Skip to content
PlanIndex Get alerts
Menu

Planning application

FORMER NATIONAL GRID SITE, MILLENNIUM WAY, GREENWICH, SE10 0BB

Awaiting decision Greenwich 26/2018/F Full applications

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Construction of two buildings for use as Purpose Built Student Accommodation (PBSA) (sui generis)...

As published by the council, reference 26/2018/F

Application record

Reference
26/2018/F
Category
Full applications
Status
Registered
Received
7 Jul 2026
Ward
GREENWICH PENINSULA
Parish
Greenwich
Postcode
SE10 0BB

Timeline

Dates from the published record

  1. 7 Jul 2026

    Received by Greenwich

  2. 26 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 1 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Greenwich took a median of 56 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

162 documents on file for this application

  • Pbsa & co-living fva Document · 21 Aug 2026
  • Correspondance Correspondence · 31 Jul 2026
  • Financial viability asessment Superseded · 30 Jul 2026
  • Revised chapter 011 - residual effects, mitigation and cumulative effects Document · 30 Jul 2026
  • Letter from ravensbourne university london Document · 15 Jul 2026
  • Utilities assessment Document · 15 Jul 2026
  • London plan fire statement Document · 15 Jul 2026
  • Appendix 6.1 images of existing, proposed and surrounding buildings Document · 14 Jul 2026
  • 011 residual effects, mitigation and cumulative effects Superseded · 13 Jul 2026
  • 003 proposed development, construction Document · 13 Jul 2026
  • 006 daylight, sunlight, overshadowing and solar glare Document · 13 Jul 2026
  • Es volume i: main text Document · 13 Jul 2026
  • Existing west elevation Drawing · 08 Jul 2026
  • Existing site location plan Drawing · 08 Jul 2026
  • Existing site plan Drawing · 08 Jul 2026
  • Existing north elevation Drawing · 08 Jul 2026
  • Millennium way - planning statement 149325260000.pdf Document · 08 Jul 2026
  • Covering letter Document · 08 Jul 2026
  • Mw thvia lr final part 2 Document · 08 Jul 2026
  • Mw thvia lr finalpart1 Document · 08 Jul 2026
  • Application form redacted Application Form · 08 Jul 2026
  • Appendix 1.1 site location plan149325260000.pdf Document · 08 Jul 2026
  • Appendix 1.2 location of specified information149325260000.pdf Document · 08 Jul 2026
  • Appendix 1.3 eia scoping request part 1 Document · 08 Jul 2026
  • Appendix 1.3 eia scoping request part 2 Document · 08 Jul 2026
  • Appendix 1.4 rbg eia scoping opinion Document · 08 Jul 2026
  • Vol iii non-technical summary Document · 08 Jul 2026
  • Appendix 8.3 rba noise impact assessment report 14776nia149325260000.pdf Document · 08 Jul 2026
  • Appendix 9.1 policy review 149325260000.pdf Document · 08 Jul 2026
  • Appendix 9.2 health impact assessment149325260000.pdf Document · 08 Jul 2026
  • Appendix 10.1 wind microclimate report part 1 Document · 08 Jul 2026
  • Appendix 10.1 wind microclimate report part 2 Document · 08 Jul 2026
  • Appendix 11.1 schedule of mitigation measures in the es1 Document · 08 Jul 2026
  • Appendix 6.6 solar glare frequency assessment149325260000.pdf Document · 08 Jul 2026
  • Appendix 7.1 desk study preliminary risk assessme part 1149325260000.pdf Document · 08 Jul 2026
  • Appendix 7.1 desk study preliminary risk assessme part 2149325260000.pdf Document · 08 Jul 2026
  • Appendix 7.2 draft geo-environmental ground investigation149325260000.pdf Document · 08 Jul 2026
  • Appendix 8.1 acoustic terminology149325260000.pdf Document · 08 Jul 2026
  • Appendix 8.2 construction plant teams149325260000.pdf Document · 08 Jul 2026
  • Appendix 5.3 millenium way overheating report149325260000.pdf Document · 08 Jul 2026
  • Appendix 6.2 daylight and sunlight assessment results149325260000.pdf Document · 08 Jul 2026
  • Appendix 6.3 daylight and sunlight facade studies part 1149325260000.pdf Document · 08 Jul 2026
  • Appendix 6.3 daylight and sunlight facade studies part 2149325260000.pdf Document · 08 Jul 2026
  • Appendix 6.4 sunlight amenity assessment149325260000.pdf Document · 08 Jul 2026
