Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 0/1 13 Kirklee Terrace Glasgow G12 0TH

Granted Glasgow City 26/01507/LBA

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Internal and external alterations

As published by the council, reference 26/01507/LBA

Application record

Reference
26/01507/LBA
Status
Decided - Grant Subject to Condition(s)
Decision
Grant Subject to Condition(s)
Received
15 Jul 2026
Validated
15 Jul 2026
Decided
10 Sep 2026
Ward
Partick East/Kelvindale
Postcode
G12 0TH

Site history

Applications at this address on the Glasgow City register

This site has had 2 applications since 2026: 1 approved, 0 refused.

  • 26/01508/FUL Decided

    Flat 0/1 13 Kirklee Terrace Glasgow G12 0TH

    External alterations to rear of flatted property

    Submitted 15 Jul 2026 Full applications

Timeline

Dates from the published record

  1. 15 Jul 2026

    Received by Glasgow City

  2. 28 Jul 2026

    Added to PlanIndex

  3. 10 Sep 2026

    Decision issued: Grant Subject to Condition(s)

  4. 10 Sep 2026

    Status changed to Decided - Grant Subject to Condition(s)

    Previously Pending - Consideration.

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

  • UPPER GROUND FLOOR AS PROPOSED Drawing · 02 Sep 2026
  • HISTORIC ENVIRONMENT SCOTLAND Consultee Comment · 03 Aug 2026
  • BLOCK PLAN Drawing · 15 Jul 2026
  • UPPER GROUND FLOOR AS EXISTING Drawing · 15 Jul 2026
  • NORTH AND SOUTH ELEVATIONS AS EXISTING Drawing · 15 Jul 2026
  • SECTION AA AS EXISTING Drawing · 15 Jul 2026
  • ROOF, REAR SVP AS EXISTING Drawing · 15 Jul 2026
  • UPPER GROUND FLOOR AS PROPOSED Drawing · 15 Jul 2026
  • NORTH AND SOUTH ELEVATIONS AS PROPOSED Drawing · 15 Jul 2026
  • SECTION AA AS PROPOSED Drawing · 15 Jul 2026
  • APPLICATION FOR LISTED BUILDING CONSENT Application Form · 15 Jul 2026
  • LOCATION PLAN Drawing · 15 Jul 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Glasgow City granted permission on 10 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Glasgow City's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres