Skip to content
PlanIndex Get alerts
Menu

Planning application

488 Dumbarton Road Glasgow

Granted Glasgow City 26/01451/LBA

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of replacement windows

As published by the council, reference 26/01451/LBA

Application record

Reference
26/01451/LBA
Status
Decided - Grant Subject to Condition(s)
Decision
Grant Subject to Condition(s)
Received
7 Jul 2026
Validated
21 Jul 2026
Decided
14 Sep 2026
Ward
Victoria Park

Site history

Applications at this address on the Glasgow City register

This site has had 2 applications since 2026: 2 approved, 0 refused.

  • 26/01450/FUL Granted

    488 Dumbarton Road Glasgow

    Installation of replacement windows.

    Decided 14 Sep 2026 Full applications

Timeline

Dates from the published record

  1. 7 Jul 2026

    Received by Glasgow City

  2. 21 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. 14 Sep 2026

    Decision issued: Grant Subject to Condition(s)

  5. 14 Sep 2026

    Status changed to Decided - Grant Subject to Condition(s)

    Previously Pending - Consideration.

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

  • PROPOSED ELEVATIONS Drawing · 03 Sep 2026
  • PROPOSED ELEVATIONS Drawing · 01 Sep 2026
  • EXISTING ELEVATIONS Drawing · 20 Aug 2026
  • PROPOSED ELEVATIONS Drawing · 20 Aug 2026
  • SK01 _A - DESIGN STATEMENT Other · 20 Aug 2026
  • EXISTING ELEVATIONS Drawing · 21 Jul 2026
  • COVER LETTER Other · 21 Jul 2026
  • SK01 - DESIGN STATEMENT Other · 21 Jul 2026
  • CERTIFICATE A Other · 21 Jul 2026
  • EXISTING ELEVATIONS Drawing · 07 Jul 2026
  • PROPOSED ELEVATIONS Drawing · 07 Jul 2026
  • LISTED BUILDING CONSENT APPLICATION Application Form · 07 Jul 2026
  • A LOCATION PLAN Drawing · 07 Jul 2026
  • DESIGN STATEMENT Other · 07 Jul 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Glasgow City granted permission on 14 September 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Glasgow City's portal will say. Our guide explains the common types.