Planning application
FORMER NATIONAL GRID SITE, MILLENNIUM WAY, GREENWICH, SE10 0BB
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of two buildings for use as Purpose Built Student Accommodation (PBSA) (sui generis)...
As published by the council, reference 26/2018/F
Application record
- Reference
- 26/2018/F
- Category
- Full applications
- Status
- Registered
- Received
- 7 Jul 2026
- Ward
- GREENWICH PENINSULA
- Parish
- Greenwich
- Postcode
- SE10 0BB
Timeline
Dates from the published record
-
7 Jul 2026
Received by Greenwich
-
26 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Greenwich took a median of 56 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
162 documents on file for this application
- Pbsa & co-living fva
- Correspondance
- Financial viability asessment
- Revised chapter 011 - residual effects, mitigation and cumulative effects
- Letter from ravensbourne university london
- Utilities assessment
- London plan fire statement
- Appendix 6.1 images of existing, proposed and surrounding buildings
- 011 residual effects, mitigation and cumulative effects
- 003 proposed development, construction
- 006 daylight, sunlight, overshadowing and solar glare
- Es volume i: main text
- Existing west elevation
- Existing site location plan
- Existing site plan
- Existing north elevation
- Millennium way - planning statement 149325260000.pdf
- Covering letter
- Mw thvia lr final part 2
- Mw thvia lr finalpart1
- Application form redacted
- Appendix 1.1 site location plan149325260000.pdf
- Appendix 1.2 location of specified information149325260000.pdf
- Appendix 1.3 eia scoping request part 1
- Appendix 1.3 eia scoping request part 2
- Appendix 1.4 rbg eia scoping opinion
- Vol iii non-technical summary
- Appendix 8.3 rba noise impact assessment report 14776nia149325260000.pdf
- Appendix 9.1 policy review 149325260000.pdf
- Appendix 9.2 health impact assessment149325260000.pdf
- Appendix 10.1 wind microclimate report part 1
- Appendix 10.1 wind microclimate report part 2
- Appendix 11.1 schedule of mitigation measures in the es1
- Appendix 6.6 solar glare frequency assessment149325260000.pdf
- Appendix 7.1 desk study preliminary risk assessme part 1149325260000.pdf
- Appendix 7.1 desk study preliminary risk assessme part 2149325260000.pdf
- Appendix 7.2 draft geo-environmental ground investigation149325260000.pdf
- Appendix 8.1 acoustic terminology149325260000.pdf
- Appendix 8.2 construction plant teams149325260000.pdf
- Appendix 5.3 millenium way overheating report149325260000.pdf
- Appendix 6.2 daylight and sunlight assessment results149325260000.pdf
- Appendix 6.3 daylight and sunlight facade studies part 1149325260000.pdf
- Appendix 6.3 daylight and sunlight facade studies part 2149325260000.pdf
- Appendix 6.4 sunlight amenity assessment149325260000.pdf
- Appendix 6.5 transient shadow images149325260000.pdf
- Appendix 3.1 detailed planning drawings part 3
- Appendix 3.1 detailed planning drawings part 4
- Appendix 3.1 detailed planning drawings part 5
- Appendix 3.1 detailed planning drawings part 6
- Appendix 5.1 millenium way energy strategy report 1
- Appendix 5.2 millenium way whole life carbon assessment149325260000.pdf
- Appendix 1.5 consultation response table
- Appendix 1.6 competency statement
- Appendix 1.7 cumulative schemes
- Appendix 3.1 detailed planning drawings part 1
- Appendix 3.1 detailed planning drawings part 2
- 008 noise and vibration149325260000.pdf
- 009 socio-economics and health149325260000.pdf
- 010 wind microclimate149325260000.pdf
- Landscape strategy.pdf
- 25.035-bosk-xx-00-dr-l-1000 p16149325260000.pdf
- 25.035-bosk-xx-zz-dr-l-1000 p12149325260000.pdf
- 000 cover page149325260000.pdf
- 001 description and eia methodology149325260000.pdf
- 002 description of site and site context149325260000.pdf
- 004 air quality149325260000.pdf
- 005 climate change and greenhouse gases149325260000.pdf
- 007 ground conditions and contamination149325260000.pdf
- Wind microclimate report
- Design and access statement - lowres-97-129
- Design and access statement - lowres-1-40
- Design and access statement - lowres-41-74
- Design and access statement - lowres-75-96
- Full sap calculation printout combinedunit 2l02studiow-55studiow-55be lean2026-0
