Planning application
Greenside Primary School Westville Road London W12 9PT
Works: Loft or dormer Roofing Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
External alterations to include removal of several defective flat roof coverings and replacement with two and three layer, bituminous felt laid on rigid insulation, raising the profile of the roof and requiring the replacement of timber fascia boards with increased height fascia boards of the same material and decorated to match existing; replacement of roof lights and patent glazing currently in poor condition, with new roof lights and patent glazing to match existing; replacement of trims and flashings; and replacement of existing steel box gutters which are corroded and in poor condition, with the same profile aluminium units as has been done in other areas of the site.
As published by the council, reference 2020/01315/LBC
Application record
- Reference
- 2020/01315/LBC
- Type
- Listed Building Consent
- Status
- Pending Consideration
- Received
- 28 May 2020
- Validated
- 29 May 2020
- Ward
- Askew
- Decision by
- Delegated Decision
- Postcode
- W12 9PT
Site history
Applications at this address on the Hammersmith and Fulham register
This site has had 6 applications since 2020: 2 approved, 0 refused.
-
2026/00045/FUL Granted
Greenside Primary School Westville Road, London, W12 9PT
External alterations to include: replacement of existing roof coverings and roof system with new roof covering and roof system (in varying heights) comprising of new replacement felt to all roofs; replacement of external awnings with new electronically operated awnings; replacement of existing glass with slim double glaze or laminated within the existing crittall metal frame; replacement of existing steel frame (to later extensions) with new steel frame and double-glazing system; replacement of existing rooflights with new safety glass in existing frame and new rooflight to replace modern rooflight; refurbishment and replacement of existing rainwater goods; installation of anchor points and a horizontal lifeline system to provide safe access to roof; associated external alterations.
-
2026/00046/LBC Granted
Greenside Primary School Westville Road, London, W12 9PT
External alterations to include: replacement of existing roof coverings and roof system with new roof covering and roof system (in varying heights) comprising of new replacement felt to all roofs; replacement of external awnings with new electronically operated awnings; replacement of existing glass with slim double glaze or laminated within the existing crittall metal frame; replacement of existing steel frame (to later extensions) with new steel frame and double-glazing system; replacement of existing rooflights with new safety glass in existing frame and new rooflight to replace modern rooflight; refurbishment and replacement of existing rainwater goods; installation of anchor points and a horizontal lifeline system to provide safe access to roof; Internal alterations to include: installation of new internal blinds comprising of white blackout fabric to replace the existing black fabric; associated internal and external alterations.
-
2020/01314/FUL Awaiting decision
Greenside Primary School Westville Road London W12 9PT
External alterations to include removal of several defective flat roof coverings and replacement with two and three layer, bituminous felt laid on rigid insulation, raising the profile of the roof and requiring the replacement of timber fascia boards with increased height fascia boards of the same material and decorated to match existing; replacement of roof lights and patent glazing currently in poor condition, with new roof lights and patent glazing to match existing; replacement of trims and flashings; and replacement of existing steel box gutters which are corroded and in poor condition, with the same profile aluminium units as has been done in other areas of the site.
-
2020/00469/FUL Awaiting decision
Greenside Primary School Westville Road London W12 9PT
Installation of a new door and door entry system to the existing opening on the front elevation of the former caretaker's house; installation of a free standing canopy to the entrance path at the front of the former school caretaker's house building; installation of 1no aluminium post and panel sign to the front lawned area; creation of a new pathway leading from the proposed waiting area at the rear of the former caretaker's house to the schools hallway; refurbishment and repair works to existing fascia boards; associated internal and external alterations in order to enable the use of the formers caretaker's house as a new school visitors reception area (amended development description).
-
2020/00470/LBC Awaiting decision
Greenside Primary School Westville Road London W12 9PT
Installation of a new door and door entry system to the existing opening on the front elevation of the former caretaker's house; installation of a free standing canopy to the entrance path at the front of the former school caretaker's house building; installation of 1no aluminium post and panel sign to the front lawned area; creation of a new pathway leading from the proposed waiting area at the rear of the former caretaker's house to the schools hallway; refurbishment and repair works to existing fascia boards; associated internal and external alterations including installation of secondary glazing to existing metal framed single glazed windows (internally) formation of a new reception area and waiting room, reconfigure the existing bathroom and wc area to enable an accessible toilet, increase the size of the current lobby/hallway area, creation of an opening within an existing built-in cupboard and associated internal and external alterations; in order to enable the use of the formers caretaker's house as a new school visitors reception area (amended development description).
Timeline
Dates from the published record
-
28 May 2020
Received by Hammersmith and Fulham
-
29 May 2020
Validated
Checked as complete and ready for consideration.
-
22 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 July 2020, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in West Midlands
38 applications on PlanIndex · across 16 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham decided heritage and listed building applications in a median of 156 days. More in our guide to how long planning decisions take.
About heritage and listed building applications
Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Greenside Primary School Westville Road London W12 9PT
97% historically approved · decision due ~24 Jul
External alterations to include removal of several defective flat roof coverings and replacement with two and three layer, bituminous felt laid on rigid insulation, raising the profile of the roof and requiring the replacement of timber fascia boards with increased height fascia boards of the same material and decorated to match existing; replacement of roof lights and patent glazing currently in poor condition, with new roof lights and patent glazing to match existing; replacement of trims and flashings; and replacement of existing steel box gutters which are corroded and in poor condition, with the same profile aluminium units as has been done in other areas of the site.
