Skip to content
PlanIndex Get alerts
Menu

Planning application

Browndown Training Camp Browndown Road Lee-On-The-Solent Hampshire PO13 9UG

Awaiting decision Gosport 25/00096/FULL Devt. app. FULL

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

PROPOSED MIXED-USE PHASED REDEVELOPMENT FOLLOWING THE DEMOLITION AND CLEARANCE OF THE SITE, FOR A CARE HOME (USE CLASS C2), 57 NO. DWELLINGS (USE CLASS C3), 3 NO. COMMERCIAL UNITS ACCESSED FROM BROWNDOWN ROAD (CLASS E), PUBLIC OPEN SPACE, SUBSTATION, VEHICULAR ACCESS TO PRIVETT ROAD, PEDESTRIAN/CYCLE ACCESS TO BROWNDOWN ROAD WITH TOUCAN CROSSING, INCLUDING ASSOCIATED LAND RAISING, HIGHWAY, PARKING, LANDSCAPING, DRAINAGE, AND OTHER ANCILLARY WORKS (as amended and amplified by documents received 12.01.26, 06.05.26, 29.05.26 & 19.06.26 - Amended description of development)

As published by the council, reference 25/00096/FULL

Application record

Reference
25/00096/FULL
Type
Devt. app. FULL
Status
Registered
Received
26 Mar 2025
Validated
31 Mar 2025
Ward
Lee West
Postcode
PO13 9UG

Timeline

Dates from the published record

  1. 26 Mar 2025

    Received by Gosport

  2. 31 Mar 2025

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 26 May 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Gosport took a median of 51 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

321 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Gosport for determination, against a statutory target of eight weeks. Over the last year Gosport decided full applications in a median of 55 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Gosport

  • 26/00274/FULL Awaiting decision

    Flat 1 Gomer Court Broadsands Drive Gosport Hampshire PO12 2SE

    REPLACEMENT WINDOW AND DOOR ON FRONT AND SIDE ELEVATIONS

    10 Sep 2026 Full applications
  • 26/00224/FULL Granted

    20 Raynes Road Lee-on-the-solent Hampshire PO13 9AL

    ERECTION OF SINGLE STOREY REAR EXTENSION

    16 Jul 2026 Full applications
  • 26/00226/FULL Granted

    Bay House School Gomer Lane Gosport Hampshire PO12 2QP

    ERECTION OF 2.1-METRE-HIGH BOW TOPPED STEEL FENCING WITH ACCESS GATES

    16 Jul 2026 Full applications
  • 26/00229/FULL Granted

    Alverbridge Nursery 80 South Street Gosport Hampshire PO12 1ES

    ERECTION OF 2NO. REPLACEMENT GARDEN BUILDINGS, PHOTOVOLTAIC PANELS TO THE ROOF OF THE EXISTING BUILDING AND NEW EXTERNAL AIR CONDITIONING UNITS (CONSERVATION AREA)

    22 Jul 2026 Full applications
  • 26/00268/FULL Awaiting decision

    106 Jellicoe Avenue Gosport Hampshire PO12 2PF

    ERECTION OF OUTBUILDING TO REAR GARDEN FOR USE AS RESIDENTIAL ANNEXE

    28 Aug 2026 Full applications