Planning application
Old Oak Common Station Old Oak Common Lane London NW10 6DZ
Works: Demolition
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application under Schedule 17 of the High Speed Rail (London - West Midlands) Act 2017 for approval of highway routes (conditions relating to road transport) to be used by large goods vehicles associated with the main works stage including main site enabling works, excavation works (main station box), under track crossing works, Stamford Brook Sewer works, piling and diaphragm wall works, installation of tower cranes, conveyor installation, decommissioning works, ground remediation works, satellite site A/B enabling works, Wycombe line bridge demolition works and all other activities for the purposes and in connection with the scheduled and ancillary works for HS2 at four construction site compounds comprising Old Oak Common Station, Atlas Road, Willesden Euro Terminal and Satellite Sites A/B.
As published by the council, reference 2020/01183/OPDOBS
Application record
- Reference
- 2020/01183/OPDOBS
- Type
- Observations to OPDC
- Status
- Pending Decision
- Received
- 4 May 2020
- Validated
- 5 May 2020
- Ward
- College Park And Old Oak
- Decision by
- Delegated Decision
- Postcode
- NW10 6DZ
Timeline
Dates from the published record
-
4 May 2020
Received by Hammersmith and Fulham
-
5 May 2020
Validated
Checked as complete and ready for consideration.
-
22 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 June 2020, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Hammersmith and Fulham took a median of 78 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, a developer
54 applications on PlanIndex · across 4 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
2 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Hammersmith and Fulham for determination, against a statutory target of eight weeks. Over the last year Hammersmith and Fulham's median decision took 78 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Hammersmith and Fulham's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Heathrow Express Depot Old Oak Common Lane London NW10 6DZ
96% historically approved · decision due ~27 Mar
Application under Schedule 16 of the High Speed Rail London West Midlands Act 2017 relating to the onsite road layout associated with the new Old Oak Common station
Awaiting decision 2 docs -
Old Oak Common Lane London NW10 6DZ
Application under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017 for works associated with the extension of the previously consented replacement Great Western Mainline Bridge and a new bridge to non-preclude a potential future extension of the Chiltern Line; collision protection beam; modifications to abutments of existing Intercity Express Programme Bridge; earthworks; retaining walls; guardrails; track access stairs; fencing and lighting equipment.
Granted Outline Extension 2 docs -
Old Oak Common Lane London NW10 6DZ
Application under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017 for works associated with the extension of the previously consented replacement Great Western Mainline Bridge and a new bridge to non-preclude a potential future extension of the Chiltern Line; collision protection beam; modifications to abutments of existing Intercity Express Programme Bridge; earthworks; retaining walls; guardrails; track access stairs; fencing and lighting equipment.
Granted Outline Extension 2 docs -
Old Oak Common Lane (between Wells House Road And Wormwood Scrubs) London NW10 6DZ
Application under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017, for works related to the replacement Great Western Mainline Bridge; a new bridge to non-preclude a potential future extension of the Chiltern Line; collision protection beam; modifications to abutments of the existing Intercity Express Programme Bridge; and associated earthworks and fencing. (Out of borough)
Granted Outline Extension 2 docs -
Old Oak Common Lane (between Wells House Road And Wormwood Scrubs) London NW10 6DZ
Application under Schedule 17 of the High Speed Rail (London-West Midlands) Act 2017, for works related to the replacement Great Western Mainline Bridge; a new bridge to non-preclude a potential future extension of the Chiltern Line; collision protection beam; modifications to abutments of the existing Intercity Express Programme Bridge; and associated earthworks and fencing. (Out of borough)
Granted Outline Extension 2 docs -
Old Oak Common Rail Depot Old Oak Common Lane London NW10 6DZ
96% historically approved · decision due ~18 Nov
Installation of 1no. internally illuminated fascia sign to the main entrance of the Old Oak Common Station building
Awaiting decision