Awaiting decision Full applications Loft or dormer Roofing +1 12 docs -
Greenside Primary School Westville Road, London, W12 9PT
External alterations to include: replacement of existing roof coverings and roof system with new roof covering and roof system (in varying heights) comprising of new replacement felt to all roofs; replacement of external awnings with new electronically operated awnings; replacement of existing glass with slim double glaze or laminated within the existing crittall metal frame; replacement of existing steel frame (to later extensions) with new steel frame and double-glazing system; replacement of existing rooflights with new safety glass in existing frame and new rooflight to replace modern rooflight; refurbishment and replacement of existing rainwater goods; installation of anchor points and a horizontal lifeline system to provide safe access to roof; associated external alterations.
Granted Full applications Extension Loft or dormer +2 53 docs -
Greenside Primary School Westville Road, London, W12 9PT
External alterations to include: replacement of existing roof coverings and roof system with new roof covering and roof system (in varying heights) comprising of new replacement felt to all roofs; replacement of external awnings with new electronically operated awnings; replacement of existing glass with slim double glaze or laminated within the existing crittall metal frame; replacement of existing steel frame (to later extensions) with new steel frame and double-glazing system; replacement of existing rooflights with new safety glass in existing frame and new rooflight to replace modern rooflight; refurbishment and replacement of existing rainwater goods; installation of anchor points and a horizontal lifeline system to provide safe access to roof; Internal alterations to include: installation of new internal blinds comprising of white blackout fabric to replace the existing black fabric; associated internal and external alterations.
Granted Heritage and listed buildings Extension Loft or dormer +2 53 docs -
Greenside Primary School Westville Road London W12 9PT
97% historically approved · decision due ~11 May
Installation of a new door and door entry system to the existing opening on the front elevation of the former caretaker's house; installation of a free standing canopy to the entrance path at the front of the former school caretaker's house building; installation of 1no aluminium post and panel sign to the front lawned area; creation of a new pathway leading from the proposed waiting area at the rear of the former caretaker's house to the schools hallway; refurbishment and repair works to existing fascia boards; associated internal and external alterations in order to enable the use of the formers caretaker's house as a new school visitors reception area (amended development description).
Awaiting decision Full applications 28 docs -
Greenside Primary School Westville Road London W12 9PT
100% historically approved · decision due ~11 May
Installation of a new door and door entry system to the existing opening on the front elevation of the former caretaker's house; installation of a free standing canopy to the entrance path at the front of the former school caretaker's house building; installation of 1no aluminium post and panel sign to the front lawned area; creation of a new pathway leading from the proposed waiting area at the rear of the former caretaker's house to the schools hallway; refurbishment and repair works to existing fascia boards; associated internal and external alterations including installation of secondary glazing to existing metal framed single glazed windows (internally) formation of a new reception area and waiting room, reconfigure the existing bathroom and wc area to enable an accessible toilet, increase the size of the current lobby/hallway area, creation of an opening within an existing built-in cupboard and associated internal and external alterations; in order to enable the use of the formers caretaker's house as a new school visitors reception area (amended development description).
Awaiting decision Heritage and listed buildings Windows or glazing 24 docs -
Crown And Sceptre, 57 Melina Road, London, W12 9HY
Signwriting to existing elevation
Withdrawn Advertising 18 docs
Other heritage and listed building applications
In Hammersmith and Fulham
-
2026/00071/LBC Granted
7 Shepherd's Bush Place London W12 8LX
Erection of rear extensions at ground and first floor levels; installation of a new light channel in the rear roofslope; installation of a new rooflight above the roof of first floor rear back addition; internal alterations at first floor level to include new internal partition walls to form a new bathroom, demolition of the existing partition wall in the rear bathroom and re-decorate the rear bathroom with new units, and installation of new door openings; internal alterations at ground floor level to include replacement of existing kitchen with new wc and utility room together with a new partition wall and door opening, removal of existing double doors in between the proposed kitchen and living room; associated internal alterations.
-
2025/02901/LBC Granted
46 Ravenscourt Gardens, London, W6 0TU
Installation of an air source heat pump within a timber ventilated acoustic enclosure on anti-vibration mounts on top of the ground floor back addition; installation of a gas meter and pedestrian access gate with new pedestrian access gate to the front (northern elevation); replacement of existing wooden gate with new wooden gate to southern elevation of the property; replacement of existing timber trellis on top of the brick boundary wall with new timber trellis (extended) to the western elevation.
-
P/2026/02050/LBC Awaiting decision
River Wall Road Side 28 - 34 Upper Mall London W6 9TA
Creation of a ceramic tile mural to celebrate William Morris and his 1880 journey along the Thames, to be mounted on the road side of the river wall to the Upper Mall across from Kelmscott House, William Morris' home in Hammersmith.
-
2026/00046/LBC Granted
Greenside Primary School Westville Road, London, W12 9PT
External alterations to include: replacement of existing roof coverings and roof system with new roof covering and roof system (in varying heights) comprising of new replacement felt to all roofs; replacement of external awnings with new electronically operated awnings; replacement of existing glass with slim double glaze or laminated within the existing crittall metal frame; replacement of existing steel frame (to later extensions) with new steel frame and double-glazing system; replacement of existing rooflights with new safety glass in existing frame and new rooflight to replace modern rooflight; refurbishment and replacement of existing rainwater goods; installation of anchor points and a horizontal lifeline system to provide safe access to roof; Internal alterations to include: installation of new internal blinds comprising of white blackout fabric to replace the existing black fabric; associated internal and external alterations.
-
P/2026/01051/LBC Granted
Ravenscourt Park Hospital, Ravenscourt Park,London,W6 0TN
Internal and external alterations to Block C including part demolition of existing basement walls, construction of a new lightwell, enlargement of an existing louvred opening, installation of a louvred vent and associated door, construction of a parapet wall and internal strip-out and trenching for power cables, in association with the installation of a new electrical substation.