  • Appendix 6.5 transient shadow images149325260000.pdf Document · 08 Jul 2026
  • Appendix 3.1 detailed planning drawings part 3 Document · 08 Jul 2026
  • Appendix 3.1 detailed planning drawings part 4 Document · 08 Jul 2026
  • Appendix 3.1 detailed planning drawings part 5 Document · 08 Jul 2026
  • Appendix 3.1 detailed planning drawings part 6 Document · 08 Jul 2026
  • Appendix 5.1 millenium way energy strategy report 1 Document · 08 Jul 2026
  • Appendix 5.2 millenium way whole life carbon assessment149325260000.pdf Document · 08 Jul 2026
  • Appendix 1.5 consultation response table Document · 08 Jul 2026
  • Appendix 1.6 competency statement Document · 08 Jul 2026
  • Appendix 1.7 cumulative schemes Drawing · 08 Jul 2026
  • Appendix 3.1 detailed planning drawings part 1 Document · 08 Jul 2026
  • Appendix 3.1 detailed planning drawings part 2 Document · 08 Jul 2026
  • 008 noise and vibration149325260000.pdf Document · 08 Jul 2026
  • 009 socio-economics and health149325260000.pdf Document · 08 Jul 2026
  • 010 wind microclimate149325260000.pdf Document · 08 Jul 2026
  • Landscape strategy.pdf Document · 08 Jul 2026
  • 25.035-bosk-xx-00-dr-l-1000 p16149325260000.pdf Drawing · 08 Jul 2026
  • 25.035-bosk-xx-zz-dr-l-1000 p12149325260000.pdf Drawing · 08 Jul 2026
  • 000 cover page149325260000.pdf Document · 08 Jul 2026
  • 001 description and eia methodology149325260000.pdf Document · 08 Jul 2026
  • 002 description of site and site context149325260000.pdf Document · 08 Jul 2026
  • 004 air quality149325260000.pdf Document · 08 Jul 2026
  • 005 climate change and greenhouse gases149325260000.pdf Document · 08 Jul 2026
  • 007 ground conditions and contamination149325260000.pdf Document · 08 Jul 2026
  • Wind microclimate report Document · 08 Jul 2026
  • Design and access statement - lowres-97-129 Document · 08 Jul 2026
  • Design and access statement - lowres-1-40 Document · 08 Jul 2026
  • Design and access statement - lowres-41-74 Document · 08 Jul 2026
  • Design and access statement - lowres-75-96 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 2l02studiow-55studiow-55be lean2026-0 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 3l02studiosw-52studiosw-52be clean202 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 3l02studiosw-52studiosw-52be green202 Document · 08 Jul 2026
  • Daylight and sunlight report Document · 08 Jul 2026
  • Flood risk assessment & drainage strategy report Document · 08 Jul 2026
  • Student and co-living needs assessment Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 8l02studion-40studion-40be lean2026-0 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 1l02studionw-58studionw-58be clean202 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 1l02studionw-58studionw-58be green202 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 1l02studionw-58studionw-58be lean2026 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 2l02studiow-55studiow-55be clean2026- Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 2l02studiow-55studiow-55be green2026- Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 6l02studioe-45studioe-45be lean2026-0 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 7l02studione-42studione-42be clean202 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 7l02studione-42studione-42be green202 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 7l02studione-42studione-42be lean2026 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 8l02studion-40studion-40be clean2026- Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 8l02studion-40studion-40be green2026- Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 4l02studios-50studios-50be lean2026-0 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 5l02studiose-48studiose-48be clean202 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 5l02studiose-48studiose-48be green202 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 5l02studiose-48studiose-48be lean2026 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 6l02studioe-45studioe-45be clean2026- Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 6l02studioe-45studioe-45be green2026- Document · 08 Jul 2026
