Skip to content
PlanIndex Get alerts
Menu

Planning application

26/01015/FUL

Storey Ground 120 Bath Street Glasgow G2 2EN

Awaiting decision Glasgow City Full Planning Permission

Proposal

External alterations including installation of quench pipe, ductwork, external plant, roller shutters and associated works

As published by the council, reference 26/01015/FUL

Timeline

Dates from the published record

  1. 12 May 2026

    Received by Glasgow City

  2. 18 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Glasgow City for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00633/ADV Awaiting decision

    134 Wellington Street Glasgow G2 2XL

    Display of non-illuminated signage.

    27 Mar 2026 41m away Advertising
  • 26/00634/LBA Awaiting decision

    134 Wellington Street Glasgow G2 2XL

    Display of non-illuminated signage.

    27 Mar 2026 41m away Heritage and listed buildings
  • 26/00851/LBA Awaiting decision

    Abode Hotel 129 Bath Street Glasgow G2 2SZ

    Replacement lighting and display of signage.

    23 Apr 2026 62m away Heritage and listed buildings
  • 26/00852/ADV Awaiting decision

    Abode Hotel 129 Bath Street Glasgow G2 2SZ

    Display of illuminated and non-illuminated signage.

    23 Apr 2026 62m away Advertising
  • 23/01369/DOC04 Granted

    184 Sauchiehall Street Glasgow G2 3EE

    Demolition of existing building and redevelopment of site incorporating facade retention, erection of mixed-use development including purpose built student accommodation (Sui Generis) and short-stay (non-term time) accommodation (Sui Generis); retail and professional services (Class 1A), restaurant (Class 3) uses, and non-residential institutions (Class 10) uses; with associated landscaping, access and infrastructure - Discharge of conditions 23, 27 and 29 of planning permission PPA-260-2167.

    19 Feb 2026 120m away Conditions
  • 26/01289/FUL Awaiting decision

    184 Sauchiehall Street Glasgow G2 3EE

    Use of retail unit (Class 1A) as marketing suite (Sui-generis)

    17 Jun 2026 121m away Full applications

In Glasgow City

  • 26/01516/FUL Awaiting decision

    73 Monreith Road Glasgow G43 2PE

    Erection of single storey extension to rear of dwellinghouse.

    16 Jul 2026 Full applications
  • 26/01509/FUL Awaiting decision

    124 Observatory Road Glasgow G12 9AD

    Formation of driveway opening and gates

    15 Jul 2026 Full applications
  • 26/01508/FUL Awaiting decision

    Flat 0/1 13 Kirklee Terrace Glasgow G12 0TH

    External alterations to rear of flatted property

    15 Jul 2026 Full applications
  • 26/01499/FUL Awaiting decision

    8 Barochan Road Glasgow G53 5YH

    Erection of single storey extension to side of dwellinghouse

    14 Jul 2026 Full applications
  • 26/01496/FUL Awaiting decision

    142 Balgrayhill Road Glasgow G21 3AE

    Installation of vent to side elevation.

    14 Jul 2026 Full applications