- Full sap calculation printout combinedunit 3l02studiosw-52studiosw-52be clean202
- Full sap calculation printout combinedunit 3l02studiosw-52studiosw-52be green202
- Daylight and sunlight report
- Flood risk assessment & drainage strategy report
- Student and co-living needs assessment
- Full sap calculation printout combinedunit 8l02studion-40studion-40be lean2026-0
- Full sap calculation printout combinedunit 1l02studionw-58studionw-58be clean202
- Full sap calculation printout combinedunit 1l02studionw-58studionw-58be green202
- Full sap calculation printout combinedunit 1l02studionw-58studionw-58be lean2026
- Full sap calculation printout combinedunit 2l02studiow-55studiow-55be clean2026-
- Full sap calculation printout combinedunit 2l02studiow-55studiow-55be green2026-
- Full sap calculation printout combinedunit 6l02studioe-45studioe-45be lean2026-0
- Full sap calculation printout combinedunit 7l02studione-42studione-42be clean202
- Full sap calculation printout combinedunit 7l02studione-42studione-42be green202
- Full sap calculation printout combinedunit 7l02studione-42studione-42be lean2026
- Full sap calculation printout combinedunit 8l02studion-40studion-40be clean2026-
- Full sap calculation printout combinedunit 8l02studion-40studion-40be green2026-
- Full sap calculation printout combinedunit 4l02studios-50studios-50be lean2026-0
- Full sap calculation printout combinedunit 5l02studiose-48studiose-48be clean202
- Full sap calculation printout combinedunit 5l02studiose-48studiose-48be green202
- Full sap calculation printout combinedunit 5l02studiose-48studiose-48be lean2026
- Full sap calculation printout combinedunit 6l02studioe-45studioe-45be clean2026-
- Full sap calculation printout combinedunit 6l02studioe-45studioe-45be green2026-
- Pbsabe greenbrukl
- Pbsabe leanbrukl
- Be seen spreadsheet
- Full sap calculation printout combinedunit 3l02studiosw-52studiosw-52be lean2026
- Full sap calculation printout combinedunit 4l02studios-50studios-50be clean2026-
- Full sap calculation printout combinedunit 4l02studios-50studios-50be green2026-
- Site waste management plan
- Circular economy statements
- Lpg- wlca assessment mw planning
- Gla spread sheet
- Brukl output document
- Co livingbe leanbrukl
- Biodiversity net gain feasibility assessment
- Appendix 4.1 detailed air quality assessment
- Statutory biodiversity metric
- Millennium way - pre redevelopment audit149325260000.pdf
- Circular economy statement -
- Outline construction logistics plan
- Framework travel plan
- Statement of community involvement
- Archaeological dba final
- Planning gateway one fire statement
- Preliminary ecological appraisal
- Student housing management
- Coliving lspbsl management plan
- Aviation impact assessment v1.1
- Transport assessment
- Swept path analysis
- Outline construction logistics plan
- Level 13 plan - pbsa
- Level 14-24 - pbsa
- Level 25 - pbsa
- Level 26 - pbsa
- Financial viability assessment report
- Project abnormal costs and risks register
- Proposed phasing plan
- Proposed site topography
- Proposed block plan
- Level 00 plan - pbsa
- Level 01 plan - pbsa
- Level 02-12 - pbsa
- Bay study 4 - pbsa shoulder condition
- Bay study 5 - pbsl base condition
- Bay study 6 - pbsl typical condition
- Bay study 7 - pbsl crown condition
- Proposed site location plan
- Proposed site plan
- West elevation
- Proposed west-east section
- Proposed south-north section
- Bay study 1 - pbsa base condition
- Bay study 2 - pbsa typical condition
- Bay study 3 - pbsa top condition
- Level 12 plan - pbsl
- Level 22 plan - pbsl
- Roof plan - pbsl
- North elevation
- Proposed east elevation
- South elevation
- Existing east elevation
- Existing south elevation
- Roof plan - pbsa
- Level 00 plan - pbsl
- Level 01 plan - pbsl
- Level 02-12 13-21 - pbsl
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Greenwich for determination, against a statutory target of eight weeks. Over the last year Greenwich decided full applications in a median of 81 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
FORMER NATIONAL GRID SITE, MILLENNIUM WAY, GREENWICH, SE10 0BB
91% historically approved · decision due ~16 Sep
Observation requested by Royal borough of Greenwich for Construction of two buildings for use as ...