  • Pbsabe greenbrukl Document · 08 Jul 2026
  • Pbsabe leanbrukl Document · 08 Jul 2026
  • Be seen spreadsheet Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 3l02studiosw-52studiosw-52be lean2026 Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 4l02studios-50studios-50be clean2026- Document · 08 Jul 2026
  • Full sap calculation printout combinedunit 4l02studios-50studios-50be green2026- Document · 08 Jul 2026
  • Site waste management plan Document · 08 Jul 2026
  • Circular economy statements Document · 08 Jul 2026
  • Lpg- wlca assessment mw planning Document · 08 Jul 2026
  • Gla spread sheet Document · 08 Jul 2026
  • Brukl output document Document · 08 Jul 2026
  • Co livingbe leanbrukl Document · 08 Jul 2026
  • Biodiversity net gain feasibility assessment Document · 08 Jul 2026
  • Appendix 4.1 detailed air quality assessment Document · 08 Jul 2026
  • Statutory biodiversity metric Document · 08 Jul 2026
  • Millennium way - pre redevelopment audit149325260000.pdf Document · 08 Jul 2026
  • Circular economy statement - Document · 08 Jul 2026
  • Outline construction logistics plan Document · 08 Jul 2026
  • Framework travel plan Document · 08 Jul 2026
  • Statement of community involvement Document · 08 Jul 2026
  • Archaeological dba final Document · 08 Jul 2026
  • Planning gateway one fire statement Document · 08 Jul 2026
  • Preliminary ecological appraisal Document · 08 Jul 2026
  • Student housing management Document · 08 Jul 2026
  • Coliving lspbsl management plan Document · 08 Jul 2026
  • Aviation impact assessment v1.1 Document · 08 Jul 2026
  • Transport assessment Document · 08 Jul 2026
  • Swept path analysis Drawing · 08 Jul 2026
  • Outline construction logistics plan Document · 08 Jul 2026
  • Level 13 plan - pbsa Drawing · 08 Jul 2026
  • Level 14-24 - pbsa Drawing · 08 Jul 2026
  • Level 25 - pbsa Drawing · 08 Jul 2026
  • Level 26 - pbsa Drawing · 08 Jul 2026
  • Financial viability assessment report Superseded · 08 Jul 2026
  • Project abnormal costs and risks register Document · 08 Jul 2026
  • Proposed phasing plan Drawing · 08 Jul 2026
  • Proposed site topography Drawing · 08 Jul 2026
  • Proposed block plan Drawing · 08 Jul 2026
  • Level 00 plan - pbsa Drawing · 08 Jul 2026
  • Level 01 plan - pbsa Drawing · 08 Jul 2026
  • Level 02-12 - pbsa Drawing · 08 Jul 2026
  • Bay study 4 - pbsa shoulder condition Drawing · 08 Jul 2026
  • Bay study 5 - pbsl base condition Drawing · 08 Jul 2026
  • Bay study 6 - pbsl typical condition Drawing · 08 Jul 2026
  • Bay study 7 - pbsl crown condition Drawing · 08 Jul 2026
  • Proposed site location plan Drawing · 08 Jul 2026
  • Proposed site plan Drawing · 08 Jul 2026
  • West elevation Drawing · 08 Jul 2026
  • Proposed west-east section Drawing · 08 Jul 2026
  • Proposed south-north section Drawing · 08 Jul 2026
  • Bay study 1 - pbsa base condition Drawing · 08 Jul 2026
  • Bay study 2 - pbsa typical condition Drawing · 08 Jul 2026
  • Bay study 3 - pbsa top condition Drawing · 08 Jul 2026
  • Level 12 plan - pbsl Drawing · 08 Jul 2026
  • Level 22 plan - pbsl Drawing · 08 Jul 2026
  • Roof plan - pbsl Drawing · 08 Jul 2026
  • North elevation Drawing · 08 Jul 2026
  • Proposed east elevation Drawing · 08 Jul 2026
  • South elevation Drawing · 08 Jul 2026
  • Existing east elevation Drawing · 08 Jul 2026
  • Existing south elevation Drawing · 08 Jul 2026
  • Roof plan - pbsa Drawing · 08 Jul 2026
  • Level 00 plan - pbsl Drawing · 08 Jul 2026
  • Level 01 plan - pbsl Drawing · 08 Jul 2026
  • Level 02-12 13-21 - pbsl Drawing · 08 Jul 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Greenwich for determination, against a statutory target of eight weeks. Over the last year Greenwich decided full applications in a median of 81 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • FORMER NATIONAL GRID SITE, MILLENNIUM WAY, GREENWICH, SE10 0BB

