only on the site.

    Awaiting decision Full applications Demolition 40 docs
  • 104 King Street London W6 0QW

    2021/00322/DET Submitted 1 Feb 2021 20m away

    95% historically approved · decision due ~6 Apr

    Details of Construction Management Plan, in compliance with condition 7; details of construction logistics plan, in compliance with condition 8 of planning permission (ref. 2020/00646/FUL) dated 24 November 2020.

    Awaiting decision Conditions 9 docs
  • 104 King Street London W6 0QW

    2020/00133/DET Submitted 17 Jan 2020 20m away

    Details to partially discharge condition 18 (Air Quality and Dust Management Plan - AQDMP) for demolition and site clearance works; of planning permission (ref. 2019/01494/FUL) dated 10 January 2020.

    Granted Conditions Demolition 8 docs
  • 104 King Street London W6 0QW

    2020/01516/DEM Submitted 16 Jun 2020 20m away

    96% historically approved · decision due ~12 Aug

    Application as to whether prior approval is required under Class B Part 11 of Schedule 2 of the Town and Country Planning (General Permitted Development) (England) Order 2015 for the demolition of Timber open side storage building and Timber processing building.

    Awaiting decision Outline Demolition 38 docs
  • 104 King Street London W6 0QW

    2021/00327/DET Submitted 1 Feb 2021 23m away

    95% historically approved · decision due ~6 Apr

    Details of London Underground (TFL), in compliance with condition 55 of planning permission (ref. 2020/00646/FUL) dated 24 November 2020.

    Awaiting decision Conditions 6 docs
  • 104 King Street London W6 0QW

    2021/00324/DET Submitted 1 Feb 2021 23m away

    95% historically approved · decision due ~6 Apr

    Details of Ventilation, in compliance with condition 18; details of Plant & Noise, in compliance with condition 39 of planning permission (ref. 2020/00646/FUL) dated 24 November 2020.

    Awaiting decision Conditions 8 docs

In Hammersmith and Fulham

  • 343 Fulham Palace Road, London, SW6 6TD

    Installation of a new structure with door opening and the erection of obscure glazed screen around part of the flat roof at third floor level to the rear elevation in connection with its use as a terrace.

    30 Apr 2026 Full applications
  • 24-26 Matheson Road, London, W14 8SW

    Replacement of existing vehicular entrance gates with new vehicular entrance gates and railings in between building no. 24-26 Matheson Road and no. 32 Matheson Road; installation of a pedestrian entrance gate in between building no. 24-26 Matheson Road and no. 22 Matheson Road.

    15 Jun 2026 Full applications
  • 10 Cathnor Road, London, W12 9JA

    Replacement of existing single glazed timber framed sash windows to the front elevation with double glazed timber framed sash windows and the existing single glazed rear elevations with new double glazed timber sash windows; and replacement of existing single glazed timber framed basement entrance door to the rear elevation with a new double glazed composite GRP door.

    26 Jun 2026 Full applications
  • 44 Flat B,Studland Street,London,Hammersmith And Fulham,W6 0JS

    Replacement of all existing timber framed windows at first floor level with new double glazed timber framed windows. Replacement of existing rooflight to the roof of the rear back addition.

    24 Apr 2026 Full applications
  • 59A Chesson Road, London, W14 9QT

    Erection of an additional floor at roof level.

    24 Jun 2026 Full applications