Awaiting decision -
UNIT 2, VICTORIA DEEP WATER TERMINAL, TUNNEL AVENUE, GREENWICH, LONDON, SE10 0QE
Submission of details pursuant to the discharge of Condition 18 (River Wall Survey) and Condition 19 (River Wall Strengthening and Habitat Enhancement) of planning permission 16/3478/F dated 20/06/2019, as amended by 20/0545/NM.
Granted Conditions 67 docs -
LAND AT BAY WHARF, TUNNEL AVENUE, GREENWICH, SE10 0QE
74% historically approved · decision due ~30 Apr
Use of the land for Class B8 (storage and distribution) purposes, temporary installation of buildings, storage units and containers, installation of fencing, parking, external storage bays and drainage infrastructure, and other infrastructure and ancillary works.
Awaiting decision Full applications 22 docs -
Golf Driving Range, 265 TUNNEL AVENUE, LONDON, SE10 0QE
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the planning permission dated 21/10/2024 (Reference: 24/1818/MA) for Temporary use of the land for 10 years for the construction of a Golf Driving Range, including mini golf / family amenity area, Club House, retail units, café, floodlighting, associated car and cycle parking, landscaping, infrastructure and public footpath diversion. This amendment seeks the introduction of a replacement netting system.
Granted Amendments 8 docs -
265 TUNNEL AVENUE, LONDON, SE10 0QE
An application under S73 of the Town and Country Planning Act 1990 for a minor material amendment to planning permission 14/2161/F dated 09/02/2015 for Temporary use of the land for 10 years for the construction of a Golf Driving Range, including mini golf / family amenity area, Club House, retail units, café, floodlighting, associated car and cycle parking, landscaping, infrastructure and public footpath diversion, to allow: Vary Condition 2 (Expiration of Planning Permission) to extend the period of the temporary Golf Driving Range for a further 10-year period. Update the plans listed under Condition 1 (Approved Drawings) with those amended to reflect the as built development. Variation of the wording of the following conditions to compliance conditions with reference to details included within this application: Condition 3 (Facing Materials), Condition 4 (Hard and Soft Landscaping), Condition 6 (External Lighting), Condition 8 (Artificial Light/Illumination Validation Test), Condition 14 (London Underground Infrastructure Protection), Condition 15 (Delivery and Servicing Plan), Condition 16 (Car Park Management), Condition 17 (Cycle Parking), Condition 18 (Refuse and Recycling), Condition 22 (Wayfinding and Signage Strategy), Condition 24 (Mini Golf/Family Amenity Area), Condition 25 (Ecological Assessment Report), Condition 27 (Control of Invasive Plants), Condition 29 (Verification report), Condition 31 (surface water drainage scheme), Condition 32 (flood evacuation plan), Condition 33 (rainwater harvesting), Condition 34 (secure by design), Condition 35 (travel plan). Deletion of the following conditions: Condition 10 (Demolition and Construction Method Statement), Condition 13 (Construction Logistics Plan), Condition 20 (Monitoring Dust and Noise), Condition 21 (Archaeology), Condition 26 (Timing of vegetation clearance), Condition 28 (Contaminated Land), Condition 30 (Unsuspected contamination).
Granted Amendments Demolition 63 docs -
Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF
An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: Design alterations to the central circulation core to comply with fire regulations; Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios. Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms. Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O. Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade. Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing. Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15. Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.
Granted Amendments Windows or glazing Trees 61 docs
Other full applications
In Greenwich
-
26/0344/F Granted
53 TUNNEL AVENUE & Grass Verge Fronting Chilver Street, GREENWICH, LONDON, SE10 0SF
Construction of a two-storey detached family dwelling and associated works.
-
26/1830/F Decided
CHARLTON RUGBY CLUB, 60A BROAD WALK, LONDON, SE3 8NB
Retrospective application for the use of land as a motorcycle training centre (Sui Generis) and i...
-
26/1396/F Granted
9-13 POWIS STREET, LONDON, SE18 6HZ
Changes to the shopfront, including the installation of new emergency fire escape door, and repla...
-
25/4091/F Granted
UNIT 6, 108 NATHAN WAY, THAMESMEAD, SE28 0AU
Proposed Extension of Existing Dropped Kerb (Additional 5.5m)(Re-consultation)
-
26/2071/F Decided
40 THE HEIGHTS, CHARLTON, LONDON, SE7 8JH
Conversion of the existing side extension into a self contained dwelling.