    PA/26/01255/NC Submitted 22 Jul 2026 0m away

    91% historically approved · decision due ~16 Sep

    Observation requested by Royal borough of Greenwich for Construction of two buildings for use as ...

    Awaiting decision
  • UNIT 2, VICTORIA DEEP WATER TERMINAL, TUNNEL AVENUE, GREENWICH, LONDON, SE10 0QE

    25/1660/SD Submitted 21 May 2025 229m away

    Submission of details pursuant to the discharge of Condition 18 (River Wall Survey) and Condition 19 (River Wall Strengthening and Habitat Enhancement) of planning permission 16/3478/F dated 20/06/2019, as amended by 20/0545/NM.

    Granted Conditions 67 docs
  • LAND AT BAY WHARF, TUNNEL AVENUE, GREENWICH, SE10 0QE

    26/0706/F Submitted 5 Mar 2026 229m away

    74% historically approved · decision due ~30 Apr

    Use of the land for Class B8 (storage and distribution) purposes, temporary installation of buildings, storage units and containers, installation of fencing, parking, external storage bays and drainage infrastructure, and other infrastructure and ancillary works.

    Awaiting decision Full applications 22 docs
  • Golf Driving Range, 265 TUNNEL AVENUE, LONDON, SE10 0QE

    25/3802/NM Submitted 11 Nov 2025 229m away

    An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with the planning permission dated 21/10/2024 (Reference: 24/1818/MA) for Temporary use of the land for 10 years for the construction of a Golf Driving Range, including mini golf / family amenity area, Club House, retail units, café, floodlighting, associated car and cycle parking, landscaping, infrastructure and public footpath diversion. This amendment seeks the introduction of a replacement netting system.

    Granted Amendments 8 docs
  • 265 TUNNEL AVENUE, LONDON, SE10 0QE

    24/1818/MA Submitted 6 Jun 2024 229m away

    An application under S73 of the Town and Country Planning Act 1990 for a minor material amendment to planning permission 14/2161/F dated 09/02/2015 for Temporary use of the land for 10 years for the construction of a Golf Driving Range, including mini golf / family amenity area, Club House, retail units, café, floodlighting, associated car and cycle parking, landscaping, infrastructure and public footpath diversion, to allow: Vary Condition 2 (Expiration of Planning Permission) to extend the period of the temporary Golf Driving Range for a further 10-year period. Update the plans listed under Condition 1 (Approved Drawings) with those amended to reflect the as built development. Variation of the wording of the following conditions to compliance conditions with reference to details included within this application: Condition 3 (Facing Materials), Condition 4 (Hard and Soft Landscaping), Condition 6 (External Lighting), Condition 8 (Artificial Light/Illumination Validation Test), Condition 14 (London Underground Infrastructure Protection), Condition 15 (Delivery and Servicing Plan), Condition 16 (Car Park Management), Condition 17 (Cycle Parking), Condition 18 (Refuse and Recycling), Condition 22 (Wayfinding and Signage Strategy), Condition 24 (Mini Golf/Family Amenity Area), Condition 25 (Ecological Assessment Report), Condition 27 (Control of Invasive Plants), Condition 29 (Verification report), Condition 31 (surface water drainage scheme), Condition 32 (flood evacuation plan), Condition 33 (rainwater harvesting), Condition 34 (secure by design), Condition 35 (travel plan). Deletion of the following conditions: Condition 10 (Demolition and Construction Method Statement), Condition 13 (Construction Logistics Plan), Condition 20 (Monitoring Dust and Noise), Condition 21 (Archaeology), Condition 26 (Timing of vegetation clearance), Condition 28 (Contaminated Land), Condition 30 (Unsuspected contamination).

    Granted Amendments Demolition 63 docs
  • Phase 2, Located on the Corner of Boord Street and Dreadnought Street, Greenwich, SE10 0PF

    25/3952/NM Submitted 24 Nov 2025 230m away

    An application submitted under Section 96a of the Town & Country Planning Act 1990 for a non-material amendment in connection with planning consent (24/0995/F) dated 27/11/2024 solely relating to phase 2 (Purpose Built Student Accommodation Phase) to allow: Design alterations to the central circulation core to comply with fire regulations; Minor alteration to accommodation mix, on Levels 15-17 to provide three premium studios. Reconfiguration of several rooms to ensure all cluster bedrooms to achieve a minimum area of 13sqm for cluster bedrooms. Addition of louvres and grills to elevation at lower levels for the ventilation to ensure compliance with building regulations Part L and Part O. Relocation of the back-up generator form Level 17 to the second-floor terrace in response to feedback from the London Fire Brigade. Minor external changes to the building envelope and fenestration in response to the internal layout updates to include some wider windows and a narrow brick pier detail to provide visual interest and maintain narrow vertical bays for glazing. Addition of permeable paving and areas of intensive green roof at Levels 18 and 2, along with more raised planting, small multi-stem trees and pergolas with vertical greening at Level 13 and 15. Minor alignment of the South-East elevation to widen the building at high level only to accommodate the core redesign and minor internal layout changes. Owing to the changes highlighted above, conditions 2 (approved drawings), 15 (Unsuspected Contamination), 26 (Wheelchair Units), 30 (Wind Mitigation), 36 (Foul Water Capacity), 37 (Clean Water Infrastructure), 44 (Non-residential space), 54 (Fire Statement) and 58 (Green/Brown Roofs and Walls) will require amendments and a new condition added to cover inclusive design for this PBSA phase.

    Granted Amendments Windows or glazing Trees 61 docs

In Greenwich

  • 26/0344/F Granted

    53 TUNNEL AVENUE & Grass Verge Fronting Chilver Street, GREENWICH, LONDON, SE10 0SF

    Construction of a two-storey detached family dwelling and associated works.

    3 Feb 2026 Full applications
  • 26/1830/F Decided

    CHARLTON RUGBY CLUB, 60A BROAD WALK, LONDON, SE3 8NB

    Retrospective application for the use of land as a motorcycle training centre (Sui Generis) and i...

    22 Jun 2026 Full applications
  • 26/1396/F Granted

    9-13 POWIS STREET, LONDON, SE18 6HZ

    Changes to the shopfront, including the installation of new emergency fire escape door, and repla...

    7 May 2026 Full applications
  • 25/4091/F Granted

    UNIT 6, 108 NATHAN WAY, THAMESMEAD, SE28 0AU

    Proposed Extension of Existing Dropped Kerb (Additional 5.5m)(Re-consultation)

    5 Dec 2025 Full applications
  • 26/2071/F Decided

    40 THE HEIGHTS, CHARLTON, LONDON, SE7 8JH

    Conversion of the existing side extension into a self contained dwelling.

    14 Jul 2026 Full applications